Seismic Improvement Program Presented to: The Northern California Earthquake Hazards Workshop February 12, 2014.

Slides:



Advertisements
Similar presentations
Ground failures: Vibration of soil Fault rupture Liquefaction Ground lurching Differential settlement Lateral spreading.
Advertisements

Putting USGS Research to Use: User Perspectives on Research Evolution, Accomplishments, and Challenges USGS Earthquake Hazards Program (EHP) Lloyd S. Cluff.
PHENIX & The Beam Pipe. 1)Overview of the drawings 2)I will break down the beam pipe going from MuID-S to MuID-N piece by piece. 3)Important Information.
Seismology and Earthquake Engineering :Introduction Lecture 3
DESIGN LAYOUT OF DISTRIBUTION SYSTEMS
Presented by: Ronald O. Nichols LADWP General Manager
September 29-30, 2011 Drinking Water Program Sustained Compliance Workshop Lee Johnson, P.E
Earthquakes in San Francisco, California - Structural Engineering Solutions -
2 3 4 Supports co-equal goals of “Delta Vision” Delta ecosystem restoration Water supply reliability Ecosystem Improvement Comprehensive multi-species/ecosystem.
Seismic and Tsunami Threats to Southern California Nancy King, Ph.D. U.S. Geological Survey Pasadena Field Office Northridge earthquake 1994 Northridge.
Earthquake Risk Management Program Pacific Gas & Electric Company Kent Ferre, SE Manager Geosciences Department Northern California Earthquake Hazards.
The Problems with Long Bolt Flanges in process pipe connections when exposed to a fire!!
Topic I.8. Water Supply Networks: Kinds, Structures and Design
EBMUD: A Decade of Seismic Mitigation Progress – More Work to Do By Bill Cain, S.E. Project Manager Seismic Mitigation Planning Member, ABAG Lifeline Infrastructure.
Instrumented Moment Frame Steel Buildings Models Erol Kalkan, PhD California Geological Survey PEER-GMSM First Work Shop, Berkeley Oct
Tigard_WSP_0410. Existing System Miles of Pipe 2.Twenty One Pressure Reducing Valves (PRV) 3.Seven Pump Stations 4.Two Aquifer Storage and Recovery.
MEP201 Mechanical Engineering Drawing 1 st semester S R Kale Lecture Piping Drawings.
CE HYDRAULICS ENGINEERING
Earthquake Damage Can Be Reduced
1 Yahya C. Kurama, Professor Civil and Environmental Engineering and Earth Sciences University of Notre Dame Introduction to Engineering Program University.
1 Yahya Gino Kurama, Associate Professor Civil Engineering and Geological Sciences University of Notre Dame Introduction to Engineering Program University.
Washington County, Oregon March 19, 2014 Board Meeting Engineering Department Report.
The San Andreas Fault By Kevin Buckley And Nicholas Schuch, Esquire.
Future Bay Area Earthquakes – Water & Sewer Issues JEANNE PERKINS ABAG Earthquake and Hazards Program Consultant.
Villanova University Dept. of Civil & Environmental Engineering CEE 8414 – Structural Dynamics Northridge Earthquake 1 Northridge Earthquake - Concrete.
Other Construction Projects
FSRUG Presentation – January 2014 Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 3 Reactor Feed Water (FW) Clean Up Piping Break.
Federal Emergency Management Agency Unit U nit 3- Mitigation Measures by Type of Disaster.
1 SAN DIEGO COUNTY WATER AUTHORITY PIPELINE RELINING PROGRAM Keeping the Water Flowing.
Reading Structural Drawings
Urban Water Department of Hydro Sciences, Institute for Urban Water Management Peter Krebs Dresden, Global water aspects 1 Introduction to urban.
Close-up view of damage to the Government Hill School located at the head of a landslide.
Department of Civil Engineering,
ELK MEADOWS HOA Water Master Plan (Supply, Treatment, Distribution, and Storage) May 2005.
Bay Area Earthquake Impacts and Earthquake Impacts on Utilities and Transportation Systems Infrastructure Interdependencies Workshop I – Utilities and.
Best for the Buck: Using Asset Management for Project Design at Highline Water District Matthew J. Maring, P.E. April 30, 2008.
Bay Area Earthquakes – Utility & Lifeline Issues Bay Area Earthquakes – Utility & Lifeline Issues JEANNE PERKINS Consultant, ABAG Earthquake and Hazards.
Network Appurtenances Major operations within a water transport and distribution systems are: 1. Transmission. 2. Storage. 3. Pumping.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
America’s Natural Gas Utilities’ Distribution Pipelines November 2, 2006 The Connection To the Customer.
Northern California Earthquake Hazards Workshop February 12, 2014.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
 Earthquake Earthquake  LA Earthquake damage LA Earthquake damage  Risk Map Risk Map  Earthquake Earthquake  "San Francisco" Earthquake - YouTube.
Earthquake Resistant Building designs. Buildings are designed to withstand vertical forces. Buildings are designed to withstand vertical forces. If earthquakes.
How Engineers Prepare for
1 Case Study: Pacific Gas & Electric Company San Francisco Lifelines Council Edwards Salas Senior Vice President, Engineering and Operations, PG&E February,
MODULE 2 Operate the Propane Liquid Supply System.
 Project Capacity: 54 MGD  Water Purchase Agreement: 30-year take-if-delivered contract with San Diego County Water Authority for water purchase of.
1. 2 Regional water wholesaler to 6 counties covering 5,200 square miles Serves 19 million people = 50% of the state’s population with projected population.
1 7.3 Earthquakes and Society. 2 Have you experienced an earthquake? How did you feel? What did you do to protect yourself?
Components of Water Networks Eng. Mona Al-Gharbawi Eng. Ayman Al-Afifi
California Geology. Geology of California Plate tectonics responsible for a lot of features –Sierra Nevadas formed by subduction –Volcanoes of Cascade.
Design of Beam-Column Connections in Steel Moment Frames
Vulnerable Structural Elements
SF Bay Regional Area and the CA Coast. Satellite Image of SF Bay.
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
Proposed Balanced Design Procedure
Colorado Springs Utilities CH2M HILL Alumni Retreat
Water System Seismic Study and Emergency Response Planning
Concrete Repair.
RESIDENTIAL PLUMBING SYSTEMS (WATER SUPPLY)
“Base isolation and Seismic Consideration in Civil Engineering”..
Water Department has Six Divisions
1989 Loma Prieta Earthquake Mitigation and Reconstruction
Effect of Earthquake on Fire Protection Systems
HUMAN IMPACT FROM CLIMATE CHANGE
Metropolitan Tunnel Redundancy Program Update
Everett Water Supply Resiliency
Presentation transcript:

Seismic Improvement Program Presented to: The Northern California Earthquake Hazards Workshop February 12, 2014

Water Treatment and Distribution 1,300,000 customers 331 square-mile area ~ 4,000 miles of pipe ~ 135 pumping plants ~ 180 reservoirs/tanks ~ 125 pressure zones Elevation: MSL-1450 ft

Seismic Hazards in Service Area

Pressure Zone Damage

Predicted Damage: Seismic Evaluation Program 63% of our customers would be out of water Increased fire risk with 1/3 of reservoirs and 2/3 of pumping plants out of service Claremont Tunnel would be out of service 5,500 pipeline breaks 4 of 6 treatment plants would be out of service

Capital Improvement Program l Package #1 ($3 million) ―Improve service after smaller earthquakes l Package #2 ($84 million) – Limited service improvements after Hayward M-7 l Package #3 ($189 million) – Improved service after Hayward M-7 l Package #4 ($288-$360 million) – Low priority, low benefits

Water Treatment Plants

Column Weld Column Flange Beam Flange Backing Bar Fracture During Earthquake Beam-Column Connection Structural system is a welded steel moment frame Designed to the 1982 Uniform Building Code Seismic Improvement Program implemented in 1994 to provide life safety for all occupied structures Lessons learned from the 1994 Northridge Earthquake Welded joints do not perform as designed Beam Main Administration Building

Viscous Damper in Diagonal Brace State Office Building Project, San Francisco Piston Damper Detail

Pumping Plants

Implementation -Tank Seismic Upgrade Shotcrete over New Anchors Prestressed Strands Shotcrete Cover

Emergency Bypass System Manual isolation valves and by-pass manifolds –Isolate ruptured pipe and restore flow with temporary hoses

Pipeline Fault Crossings and Backbone Pipe at Landslides

Supplying the West of Hills

Southern Loop Pipeline 11-miles 30 inch to 42 inch diameter 1,800 ft. of 9 ft. dia. tunnel Connects Southern Part of Service AreaConnects Southern Part of Service Area

Claremont Tunnel Crosses the Hayward Fault

Claremont Tunnel Before Upgrade

Plan Configuration after design earthquake Section 8.5ft8.5ft carrier pipe i.d: 6ft; length: 85ft

Mokelumne Aqueduct No. 3 Elastomeric seismic isolation bearing install on 351 pipe supports

San Pablo Dam Seismic Upgrade

Chabot Dam Seismic Upgrade

Dam Remediation Design Alternatives Cement Deep Soil Mixing (CDSM)Conventional Earth Replacement

Questions Timothy McGowan Associate Civil Engineer P.O. Box Oakland, CA (510)