ATTENTION This presentation breaks down the purchasing process into 6 steps, which are then detailed in the subsequent slides. While responding from either.

Slides:



Advertisements
Similar presentations
Technical System Options
Advertisements

Module 3: Business Information Systems
Internal Controls Becoming Compliant. Design & Implementation of Internal Controls. Design: Need to show that a framework is in place to establish internal.
Business Research Requests and Proposals
Lecture 8 Selecting a Healthcare Information System (Chapter 8)
Network Design and Implementation
Selecting and implementing hospitality information systems
Acquiring Information Systems and Applications
Designing new systems or modifying existing ones should always be aimed at helping an organization achieve its goals State the purpose of systems design.
IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer 2003.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2004.
Systems Design, Implementation, Maintenance, and Review
Introduction to SAP R/3.
© 2003, Educational Institute Chapter 11 System Selection Managing Technology in the Hospitality Industry Fourth Edition (469T or 469)
Accounting Principles, 6e Weygandt, Kieso, & Kimmel
1 Principles of Information Systems, Ninth Edition Chapter 13 Systems Development: Design, Implementation, Maintenance, and Review.
Information Systems Controls for System Reliability -Information Security-
Database Administration Chapter 16. Need for Databases  Data is used by different people, in different departments, for different reasons  Interpretation.
Chapter 17 Acquiring and Implementing Accounting Information Systems
Library Automation: Planning and Implementation
MONITOR CATERING REVENUE AND COSTS
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
Chapter 22 Systems Design, Implementation, and Operation Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 22-1.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Pre-Project Activities Text Chapters 5 and 6. Pre-Project Activities 1.Contract Review 2.Development Plan 3.Quality Plan.
1 CAPACITY BUILDING AND TRAINING ON PROCUREMENT Session 9 – The World Bank Procedures for IT Procurement September 21, 2005 by Arif Hassan.
Understanding Information Systems. Information System (IS) An IS is a combination of people, hardware, software, computer networks, and data that organizations.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill Technology Education Copyright © 2006 by The McGraw-Hill Companies,
Asset & Security Management Chapter 9. IT Asset Management (ITAM) Is the process of tracking information about technology assets through the entire asset.
SCSC 311 Information Systems: hardware and software.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Contracting and Negotiation DOQ-IT Education Session Contracting and Negotiations.
Guest Cycle A division of the flow of business through a hotel that identifies the physical contacts and financial exchanges between guests and hotel employees.
Systems Development: Design, Implementation, Maintenance, and Review
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
CHAPTER 13 Acquiring Information Systems and Applications.
Screening and Selecting Software. HRIS Project Phases NeedsAnalysis Design & Development Implementation & Maintenance.
 2001 Prentice Hall Business Publishing, Accounting Information Systems, 8/E, Bodnar/Hopwood Systems Implementation, Operation, and Control Chapter.
Service Level Agreements Service Level Statements NO YES The process of negotiating and defining the levels of user service (service levels) required.
Computer Concepts 2014 Chapter 10 Information Systems Analysis and Design.
Module 4: Systems Development Chapter 14: Design And Implementation.
CHAPTER 2 TYPES OF BUSINESS INFORMATION SYSTEM. INTRODUCTION Information System support business operations by processing data related to business operation.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
OHT 15.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Templates The contribution of templates to software quality The organizational.
Copyright©2001 by Houghton Mifflin Company. All rights reserved. 1 Financial Accounting Belverd E. Needles, Jr. Marian Powers Multimedia.
Copyright © 2007 Pearson Education Canada 23-1 Chapter 23: Using Advanced Skills.
Chapter 12 The Network Development Life Cycle
State of Georgia Release Management Training
Introduction to Databases Dr. Osama AL Rababah. Objectives In this capture you will learn: Some common uses of database systems. The characteristics of.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Accounting systems design & evaluation 9434SB 18 March 2002.
Computer Technology: Your Need to Know Chapter 1 Slide 1.
ITEC 275 Computer Networks – Switching, Routing, and WANs
Accounting Information Systems: An Overview
Principles of Information Systems Eighth Edition
Supporting quality devices
System Design, Implementation and Review
Fundamentals of Information Systems, Sixth Edition
Information Systems Selection
Needs Analysis & Alternative IT investment strategies Pertemuan 3-4
CLINICAL INFORMATION SYSTEM
The System Selection Process Part II:
Request for Proposal and Selection Procedures
Information Systems, Ninth Edition
The System Selection Process Part II:
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Chapter # 5 Supporting Quality Devices
The System Selection Process Part II:
Presentation transcript:

ATTENTION This presentation breaks down the purchasing process into 6 steps, which are then detailed in the subsequent slides. While responding from either the printed material or this will be OK, some may find this easier to understand.

WHAT ARE THE 6 STEPS TO SELECT AND IMPLEMENT A COMPUTER SYSTEM? n STEP 1. ANALYZING THE CURRENT INFORMATION NEEDS OF THE BUSINESS n STEP 2. COLLECT RELEVANT COMPUTER SYSTEMS SALES LITERATURE n STEP 3. ESTABLISH COMPUTER SYSTEM REQUIREMENTS n STEP 4. REQUESTING PROPOSALS FROM VENDORS n STEP 5. EVALUATION VENDOR PROPOSALS n STEP 6. CONTRACT PROVISIONS

STEP 1. ANALYZING THE CURRENT INFORMATION NEEDS OF THE BUSINESS (2 Parts to this step) n Part 1. IDENTIFY INFORMATION NEEDS: n Part 2. CREATE A PROPERTY PROFILE

Part 1. IDENTIFY INFORMATION NEEDS: (3 components) n 1. Compiling samples of all reports presently prepared for management. –Daily operations reports –Weekly forecasts –Cash flow analysis –Labor productivity analysis –Departmental analysis –Room rate analysis –Return on Investment –Exception reporting –Guest history analysis –Future booking reports

Part 1. IDENTIFY INFORMATION NEEDS: (3 components) n 2. Analyze the purpose, content, and use of these reports.(Flowchart)

Part 1. IDENTIFY INFORMATION NEEDS: (3 components) n 3. Identify any gaps or improvements that can be made.

Part 2. CREATE A PROPERTY PROFILE n 1. A property profile is a set of descriptive statistics that allows the comparison of this operation to others to help identify similarities and differences. This information can be used by vendors to establish if existing programs have been used in similar operations and how they have functioned. n This information should also include any equipment that is currently in use and if these functions are best integrated into a new system or equally efficient as individual systems.

STEP 2. COLLECT RELEVANT COMPUTER SYSTEMS SALES LITERATURE (2 parts) n Part 1. SOURCES OF INFORMATION n Trade Associations n Trade shows have been n Visit local vendors n Request information from reputable vendor across the country.

STEP 2. COLLECT RELEVANT COMPUTER SYSTEMS SALES LITERATURE (2 parts) n Part 2. SPECIFIC INFORMATION TO REQUEST –Hardware documentation –Software documentation –List of current product users –Sample report formats –Sample training materials –Annual financial statements of the vendor –Purchase/lease options –User support and maintenance programs.

STEP 3. ESTABLISH COMPUTER SYSTEM REQUIREMENTS (4 parts) n Part 1. DETERMINE DATA TO PROCESS –Data Identification: –Data Collection: –Data Entry –Data Coding

STEP 3. ESTABLISH COMPUTER SYSTEM REQUIREMENTS (4 parts) n Part 2. DETERMINE HOW TO PROCESS DATA The way the system is programmed to manipulate the data should be in line with the desires and expectations of management.

STEP 3. ESTABLISH COMPUTER SYSTEM REQUIREMENTS (4 parts) n Part 3. DETERMINE INFORMATION FORMATS –Reservation Confirmation –Registration cards –Guest Folio –Billing statements –Payroll checks n Part 4. Determining the hardware configuration –Stand-Alone –Distributed –Integrated

STEP 4. REQUESTING PROPOSALS FROM VENDORS n Section 1: Description of business n Section 2: Bidding requirements n Section 3: Specific Computer Systems Applications Requirements.

STEP 5. EVALUATION VENDOR PROPOSALS n Multiple rating system n Vendors business reputation n Comparing Direct, Indirect, and hidden costs of each system.

STEP 6. CONTRACT PROVISIONS (3 PARTS) n Part 1. GENERAL PROVISION – Terms of delivery – Terms of payment – Survival past delivery – Saleable product warranty – Catastrophe remedies – Provisions for breach of contract

STEP 6. CONTRACT PROVISIONS (3 PARTS) n Part 2. HARDWARE PROVISIONS –Specifications and performance criteria – Delivery, installation, and testing requirements –Costs and terms of payment Reliability tolerances –Maintenance programs options

STEP 6. CONTRACT PROVISIONS (3 PARTS) n Part 3. SOFTWARE PROVISIONS –Escrow of source code for performance failures –Specifications and performance criteria –Delivery, installation, and testing requirements –Costs and terms of payment –Reliability tolerances –Support systems –Upgrades and updates

REQUEST FOR PROPOSAL (RFP 3 sections) n RFP Section 1: Description of business n RFP Section 2: Bidding requirements n RFP Section 3: Specific Computer Systems Applications Requirements.

RFP Section 1: Description of business n Property profile n Objectives for the computer System n Operational requirements for the Computer system n Hardware configuration n Payment options n Future expandability of the system n Software descriptions n Vendors future responsibilities

RFP Section 2: Bidding requirements n Standardized response form

RFP Section 3: Specific Computer Systems Applications Requirements. n Standardized response form for information requested.

WHAT ARE THE THREE TYPES OF CONTRACTUAL ARRANGEMENTS LISTED IN THE CHAPTER? n SINGLE-VENDOR CONTRACT n TWO-VENDOR CONTRACT n TURNKEY PACKAGE

WHAT ARE THE INSTALLATION FACTORS n TRAINING n SITE PREPARATION n DESIGN OF PRINTED MATERIALS n INITIAL ENTRY OF DATABASE ELEMENTS n ACCEPTANCE TESTING n SYSTEM CONVERSION n DOCUMENTATION n CONTINGENCY PLANNING n VENDOR SUPPORT

WHAT IS A MANAGEMENT INFORMATION SYSTEM? A management information system is designed to provide managers with the necessary information to plan, organize, staff, direct, and control operations. n Monitor progress of organizational goals n Measure performance n Identify trends n Evaluate alternatives n Support decision making n Assist in corrective action

WHAT IS INFORMATION PROCESSING TECHNOLOGY? n Established the communication process in which data are transferred from independent computer systems and physically transformed into the information requested. –Reservations –POS –CAS –Energy Management System –Payroll –Accounting

WHO ARE THE MIS MANAGEMENT STAFF AND WHAT FUNCTIONS DO THEY PERFORM? n Property systems manager: n Department systems supervisor:

WHAT IS A MULTI- PROCESSOR ENVIRONMENT? A multi-processor environment results from interfacing independent computer processing units (CPU), enabling them to share data, peripheral devices and operating systems.

SYNERGY: n The whole is greater than the sum of its parts. n The interfaced system has advantages over the "stand alone" systems because:

SYSTEMS TESTING: n Usually one application is brought on-line at a time and tested. Each module should with other systems and stand alone as individual modules.

CONTRACT CONSIDERATIONS: n What are the organizations rights to alter the code in the software packages purchased? n Can you add code to include a particular interface? n Will altering the code change any existing maintenance agreements? n To what degree will each vendor involved support the interface?

WHAT IS DOWNTIME AND MULTI-TASKING AND HOW DOES IT IMPACT THE ORGANIZATION? n DOWNTIME: n MULTI-TASKING:

WHAT ARE THE THREE TYPE OS MIS SECURITY WHAT ARE THE THREE TYPE OS MIS SECURITY n ENERGY BACKUP SYSTEMS: n INFORMATION BACKUP PROCEDURES: –REDUNDANT COPY –DUPLICATE COPY –HARD COPY –FAULT-TOLERANT PROCESSING n INFORMATION PROTECTION:

Keeping information out of the wrong hands is an important consideration. FRAUD n Functional division of duties. n Recovery. n Avoid tampering. n Unauthorized access prevention. n Detection and correction.