National Cranberry Cooperative

Slides:



Advertisements
Similar presentations
STOCK CONTROL Inventory is often referred to as the graveyard of business because over investment in stock is a frequent cause of business failure.
Advertisements

Capacity Planning For Products and Services
Economic Resources and Systems
© 2009 Pearson Prentice Hall. All rights reserved. Process Costing.
Millions of acres of cotton grow across the Southern United States.
John Wiley & Sons, Inc. Prepared by Karleen Nordquist.. The College of St. Benedict... and St. John’s University.... Managerial Accounting Weygandt, Kieso,
CAPACITY LOAD OUTPUT.
JAVA Coursework (the same for 2A and 2B). Fundamental Information The coursework is 30 marks in your O’Level = 15% of the exam Must be word processed.
3. 7 MBPF. Orange Juice Inc. produces and markets fruit juice
5.6 Production Planning The last one!!. The cost of STOCKS Stocks are materials and goods required to allow the production and supply of products to the.
Lean Management AS Economics and Business Unit 2b
Jobs and Unemployment. When you have completed your study of this chapter, you will be able to C H A P T E R C H E C K L I S T Define the unemployment.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster An Introduction to Cost Terms and Purposes Chapter 2.
2 - 1 An Introduction to Cost Terms and Purposes Chapter 2.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. OPIM 310 –Lecture #8 Just-In-Time.
capacity planning and control
Factors of Production The factors of production include Factors of production  what people use Renewable resource  it can be drawn on Non-renewable resource.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Management Accounting: A Business Partner Chapter 16.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective 1 Define and illustrate a cost object. Chapter.
SchedulingProducingControllingSchedulingProducingControlling.
Capital Budgeting and Investment Analysis
CHAPTER 5 SUPPLY By Mr. Pillsbury 10 vocabulary words.
Economic Instability.
Job-Order Costing Is used when different types of batches or products are produced special order printing, construction, law office.
QueueTraffic and queuing theory +. 2 Queues in everyday life You have certainly been in a queue somewhere. –Where? –How were they different?  We encounter.
Making investment decisions with the Net Present Value rule This town's full of money grabbers Go ahead-Bite the Big Apple, don't mind the maggots, huh.
VIRTUAL BUSINESS RETAILING
2 Chapter Two Basic Cost Management Concepts and Accounting for Mass Customization Operations.
Macroeconomics THE BIG PICTURE
1 ISE 195 Fundamentals of Industrial & Systems Engineering.
Economic Resources and Systems Chapter 2. Do Now In your notebooks: What is a resource? What resources do you use on a daily basis? How and why do you.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 20 1.
Costs Associated with Owning and Operating a Small Business.
* Since the late 1970’s China’s economy has been growing at a very fast pace. * Today the factories of China manufacture products for much of the world.
Price: Supply and Demand Together 9B Social – Economics.
 By now you should have completed study guide pgs. 1-9 and read chapter one of your text.  Review want satisfaction chain  What is profit?  What kinds.
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Work for Food, Clothes and Toys Social Studies Online Grade 2.
UNDERSTANDING DEMAND This section will be one of the easiest to understand. You live out this section nearly every day. SUMMARY OF SECTION – This section.
1 C H A P T E R 8 1 © 2001 Prentice Hall Business PublishingEconomics: Principles and Tools, 2/eO’Sullivan & Sheffrin Production and Cost Market Structures.
Workplace Math Presenters: Reda Berry Tristyn Davis April 2012.
Massachusetts General Hospital's Pre-Admission Testing Area (PATA)
Aggregate Planning.
AGGREGATE PLANNING Rachmat A. Anggara 9th of April 2010.
How Much Are You Worth?. Your work is only worth as much as people are prepared to pay for it or as much as your prepared to do it for.
SchedulingProducingControllingSchedulingProducingControlling.
MINGZHE HAN (CMP TUTOR) COMM 204 Review Session. Outline T ABLE OF C ONTENT (Basic Information) (Process Analysis) (Multiple Types and the Product Process.
PROPOSAL Charlie William Meyer. CHAR-LAYS BEDS Founded in 1673 Our mission: Supply all people with a bed. Even those who cannot afford one. Testimony:
A item is marked 25% off and then you are given an additional discount of 10%. What will you pay? Are receiving a total of 35% off? Explain why or why.
Chapter 11 Managing Inventory throughout the Supply Chain
Simulation Chapter 16 of Quantitative Methods for Business, by Anderson, Sweeney and Williams Read sections 16.1, 16.2, 16.3, 16.4, and Appendix 16.1.
The Production Process What are the four stages of production? How are things mass produced?
Calculating Average Weekly Wages Web Feb RISE to the challenge of determining which method to use: A. Regular workweek and consistent earnings,
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster An Introduction to Cost Terms and Purposes Chapter-2.
1 Mix Model for Executives FMS 200 Series FBP-FMS288A.
SchedulingProducingControllingSchedulingProducingControlling.
7 th Grade Social Studies Instructor: Mr. Babcock.
9 Sales and Operations Planning: Planning Supply and Demand in a Supply Chain.
Introduction to Cost Accounting and the Job Order Cost Cycle
Activity-Based Costing
Process Analysis Guanyi Lu September 18, 2018.
9 Sales and Operations Planning: Planning Supply and Demand in a Supply Chain.
Aggregate Planning FAISAL FARIS BIN RAHIM
Just-In-Time and Lean Production
Capacity Planning For Products and Services
Capacity Planning For Products and Services
How long must the plant operate on peak days?
Chapter 5 Supply.
Manufacturing Production Planning
Capacity Planning For Products and Services
Presentation transcript:

National Cranberry Cooperative Process Flow: Receiving Cranberries Weighing Sampling Grading Dumping (If the dumping cannot be performed cranberries are held in the trucks until they can be processed) Storing Cranberries into Bins Dry bins Dual bins (you have to decide how these dual bins are allocated) Wet bins

Process Flow Process breaks into two different patterns for dry and wet cranberries at this point: Dry Crop: Destoning Dechaffing Seprators/Baily Mill Packaging Wet Crop: Drying

Assumptions 18,000 bbls per day uniformly distributed over 12 hours starting 7am. Average truck delivery load is 75 bbls. 70% of the berries are wet. Bailey mill rates are same as the separators and the Bailely mill process time is determined based on the second quality berries not the potential second quality berries. Figures D and E, will give you the start time of each process and number of both types of workers available. Do not compute overtime from figure E, overtime should be computed so that there are no cranberries left in the system.

Questions What are the problems RP1 facing? All the problems that are mentioned in the case and anything extra that comes to your mind. Draw process flow. What is the bottleneck? Remember that only processes can be bottleneck. Do not forget to consider the number of machines in each station. How does the backlog grows on a peak day? Using Figure E and the bottleneck rate you can compute how the inventory of cranberries in the system will change. The difference between what can be kept in the system and what is cumulated in the system is how the backlog is growing.

Questions How much overtime labor is used, how much money does that represent? Comparing number of workers in each section in Figure E with Figure D you can compute the number of regular and seasonal workers. Considering the changes in the backlog from the previous case and number of workers in each section from Figure E you can compute the total overtime cost. How much waiting cost is incurred? Using the information above and the method explained at the end of assumptions you would be able to compute this. Remember that wait cost is per truck waiting not per barrel. What recommendations? Buying dryers and/or converting bins? Do the cost analysis and determine how many dryers you would buy and how many bins would you pay for if any. Any recommendation independent of equipment purchase?