ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Unloading Water from Oil Wells Using Air.

Slides:



Advertisements
Similar presentations
________________________________________________________________ What price do you put on pump run rate and production efficiency on your horizontal wells?
Advertisements

Slim hole Production Forrest Collier and Bill Hearn.
New Gas Lift Products & Technology
VSH2 Nitrogen Over Hydraulic Unit
GAS LIFT OPERATION By : Ubet Khoirudin TOTAL E&P INDONESIE.
SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
Oil and Gas Industry Presentation Activities, GHG Emission Sources, and Potential Reductions January 14, 2009.
How Refrigerators and Freezers Work
Drilling Engineering – PE311 Circulating System
ATMATM PETE 689 UBD ATMATM ATMATMATMATM Lesson 17 Flow Drilling Mudcap Drilling Snub Drilling Closed Systems Read: UDM Chapter pages
Lesson 14 Jet Bit Nozzle Size Selection
Forging new generations of engineers. Fluid Power.
Petroleum Engineering 406
Filling, purging and air removal
GARP®Presentation ALRDC Seminar May 14 th, 2014 Daryl Mazzanti – Garp Services, LLC Wholly owned subsidiary of Evolution Petroleum Corp (EPM- NYSEMKT )
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
VALVES TYPE & FUNCTION VALVES.
Basics of Pump Vigyan Ashram, Pabal.
PECTEN CAMEROON COMPANY Subsidiary of SHELL E&P Int’l
Training in Oil & Gas Production for BP Technical Interns Section 9 – Chemical treatment system Chemical treatment systems are an important part of many.
ZF-100 The Paraffin & Asphaltene Solution. ZF-100 The Paraffin & Asphaltene Solution 72% Biodegradable, environmentally friendly ZF-100 is an aggressive.
Adaptive Product Technology for Coalbed Natural Gas (CBM)
Reciprocating Electric Submersible Pump (RESP)
Air Compressors.
WESTAR Oil & Gas Conference October 2008 Lori Bocchino Wyoming Oil & Gas Permitting and New Rule/Policy Revisions.
1 New Production Technologies for Lifting Liquids from Horizontal Wells Radius Energy, LLC May, 2015.
TT Artificial Lift Utilizing CT as a Hollow Sucker Rod Humberto F. Leniek COIL TUBING AMERICAS Dr. William C. Maurer MAURER ENGINEERING INC.
Optimum Performance in Dual Gas-Lift Wells ASME/API/ISO Spring 2004 Gas-Lift Workshop February 10-11, 2004.
ASME – WORK SHOP - KUALA LUMPUR 2003 By:
Completing & Producing A Well
By: Gatut Widianoko Weatherford Artificial Lift Systems
Problem Wells Break out Session 2006 International Sucker Rod Pumping Workshop Houston, Texas.
Gas Lift Redesign in Dual Strings Completion
Pumps and Lift Stations. Background Fluid Moving Equipment Fluids are moved through flow systems using pumps, fans, blowers, and compressors. Such devices.
Scavenge fires Oily carbon deposits build up in the scavenge trunking during normal operation of the engine. Drains are provided in order to remove such.
How to Maintain High Producing Efficiency in Sucker Rod Lift Operations Lynn Rowlan.
David Garvin Product Manager EarthDirEX Geothermal Copyright © 2015 Nortek Inc. All rights reserved.
Analysis of Gas Lift Transient Effects Henry Nickens Adam Ballard BP - Houston.
Tempest Blower SECTION: Tools and Equipment ISSUED: REVISED: ##-####
Equipment Development for Gas-Lift in Sub-Sea Operations Roger Stinson Product Manager - Gas Lift Schlumberger Completions Systems.
2003 ASME/API GAS-LIFT WORKSHOP Dual Gas Lift – EMEPMI Experience
IADC Application Category Category A – Managed Pressure Drilling (MPD) Drilling with returns to surface using equivalent mud weight that is maintained.
Underbalanced Perforating. èEarly tests by Exxon showed that flow patterns and perforation geometry prevent the cleaning out of an appreciable percentage.
Robert Lestz - Chevron 28 Feb 2006 Impact of Surface Facilities on Addressing Liquid Loading Breakout Session.
ARTIFICIAL LIFT METHODS
GLO Offshore South East Asia Steve ‘Gas Lift’ Gossell – MEA Senior Gas Lift Engineer.
Submitted by Pradeep pataskar Roll no.11031M02034.
Introduction to Well Completions
Lecture 10 Production Engineering
EGLV – ELECTRIC GAS LIFT VALVE (Field Trial at S181) - THE OPERATOR’S PERSPECTIVE.
Cost Effective Offset Well Frac-hit Protection Solution
Heat Transfer and Refrigeration Cycle
Heat Transfer and Refrigeration Cycle
INSTRUCTOR © 2017, John R. Fanchi
14 Refrigerant Recovery, Recycling, and Recharging.
SUSTAINABLE DRILLING OF OIL & GAS WELLS
Seating Nipple By-Pass System
Recent Advances in Oil and Gas Production Engineering
Chemical additive solutions to overcome challenges and create value
TUHWALP Introduction Cem Sarica.
INCLUDE BACKGROUND PICTURE
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
Pumps and Lift Stations
Continuous Flow (IPO) Valves
Shell Exploration & Production
A typical lift scenario with tubing landed in the curve
CHAIR - JIM BENNETT EXXONMOBIL
High Liquid Volume Plunger Lift in the Permian Basin
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
Presentation transcript:

ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Unloading Water from Oil Wells Using Air

ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Background Drilling horizontal wells in the Rocky Mountain Region Drilling operation incurred high drilling fine and fluid losses in formation Operator was using rod pumps to produce wells; Severe plugging of pumps and tubing with drilling fines common –RESULT - repeated workovers and had a consequential cost impact

ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Clean Out Issues Before producing wells with rod pumps, operator needed a way to –clean out drilling fines –unload large volumes of water from the formation Different types of artificial lift methods were considered Gas lift was determined to be best lift method when considering large volumes of fluid, producing fines, and cost

ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Injection Gas Source Natural gas was not available in this area Screw compressor availability; used in this area for underbalanced drilling Air considered as injection source Spontaneous combustion issue –Hydrocarbons-Pressure-Temperature –HP 3000 psi / BHT 200 / high water cuts

ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. COMPRESSOR

ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Gas Lift Considerations Well Completion – 2 7/8” tubing inside 5 ½” 17# casing Fluid rate range of 300 to 2500 BFPD Screw compressors using air allowed operating pressures up to 1600 psi and injection volumes of 1.5 mmcf/day Maintain velocities to produce drilling fines

ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Gas Lift - First Attempts Rig would land tubing at 2000’ Air injection through open ended tubing and fluid produce out of casing until blown dry Rig lowered tubing 1000’ to 1500’ and continued air injection / unloading process Eventually air injection through tubing was at 8000’ and well clean up Obtained good results, but at high cost

ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Gas Lift Design Considerations Determined annular lift to be best method to produce high fluid rates and drilling fines 1” IPO valves inside a slimhole SPM were used due to casing constraints Valve ports were sized to inject up to 1.2mmcf/day

ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Operation Drilling rig runs tubing with gas lift mandrels; rig moves off location Compressors are set on location Well is unloaded and monitored until solids were cleaned out and a percentage of oil was seen Workover rig is moved in to pull tubing and remove gas lift mandrels; tubing and rods are run in well for rod pump operation Gas lift mandrels are used for next well

ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Pit Gator

ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Problems / Maintenance Corrosion inhibitor plugged IPO valves Due to environment of injecting air, equipment life was shortened Side pocket mandrels were replaced every 15 to 20 wells; valves replaced every 3 wells Trained operator to pull and run IPO valves in side pocket mandrels; valve and latch stock is kept at field location

ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Results Unloading process is shortened Greater rod and pump life Improved wellbore deliverability Flow back helps optimize rod pump design