Considerations on ILC Crossing Angle K. Yokoya 2013.11.14 LCWS13, BDS, Tokyo Univ. 2013/11/12 LCWS Yokoya1 Motivation Gamma-gamma collider CLIC.

Slides:



Advertisements
Similar presentations
Beam-Beam Effects for FCC-ee at Different Energies: at Different Energies: Crab Waist vs. Head-on Dmitry Shatilov BINP, Novosibirsk FCC-ee/TLEP physics.
Advertisements

Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 1 Introduction & Overview O Compton polarimetry basics.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
International Linear Collider Gamma-Gamma Options Tohru Takahashi Hiroshima University Mar LCWS2005  /e  e-e- Physics and Technology.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
20 March 2005Ken Moffeit LCWS1 Highlights from the MDI workshop Spin Rotation System for 2 IR’s Downstream polarimetry Ken Moffeit.
Energy Extendibility of ILC Kaoru Yokoya (KEK) for the Group D T. Sanuki, B. Barish, H. Yamamoto, H. Hayano, Y. Yamamoto Tohoku Forum of Creativity,
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
Photon Collider at CLIC Valery Telnov Budker INP, Novosibirsk LCWS 2001, Granada, Spain, September 25-30,2011.
The Linear Collider – accelerator design A particle beam accelerator is a microscope – the resolution is inversely proportional to the energy of the beams.
1 Q3 Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
___________________ Jürgen Schreiber, ECFA/DESY LC workshop, Amsterdam, April 1-4, 2003 BEAM ENERGY SPECTROMETER DESY – Dubna – TU Berlin Machine physicists,
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Valery Telnov Budker INP, Novosibirsk LCWS 2012, Arlington, US, October 24, 2012 Photon colliders: summary.
1 Options for low energy spin manipulation Ken Moffeit, SLAC 2009 Linear Collider Workshop of the Americas 29 September to 3 October 2009 K. Moffeit, D.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Si D in 14mrad/14mrad/z=0 ILC T. Markiewicz/SLAC SiD Advisory Group 14 August 2006.
Laser cooling of electron beams Valery Telnov Budker INP, Novosibirsk Nanobeam-2008 BINP, May 26-29, 2008.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
LCWS2004 Paris 1 Beam background study for GLC Tsukasa Aso, Toyama College of Maritime Technology and GLC Vertex Group H.Aihara, K.Tanabe, Tokyo Univ.
Photon collider: ILC configuration and IR issues ( how to make 14mr compatible with gamma-gamma) Valery Telnov Budker INP IRENG07, Sept.18, 2007, SLAC.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
October 20, 2006 Global Design Effort 1 ILC Interaction regions : The GDE perspective Talk based on several talks presented by BDS area leaders Andrei.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
February, INP PAN FCAL Workshop in Cracow W. Lohmann, DESY The BCD (Baseline Configuration Document) The next calendar dates Where we are with FCAL.
ParameterL-bandS-bandX-band Length (m) Aperture 2a (mm) Gradient (Unloaded/Loaded) (MV/m)17/1328/2250/40 Power/structure (MW) Beam.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
Manchester Christmas meeting 2006: The ILC interaction region and beyond Rob Appleby Happy New Year everyone!
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
Ken Moffeit SLAC LCWA09 1 Polarization Considerations for CLIC Ken Moffeit, SLAC 2009 Linear Collider Workshop of the Americas 29 September to 3 October.
N. Walker, K. Yokoya LCWS ’11 Granada September TeV Upgrade Scenario: Straw man parameters.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Beam Delivery (wg4) update since Snowmass Andrei Seryi for WG4 GDE meeting December 8, 2005 Snowmass 2005 GDE Meeting at INFN-LNF.
September 2007SLAC IR WS Very Forward Instrumentation of the ILC Detector Wolfgang Lohmann, DESY Talks by M. Morse, W. Wierba, myself.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
P OSSIBILITIES FOR MAINTAINING AA AND PP CAPABILITIES IN PARALLEL WITH E RHIC V. Ptitsyn Collider-Accelerator Department BNL RHIC and AGS Users Meeting,
CLIC Re-baselining CSC, October Possible CLIC stages studied 2.
LCWS Paris – April 19-23, 2004 Polarimeter Issues K. Peter Schüler Polarimeter Issues 1 Polarimeter Studies for TESLA O General Considerations O.
1 Gamma Gamma Collider Physics Report Tim Barklow SLAC Apr 18, 2009.
Implication of gamma-gamma on 14mr tunnels discussion (questions for discussion with WG-C and WG-A) Valery Telnov Budker INP IRENG07, Sept.19, 2007, SLAC.
11/18/2008 Global Design Effort 1 Summary for Gamma-Gamma Mayda M. Velasco Northwestern University November 20, 2008 LCWS08 -- UIC, Chicago.
CR1: Insert Dogleg K. Yokoya CMB mtg /9/25 CMB Yokoya1.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
K. Yokoya LCCPDeb at ECFA LC 2016, Jun.1
Test of Hybrid Target at KEKB LINAC
Layout of Detectors for CLIC
Auxiliary Positron Source
Dr. D. Z. LI & Prof. J. GAO Accelerator Center, IHEP
AD & I : BDS Lattice Design Changes
Valery Telnov Budker INP, Novosibirsk TILC09, Tsukuba April 21, 2009
Updates on IR and FF for super-B factory
ERL accelerator review. Parameters for a Compton source
BDS civil construction Single IR upgrade scenarios discussion
Study of e+ e- background due to beamstrahlung for different ILC parameter sets Stephan Gronenborn.
ATF project meeting, Feb KEK, Junji Urakawa Contents :
NLC 2001 Beam Delivery Layout
AC Power for a Super-B Factory
Beam-Beam Effects in High-Energy Colliders:
MEIC Alternative Design Part V
Crab Crossing Named #1 common technical risk (p. 6 of the report)
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

Considerations on ILC Crossing Angle K. Yokoya LCWS13, BDS, Tokyo Univ. 2013/11/12 LCWS Yokoya1 Motivation Gamma-gamma collider CLIC

Motivation ILC will be a green field lab in a newly constructed town Need far future possibilities, as many as possible, though totally unclear now May include, e.g., – gamma-gamma – CLIC – Plasma.... Try not to exclude them from the beginning – I would like to propose ILC tunnel compatible to various projects – I am not proposing to construct CLIC in Japan As for the crossing angle, reasonable possibilities are – ILC 14mrad  20mrad – or CLIC 20mrad  14mrad – The former has an advantage of accepting gamma-gamma, too 2013/11/12 LCWS Yokoya2

Gamma-Gamma Issue Design in RDR/TDR TDR: Crossing angle 14mrad – Gamma-gamma not mentioned – 25mrad needed for gamma-gamma During the study for RDR, rearrangement for gamma- gamma was discussed – 14mrad  25mrad – Or 20mrad  25mrad – 14mrad  25mrad is better because the two dump systems are too close in the case 20mrad  25mrad (Valery) In any case, once going to  - , it is absolutely necessary to switch back to e+e- again Not realistic to spend too much time to move to  -  2013/11/12 LCWS Yokoya3

4 14mr => 25mr additional angle is 5.5mrad (=(25-14)/2) and detector need to move by about 3-4m A.Seryi, LCWS m This doesn’t look realistic Big CFS work including new main dumps Detector compatibility? Compatible with push-pull? (This plot was created before push-pull)

IR Geometry crossing angle angle for outgoing beam 14 mrad4.5 mrad 20 mrad10.5 mrad 25 mrad15.5 mrad 2013/11/12 LCWS Yokoya5 The required angle for outgoing beam is proportional to sqrt(N/  z )

Possible Trade Off Adopt 20mrad for e+e- from the beginning Should be satisfied with 20mrad in  -  too  This should be possible if sqrt(N/  z ) is reduced Luminosity may be a bit lower Even in this case a change of beam dump is necessary at switching to  -  – ~10MW photon dump – Small angle (1/  ), straight. – Telnov proposed diffusion in high-pressure Argon gas. – But nobody has thought about its hard ware 2013/11/12 LCWS Yokoya6

What must be studied for the Compatibility with  -  ? How large is the luminosity reduction with the smaller angle 20mrad compared with the traditional  -  design 25mrad ? – Decrease N/  z by factor (15.5/10.5) 2 = 2.2 – e.g., reduce N by factor 1.5, increase  z by 1.5 What do we lose in e+e- in the change 14mrad  20mrad ? – Luminosity does not change – Lose some forward angle coverage – Angle between solenoid and beam (DID/anti-DID issue) – Timing tolerance of crab cavity – What else? IR and dump system design – must be compatible with later installation of  -  dump 2013/11/12 LCWS Yokoya7

CLIC Can ILC tunnel accommodate CLIC in the far future? Difference in the tunnel shape – Crossing angle : 14mrad vs. 20mrad – Geoid-following vs. laser-straight – Offset due to undulator scheme Note: – Cost saving by reuse of tunnel is ~1.2B$ CLIC-ILC General Issue Group Interim Report 1 nterim-Report_Final-1.pdf nterim-Report_Final-1.pdf In addition, save 0.25B$ if reuse Main linac klystron for CLIC driver (but CLIC frequency must be changed 12GHz  11.7GHz) 2013/11/12 LCWS Yokoya8

Crossing Angle Crossing angle (for e+e-) – 20mrad for CLIC (3TeV), 14mrad for ILC More precisely, these are angles between the two linacs CLIC 500GeV adopts 18mrad as the crossing angle with the linac angle 20mrad (This change does not require civil engineering) – Are these really necessary? What must be studied? What does ILC lose in e+e- in the change 14mrad  20 mrad ? – Luminosity does not change – Lose some forward angle coverage – Angle between solenoid and beam (DID/anti-DID issue) – Timing tolerance of crab cavity – What else? What does CLIC lose in the change 12mrad  14 mrad ? 2013/11/12 LCWS Yokoya9

Laser-straight vs. geoid-following CLIC: laser-straight ILC: geoid-following – BDS is laser-straight Too late to change ILC to laser straight Does geoid-following allow 3TeV? Emittance increase by radiation is tolerable The largest issue now seems to be the calibration error of BPMs (beam position monitor) This can be solved in 20 years, I believe 2013/11/12 LCWS Yokoya10

Offset Due to Undulator Scheme Electron linac and electron BDS is not on the same line due to the undulator scheme About ~2m offset Is this acceptable for 1.5TeV beam with CLIC emittance? ~800m will be available for installing the necessary bends 2013/11/12 LCWS Yokoya11 ~ 2m

Summary If we can make the ILC tunnel compatible (at least not incompatible) to various projects, this will greatly expand the future possibility of the ILC lab and the town We should unify the crossing angle of ILC and CLIC I prefer 20mrad because of the compatibility with gamma-gamma Serious studies should be done in the next half year or at most one year by the time detailed CFS design starts 2013/11/12 LCWS Yokoya12