Chapter 12 Lean Manufacturing.

Slides:



Advertisements
Similar presentations
Lean Manufacturing & Just-in-Time
Advertisements

14–1. 14–2 Chapter Fourteen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
JIT AND LEAN PRODUCTION SYSTEM BY AMAR P. NARKHEDE.
Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., –1 Managerial Issues Using JIT as a tool for controlling the flow of materials,
Chapter 9: Lean Manufacturing © Holmes Miller 1999.
Just-in-Time. © The McGraw-Hill Companies, Inc., 2004 B Operations -- Prof. Juran2 Outline The Goal debrief JIT Defined The Toyota Production.
Just-in-Time and Lean Systems
Just-In-Time and Lean Systems
Just-in-Time and Lean Systems
© The McGraw-Hill Companies, Inc., Chapter 11 Just-in-Time and Lean Systems.
Just-In-Time Philosophy
© 2007 Pearson Education Lean Systems Chapter 9. © 2007 Pearson Education How Lean Systems fits the Operations Management Philosophy Operations As a Competitive.
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
Lean Systems and JIT.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
JIT and Lean Operations
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
JIT and Lean Operations. MRP (push) and JIT (pull) system PULL SYSTEM PUSH SYSTEM A PUSH system where material is moved on to the next stage as soon as.
Lean and Sustainable Supply Chains. 1. Describe how Green and Lean can complement each other. 2. Explain how a production pull system works. 3. Understand.
Operations Management
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Alissa Brink Gabriela Iasevoli Jason Oesterle Joey Tamburo
ISQA 459 Mellie Pullman 1.  JIT can be defined as an integrated set of activities designed to achieve high-volume production using minimal inventories.
Just-in-time Prof. Jiang Zhibin Dept. of IE, SJTU.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
The philosophy of JIT can be traced back to Henry Ford, but formalized JIT originated in Japan as the Toyota Production System. W. Edwards Deming’s lesson.
Lean Production - Objectives
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
© 1997 Prentice-Hall, Inc Principles of Operations Management Just-In-Time Systems Chapter 11.
Just-in Time Management Supplier Partnerships B7801 April 17, 1998
Manufacturing.  Manufacturing is all about converting raw material into consumer or industrial products.  A firms manufacturing competency is based.
Just-In-Time & Lean Systems
Chapter 7 – Just-in-Time and Lean Systems
Just-in-Time and Lean Systems
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
Chapter 12 Just-in-Time and Lean Manufacturing. What is JIT? (Just-in-Time) An operations philosophy involving many techniques for improving the effectiveness.
The philosophy of JIT can be traced back to Henry Ford, but formalized JIT originated in Japan as the Toyota Production System. W. Edwards Deming’s lesson.
Lean and Sustainable Supply Chains
1 Slides used in class may be different from slides in student pack Chapter 12 Just-in-Time and Lean Systems  JIT Defined  The Japanese Approach to Productivity.
1 Slides used in class may be different from slides in student pack Chapter 12 Lean/Just-in-Time (JIT) Production  JIT Defined  The Japanese Approach.
1 Just-in-time. 2 Supply Networks  organisations connected by server-client links - upstream/downstream - that service processes & activities (operations)
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 12 Lean Manufacturing (Just-in-Time)
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
Module 9: JIT & Lean Systems Operations Management as a Competitive Weapon.
Lab #4: Pull and Perfection MG/IE 3400 – Production System Design.
Operations Fall 2015 Bruce Duggan Providence University College.
© The McGraw-Hill Companies, Inc., Just-in-Time and Lean Systems.
Production and Operations Management: Manufacturing and Services
EMBA-2, BUP EO Just-in-Time / Lean Production.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Purposes of Inventory 1. To maintain independence of operations. 2. To meet variation in product demand. 3. To allow flexibility in production scheduling.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 12 Lean Production.
Best Performing Consulting Organization by “JIT & Lean Manufacturing” Adding Value In Totality !!
Lean Manufacturing CHAPTER 9. After completing the chapter you will:  Learn how a production pull system works  Study Toyota Production System concepts.
JIT and Lean Operations Just-In-Time (JIT) Defined 1. JIT can be defined as an integrated set of activities designed to achieve high-volume production.
Lean Management Class 52/16/11.
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Pull Manufacturing and Just In Time
Lean Management Class 52/16/11.
Chapter 12 Just-in-Time and Lean Systems
Chapter 12 Lean Production. Chapter 12 Lean Production.
JIT(JUST-IN-TIME) VARUN BABU
Presentation transcript:

Chapter 12 Lean Manufacturing

After completing the chapter you will: 12-2 Learning Objectives After completing the chapter you will: Learn how a production pull system works Study Toyota Production System concepts Learn about how value stream mapping can be used to identify wasteful activities See how Kanban cards can be used to control a pull system Understand how to accomplish lean production See examples of lean concepts applied to service systems

12-3 Lean Production Lean Production can be defined as an integrated set of activities designed to achieve high-volume production using minimal inventories (raw materials, work in process, and finished goods) Lean Production also involves the elimination of waste in production effort Lean Production also involves the timing of production resources (i.e., parts arrive at the next workstation “just in time”) 3

Then sub-assembly work is pulled forward by that demand… Here the customer starts the process, pulling an inventory item from Final Assembly… Pull System Customers Sub Fab Vendor Final Assembly Then sub-assembly work is pulled forward by that demand… The process continues throughout the entire production process and supply chain 4

Features of Lean Production Management philosophy “Pull” system though the plant WHAT IT IS Attacks waste Exposes problems and bottlenecks Achieves streamlined production WHAT IT DOES Employee participation Industrial engineering/basics Continuing improvement Total quality control Small lot sizes WHAT IT REQUIRES Stable environment WHAT IT ASSUMES 13

The Toyota Production System 12-6 The Toyota Production System Based on two philosophies: 1. Elimination of waste 2. Respect for people 5

Focused factory networks Group technology Quality at the source 12-7 Elimination of Waste Focused factory networks Group technology Quality at the source JIT production Uniform plant loading Kanban production control system Minimized setup times 6

Minimizing Waste: Focused Factory Networks 12-8 These are small specialized plants that limit the range of products produced (sometimes only one type of product for an entire facility) Minimizing Waste: Focused Factory Networks Some plants in Japan have as few as 30 and as many as 1000 employees Coordination System Integration 7

Minimizing Waste: Group Technology (Part 1) 12-9 Minimizing Waste: Group Technology (Part 1) Note how the flow lines are going back and forth Using Departmental Specialization for plant layout can cause a lot of unnecessary material movement Saw Saw Saw Grinder Grinder Heat Treat Lathe Lathe Lathe Press Press Press 8

Minimizing Waste: Group Technology (Part 2) 12-10 Minimizing Waste: Group Technology (Part 2) Revising by using Group Technology Cells can reduce movement and improve product flow Grinder 1 2 Lathe Press Saw Lathe Heat Treat Grinder A B Lathe Press Saw Lathe 9

Minimizing Waste: Uniform Plant Loading (heijunka) 12-11 Minimizing Waste: Uniform Plant Loading (heijunka) Suppose we operate a production plant that produces a single product. The schedule of production for this product could be accomplished using either of the two plant loading schedules below. Not uniform Jan. Units Feb. Units Mar. Units Total 1,200 3,500 4,300 9,000 or Uniform Jan. Units Feb. Units Mar. Units Total 3,000 3,000 3,000 9,000 How does the uniform loading help save labor costs? 12

Minimizing Waste: Inventory Hides Problems 12-12 Minimizing Waste: Inventory Hides Problems Example: By identifying defective items from a vendor early in the production process the downstream work is saved Work in process queues (banks) Change orders Engineering design redundancies Vendor delinquencies Scrap Design backlogs Machine downtime Decision Inspection Paperwork backlog Example: By identifying defective work by employees upstream, the downstream work is saved 14

Minimizing Waste: Kanban Production Control Systems 12-13 Minimizing Waste: Kanban Production Control Systems This puts the system back were it was before the item was pulled Once the Production kanban is received, the Machine Center produces a unit to replace the one taken by the Assembly Line people in the first place Withdrawal kanban Storage Part A Storage Part A Machine Center Assembly Line Production kanban Material Flow Card (signal) Flow The process begins by the Assembly Line people pulling Part A from Storage 15

Cooperative employee unions Subcontractor networks 12-14 Respect for People Level payrolls Cooperative employee unions Subcontractor networks Bottom-round management style Quality circles (Small Group Involvement Activities or SGIA’s) 21

Toyota Production System’s Four Rules 12-15 Toyota Production System’s Four Rules All work shall be highly specified as to content, sequence, timing, and outcome Every customer-supplier connection must be direct, and there must be an unambiguous yes-or-no way to send requests and receive responses The pathway for every product and service must be simple and direct Any improvement must be made in accordance with the scientific method, under the guidance of a teacher, at the lowest possible level in the organization 21

Lean Implementation Requirements: Design Flow Process 12-16 Lean Implementation Requirements: Design Flow Process Link operations Balance workstation capacities Redesign layout for flow Emphasize preventive maintenance Reduce lot sizes Reduce setup/changeover time 23

Lean Implementation Requirements: Total Quality Control 12-17 Lean Implementation Requirements: Total Quality Control Worker responsibility Measure SQC Enforce compliance Fail-safe methods Automatic inspection 24

Lean Implementation Requirements: Stabilize Schedule 12-18 Lean Implementation Requirements: Stabilize Schedule Level schedule Underutilize capacity Establish freeze windows 25

Lean Implementation Requirements: Kanban-Pull 12-19 Lean Implementation Requirements: Kanban-Pull Demand pull Backflush Reduce lot sizes 26

Lean Implementation Requirements: Work with Vendors 12-20 Lean Implementation Requirements: Work with Vendors Reduce lead times Frequent deliveries Project usage requirements Quality expectations 27

Lean Implementation Requirements: Reduce Inventory More 12-21 Lean Implementation Requirements: Reduce Inventory More Look for other areas Stores Transit Carousels Conveyors 28

Lean Implementation Requirements: Improve Product Design 12-22 Lean Implementation Requirements: Improve Product Design Standard product configuration Standardize and reduce number of parts Process design with product design Quality expectations 29

Lean Implementation Requirements: Concurrently Solve Problems 12-23 Lean Implementation Requirements: Concurrently Solve Problems Root cause Solve permanently Team approach Line and specialist responsibility Continual education 29

Lean Implementation Requirements: Measure Performance 12-24 Lean Implementation Requirements: Measure Performance Emphasize improvement Track trends 29

Lean in Services (Examples) 12-25 Lean in Services (Examples) Organize Problem-Solving Groups Upgrade Housekeeping Upgrade Quality Clarify Process Flows Revise Equipment and Process Technologies 30

Lean in Services (Examples) 12-26 Lean in Services (Examples) Level the Facility Load Eliminate Unnecessary Activities Reorganize Physical Configuration Introduce Demand-Pull Scheduling Develop Supplier Networks 31

Answer: d. All of the above 12-27 Question Bowl Lean Production seeks to achieve high volume production using which of the following? Minimal inventory of raw materials Minimal inventory of work-in-process Minimal inventory of finished goods All of the above None of the above Answer: d. All of the above 7

Answer: d. All of the above 12-28 Question Bowl In the Toyota Production System, the “elimination of waste” involves which of the following? Overproduction Waiting time Transportation All of the above None of the above Answer: d. All of the above 7

12-29 Question Bowl In the Pull System the partner that begins the process of “pulling” is which of the following? Customers Vendors Fabrication personnel CEO All of the above Answer: a. Customer 7

A Lean Production program requires which of the following? 12-30 Question Bowl A Lean Production program requires which of the following? Employee participation Total quality control Small lot sizes Continuing improvement All of the above Answer: e. All of the above (Also included in Industrial engineering/basics) 7

Answer: d. All of the above 12-31 Question Bowl Inventory has been known to hide which of the following production problems? Scrap Vendor delinquencies Decision backlogs All of the above None of the above Answer: d. All of the above 7

12-32 Question Bowl When trying to implement Lean system a “stabilized schedule” includes which of the following? Demand pull Backflush Fail-safe methods All of the above None of the above Answer: e. None of the above (These include: level schedule, underutilization capacity, and establish freeze windows.) 7

12-33 End of Chapter 12