DRAFT – FOR DISCUSSION PURPOSES ONLY © 2000 - 2015 New York Independent System Operator, Inc. All Rights Reserved. FERC’s Order on Possible BSM for ROS.

Slides:



Advertisements
Similar presentations
Brookfield Renewable Energy Group. Focusing on Renewable Power Generation and Transmission Conceptual discussion how to integrate renewable resources under.
Advertisements

Better Align Capacity Markets with Policy/Planning Objectives James Daly, VP Energy Supply Restructuring Roundtable Sept 21, 2012.
Closing the Sale and Following Up. Recognizing Customer Buying Signals n Things a customer will do or say to indicate a readiness to buy. n Included:
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Transmission Independence and Investment Pricing Policy for Efficient Operation and Expansion of the Transmission Grid FERC Docket Nos. AD and.
Draft Action Plan Update – Agenda Item No. 5D Central Valley Flood Protection Board.
1 July 15, 2007Alcoa Energy Regulatory Affairs NARUC / FERC Demand Response Collaborative Perspectives of a Large End Use Participant of NYISO Programs.
Highlights of the 2004 State of the Market Report New York Electricity Markets David B. Patton, Ph.D. Potomac Economics Independent Market Advisor May.
Price Undertakings Under U.S. Antidumping Duty Law Prepared by Import Administration, U.S. Department of Commerce for the June 2 nd Korea Trade Commission’s.
Transmission Congestion on the Delmarva Peninsula December 17, 2003 PA
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2014 New York Independent System Operator, Inc. All Rights Reserved. Emergency Transfer Criteria NYSRC Reliability.
Valuing Economic Benefits from Transmission Planning ERCOT System Planning March 22, 2006.
Energy Issues in Peru and the Andes: Environmental and Social Aspects George Washington University January 28, 2005 Dr. Robert H. Montgomery Head, Environmental.
1 Non-Transmission Alternatives to Reduce Local Congestion Costs Bill Bojorquez June 3, 2004.
32853 Evaluation of Demand-Response Programs in the Competitive Electric Market Workshop 1 September 15, 2006 Shawnee Claiborn-Pinto.
Overview of the Capacity Markets in the United States 2008 APEX Conference in Sydney, Australia October 13-14, 2008 Hung-po Chao Director, Market Strategy.
1 Capacity Markets Investment in Generation Capacity Payments October 31, 2005 J. W. Charlton.
Colombian Firm Energy Market: Discussion and Simulation Peter Cramton (joint with Steven Stoft and Jeffrey West) 9 August 2006.
Public Market Surveillance Panel Consultation on CMSC Issues Related to Constrained off Payments to Generators and Imports Market Operations Standing Committee.
1 Independent Market Monitoring in the Midwest ISO Presented to: Federal Energy Regulatory Commission David B. Patton, Ph.D. Independent Market Monitor.
2014 Reports to the Minister Markets Team Ken Michael Room, 25 September 2014 Ensuring quality services for a reasonable price 1 Workshop.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
MICROECONOMICS: Theory & Applications By Edgar K. Browning & Mark A. Zupan John Wiley & Sons, Inc. 10 th Edition, Copyright 2009 PowerPoint prepared by.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
1 New York State Reliability Council …….. Promoting Electric System Reliability in New York State Presentation to the MEUA Annual Meeting September.
Date Create your footer by changing copy in the Header and Footer section1 Network Rail’s Strategic Agenda Calvin Lloyd.
Demand Response in Energy and Capacity Markets David Kathan FERC IRPS Conference May 12, 2006.
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
Demand Response as Capacity in New York National Association of Regulatory Utility Commissioners Winter Committee Meetings Washington, DC February 17,
Page 1 Structure of the Code Don Thomson, Working Group Chair and IESBA Member IESBA CAG Meeting April 10, 2013 New York.
OPSI Annual Meeting October 13, Session 6 Reliability Pricing Model: Are Further Changes Necessary? Reluctantly…yes But States should also be.
ERCOT Market Credit Working Group Presentation to the Finance and Audit Committee Payment Short Pay/Default and Uplift for Congestion Revenue rights (CRRs)
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
WSPP Webinar Proposed Service Schedules Operating Reserve Service (D) Intra-Hour Supplemental Power (E) February 4, 2010.
Market Working Group Update Presentation to CAWG March 29, 2011 Jim Sanderson, KCC.
Market Credit Risk Standard Key components Cheryl Yager August 20, 2008.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
The RGGI Auction Allocation Process: Concerns and Recommendations Presented by James H. Savitt, Ph.D To The RFF Auction Workshop in NYC 20 July 2006.
Chapter 18 Consumer Behavior and Pricing Strategy
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. The Federal Reserve System Chapter 14.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
NYISO Capacity Markets: Function, Performance, and Future Presented to: Joint Technical Conference on New York Markets & Infrastructure Docket No. AD
DER Provide Grid Services for the 21 st Century Electric System Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy More Than Smart Conference.
NPRR784 Mitigated Offer Caps for RMR Units Protocol Revision Subcommittee June 16,
Bad Moon Rising in ERCOT RMR 1. “So you're going to be talking in a minute about an RMR contract in Houston, and that should concern you.” “…what other.
Stages of Research and Development
Overview of the NYISO Demand Response Programs
RAC Implementation Status
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
Status Update for Reliability/Market Power Mitigation Assessment
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Closing the Sale and Following Up
Modification Proposal 0283 Update
Duquesne Light Company Makes Heads or Tails of “PJM Market Design Proposals Addressing State Public Policy Initiatives Capacity Repricing” OPSI 2017.
Closing the Sale and Following Up
Professional Skepticism – Longer-Term Initiative
FERC Order in Devon Power LLC, et al. ER
RAC Implementation Status
Minor Amendments to Housing Incentives Policy
Proposal to Revise Appendix D of NYSRC Policy 5
Ofgem presentation to Gas Transmission Workstream
„The WTO-Anti-Dumping Agreement“
Closing the Sale and Following Up
Audit Evidence Bob Dohrer, Audit Evidence Working Group Chair
Presentation transcript:

DRAFT – FOR DISCUSSION PURPOSES ONLY © New York Independent System Operator, Inc. All Rights Reserved. FERC’s Order on Possible BSM for ROS and for Uneconomic Retention Lorenzo Seirup Supervisor, ICAP Market Mitigation New York Independent System Operator April 30, 2015 ICAPWG/PRLWG Rensselaer, NY

© New York Independent System Operator, Inc. All Rights Reserved. 2 DRAFT – FOR DISCUSSION PURPOSES ONLY Background and Objective  On March 19, 2015 the FERC issued an order directing the NYISO to establish, and report on, a stakeholder process  150 FERC ¶ 61,214, FERC Docket No. EL  In general, the FERC asked that the NYISO look at:  Whether there are circumstances that warrant the adoption of BSM measures in Rest of State (ROS)  Whether there is a need for, and what mitigation measures would need to be in place to address, repowering agreements with the potential to suppress capacity prices  The NYISO’s report to the FERC is due June 17, 2015

© New York Independent System Operator, Inc. All Rights Reserved. 3 DRAFT – FOR DISCUSSION PURPOSES ONLY Background and Objective (con’t)  The FERC’s Order noted that (¶69-71)  The unique aspects of the Dunkirk repowering agreement are cause for concern “We are concerned that if the additional capacity created by the repowering agreement above the amount needed for short-term reliability is allowed to offer into the NYISO capacity market at prices below the cost of repowering, such capacity might deter new entry or displace less- costly existing capacity in NYCA.”  However, some questions remain that should be discussed through the NYISO’s stakeholder process “…there is no existing policy in NYISO for how buyer-side market power mitigation would apply to repowering agreements…” “Thus, we would still need to develop criteria for evaluating repowered resources before applying mitigation…”  The NYISO is seeking stakeholder input on the following: “whether there are circumstances that warrant the adoption of buyer-side mitigation rules in the rest-of-state” “whether resources under repowering agreements [that] have the characteristics of new rather than existing resources, triggering a buyer-side market power evaluation because of their potential to suppress prices in the capacity market and what mitigation measures need to be in place to address such concerns.” The analysis the NYISO has begun and possible next steps

© New York Independent System Operator, Inc. All Rights Reserved. 4 DRAFT – FOR DISCUSSION PURPOSES ONLY NYISO Study Objectives  The NYISO has retained FTI Consulting to help it explore the question of whether there is a need to extend buyer-side mitigation measures to ROS  The study will explore: The potential short-term and long-term impacts of supply subsidized by out-of-market payments The NYISO will examine these in light of the CONE What incentives there may be for Load Serving Entities in ROS to subsidize supply The elasticity of ROS supply and its relevance to attempts to suppress prices Imports and exports, at a minimum, may be price responsive in the short term and could potentially counterbalance the addition of subsidized supply Historic data and market behavior

© New York Independent System Operator, Inc. All Rights Reserved. 5 DRAFT – FOR DISCUSSION PURPOSES ONLY Repowering Agreements  The NYISO expects to leverage the results of the study on ROS mitigation  The findings of the study will help inform this analysis, however the costs associated with repowering and retention are highly variable  At a high level, the NYISO expects to evaluate the study’s findings on the incentives and viability of short-term and long-term price suppression in light of the costs to repower or otherwise retain an existing out-of-market unit  In addition, the NYISO is examining concerns with these types of agreements as part of the development of its response to FERC’s RMR Order

© New York Independent System Operator, Inc. All Rights Reserved. 6 DRAFT – FOR DISCUSSION PURPOSES ONLY Discussion  Are there specific scenarios, circumstances, or facts that might warrant BSM in ROS?  What would BSM measures for out-of-market repowering-type agreements look like?  What additional items should the NYISO study consider?

© New York Independent System Operator, Inc. All Rights Reserved. 7 DRAFT – FOR DISCUSSION PURPOSES ONLY  The NYISO will consider input received during today’s meeting  The NYISO will seek input from Potomac Economics on the analysis performed by FTI and the NYISO  Stakeholders are encouraged to provide comments and analysis in writing to  The NYISO will return to Stakeholders at an ICAP Working Group in May to discuss and seek input on the results of the study  The NYISO will consider that input and have a further discussion with stakeholders  Compliance report is due June 17 Next Steps

8 © New York Independent System Operator, Inc. All Rights Reserved. DRAFT – FOR DISCUSSION PURPOSES ONLY