(non-)Destructive high-rate tests on silicon strip modules Emulating LHC beam incidents using the PS booster and measuring the effect on a LHCb Velo silicon.

Slides:



Advertisements
Similar presentations
Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
IAP-PAI 25/05/20051 CMS Si Rad. Hardness Introduction Damage in Si Neutron tests => Beam => Irrad. Setup.
Trapping in silicon detectors G. Kramberger Jožef Stefan Institute, Ljubljana Slovenia G. Kramberger, Trapping in silicon detectors, Aug , 2006,
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
November 7th 2002Jim Libby (CERN/SLAC)1 Opposite Polarity Signals in Wide Pitch Sensors Jim Libby (CERN/SLAC) Introduction to the R&D in LHCb The test-beam.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Study of the MPPC Performance - contents - Introduction Fundamental properties microscopic laser scan –check variation within a sensor Summary and plans.
First results from the HEPAPS4 Active Pixel Sensor
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology, on behalf of the CMS ECAL Group High-resolution, high-granularity.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
Manuel FahrerCMS Week TB Meeting /6 1-Shot Test Beam CERN CMS: M.Huhtinen, R.Hammarstrom, A.Macpherson CERN ATLAS, PS, Karlsruhe CMS  Overview.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
TCT+, eTCT and I-DLTS measurement setups at the CERN SSD Lab
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Rate and Gain Measurements of the 1-m long GEM detector Aiwu Zhang EIC tracking R&D weekly meeting.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Performance of SPIROC chips in SKIROC mode
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
The ATLAS Pixel Detector - Running Experience – Markus Keil – University of Geneva on behalf of the ATLAS Collaboration Vertex 2009 Putten, Netherlands,
Sally Seidel 1 3D Sensor Studies at New Mexico Sally Seidel for Martin Hoeferkamp, Igor Gorelov, Elena Vataga, and Jessica Metcalfe University of New Mexico.
Radiation Damage in the CMS Strips Tracker Christian Barth on behalf of the CMS Tracker Collaboration.
ALBA Synchrotron – 17 June 2010 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona First Measurements on 3D Strips Detectors.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
Diamond Sensor Diamond Sensor for Particle Detection Maria Hempel Beam Impact Meeting Geneva,
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
LHCb VErtex LOcator & Displaced Vertex Trigger
News on microstrip detector R&D —Quality assurance tests— Anton Lymanets, Johann Heuser 12 th CBM collaboration meeting Dubna, October
October, 2001CMS Tracker Electronics1 Module studies at IC OUTLINE laboratory setup description, APV I2C settings pulse shape studies (dependence on ISHA,
Technology Overview or Challenges of Future High Energy Particle Detection Tomasz Hemperek
Charge Collection and Trapping in Epitaxial Silicon Detectors after Neutron-Irradiation Thomas Pöhlsen, Julian Becker, Eckhart Fretwurst, Robert Klanner,
Collimator BPM electronics – Results from the lab, SPS and LHC
Report on CMS 3D sensor tests Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
P. 1Mario Deile – Meeting on Experiment Protection from Beam Failures Protecting TOTEM Mario Deile PH-TOT
SIAM M. Despeisse / 29 th January Toward a Gigatracker Front-end - Performance of the NINO LCO and HCO Matthieu Despeisse F. Osmic, S. Tiuraniemi,
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
The RICH Detectors of the LHCb Experiment Carmelo D’Ambrosio (CERN) on behalf of the LHCb RICH Collaboration LHCb RICH1 and RICH2 The photon detector:
TCT measurements with SCP slim edge strip detectors Igor Mandić 1, Vladimir Cindro 1, Andrej Gorišek 1, Gregor Kramberger 1, Marko Milovanović 1, Marko.
1 P.Rebecchi (CERN) “Monitoring of radiation damage of PbWO 4 crystals under strong Cs 137  irradiation in GIF-ECAL” “Advanced Technology and Particle.
LHCb Vertex Detector and Beetle Chip
Production Readiness Review of L0/L1 sensors for DØ Run IIb R. Demina, August, 2003 Irradiation studies of L1 sensors for DØ 2b Regina Demina University.
The LHCb Vertex Locator Lars Eklund LHCb VELO Group of the LHCb Collaboration CERN (Geneva), EPFL (Lausanne), NIKHEF (Amsterdam), University of Glasgow,
PPAC in ZDC for Trigger and Luminosity Edwin Norbeck University of Iowa Luminosity Workshop November 5, 2004.
CNM double-sided 3D strip detectors before and after neutron irradiation Celeste Fleta, Richard Bates, Chris Parkes, David Pennicard, Lars Eklund (University.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
A novel two-dimensional microstrip sensor with charge division readout M. Fernández, R. Jaramillo, F.J. Muñoz, I. Vila IFCA (CSIC-UC) D. Bassignana, M.
Philip Bambade, Pierre Barillon, Frédéric Bogard, Selma Conforti, Patrick Cornebise, Shan Liu, Illia Khvastunov Journée PHIL
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
TCT measurements with strip detectors Igor Mandić 1, Vladimir Cindro 1, Andrej Gorišek 1, Gregor Kramberger 1, Marko Milovanović 1, Marko Mikuž 1,2, Marko.
Performance of the LHCb Vertex Locator Thomas Latham (on behalf of the LHCb VELO group) 11/06/20111TIPP Chicago.
Beam detectors in Au+Au run and future developments - Results of Aug 2012 Au+Au test – radiation damage - scCVD diamond detector with strip metalization.
24/02/2010Richard Bates, 5th Trento workshop, Manchester1 Irradiation studies of CNM double sided 3D detectors a. Richard Bates, C. Parkes, G. Stewart.
Calorimeter Mu2e Development electronics Front-end Review
Position Sensitive TCT Measurements with 3D-stc detectors
The Silicon Drift Detector of the ALICE Experiment
Simulated vertex precision
Radiation Damage Studies for Solid State Sensors Subject to Mrad Doses
FCPPL, Clermont-Ferrand , 8-10 April, 2014
LHCb Velo: commissioning, performance and High flux tests.
(proxy for Harris Kagan) for the RD42 Collaboration
The Pixel Hybrid Photon Detectors of the LHCb RICH
Angela Gligorova on behalf of the AEgIS and Medipix collaborations
Vertex Detector Overview Prototypes R&D Plans Summary.
LHC Morning Meeting - G. Arduini
Peter Kodyš, Zdeněk Doležal, Jan Brož,
Setup for testing LHCb Inner Tracker Modules
The LHCb VErtex LOcator
Presentation transcript:

(non-)Destructive high-rate tests on silicon strip modules Emulating LHC beam incidents using the PS booster and measuring the effect on a LHCb Velo silicon strip module Lars Eklund, on the behalf of the LHCb Collaboration

14 September, 2009 L. Eklund, Vertex Outline Introduction –Motivation and previous publications The participants –The PS booster and the LHCb/VELO module The measurements –Observables and program The surprise –Results and interpretations Summary

14 September, 2009 L. Eklund, Vertex Motivation (1) The LHC Stored beam energy times larger than any previous accelerator New machine, limited operational experience The LHCb Velo Very close to the beam: silicon 7-30 mm distance (moving!) Located next to the injection line TI8 Designed and built: but operation procedures can be changed –LV & HV on/off at injection? Feedback to the machine –Intensity limit at injection –Currently H/W protons and F/W 10 10

14 September, 2009 L. Eklund, Vertex Motivation (2) Possible beam incidents Injection failures: –incomplete or unsynchronized kicker fire=> mostly Alice & LHCb –wrong magnet settings in transfer line=> mostly Alice & LHCb –wrong magnet settings in the LHC=> everybody Circulating beam failures: (mostly caught by collimators) –magnet failure / mishap=> everybody –RF failure=> everybody –collimator failure / mishap=> everybody Extraction failures: –Under-kick, unsynchronized beam dump=> mostly CMS

14 September, 2009 L. Eklund, Vertex Previous studies Atlas silicon strip sensors: LASER (2 types) –IEEE Trans. Nucl. Sci. NS47 (2000) 1902 –Voltage across AC coupling vs. R RC &C RC Atlas silicon strip: 1064 nm LASER (1 W) –NIM A 541 (2005) –Beam spot 8 µm, 10 ns pulse, 10 9 MIP equivalent –Damage: HV bias > MIP (on one strip) CMS silicon strip: 24 GeV protons (CERN/PS) –NIM A 518 (2004) –Beam spot 10x3 cm 2, 42 ns bunch, 2 bunches of 7x10 10 protons –No damage Atlas pixel: 24 GeV protons (CERN/PS) –NIM A 565 (2006) 50 –Beam spot 6x3 cm 2, 42 ns bunch, 8 bunches of 1x10 11 protons –No damage

14 September, 2009 L. Eklund, Vertex The PS booster Resto 2 Mainbldg

14 September, 2009 L. Eklund, Vertex The beam line Proton beam with 1.4 GeV energy Intensity: 2x10 9 – 9x10 12 p Beam spot: 5 mm (max 4x10 13 p/cm 2 ) Bunch length: ~200 ns Cf. tests in the PS: max 3x10 10 p/cm 2 Compare with LHC Pilot injection: 2x10 9 protons (450 GeV) –300 µm beam spot –0.4 ns bunch length Full luminosity (L=10 34 ) SPS injection train –288 bunches of protons –4x10 13 protons/cm 2 /bunch

14 September, 2009 L. Eklund, Vertex The set-up Module mounted close to the beam dump –Back-splash gives non-negligible dose –Rough estimate of dose: n eq & 1 kGy (very preliminary) Small scale experiment

14 September, 2009 L. Eklund, Vertex The victim LHCb/Velo spare from production Double sided (R & Phi sensors) 2048 AC coupled n-on-n strips / side 16 FE chips (IBM 0.25 µm) Mounted in the beam line Cooled to +1 ˚C (LV on) Florescent screen to view the beam Insert/retract from beam line Remote control and read-out

Electrical model – static case Al SiO 2 n p+ n+ C DET R DET C AC R bias C RC Q RC C RC R RC HV bias (-300V) HV return (GND) Q RC RC filter GND bonds (16x5) pre-amp C FB V fp CGCG protection diodes bond wires FE inputs (2048 channels) V DD bonds (16x4) LV (GND) LV (V DD ) C LV C DET = 1 nF/2048 ch. R DET = MΩ/2048 ch. C AC = 250 nF/2048 ch. R bias = 1 kΩ x 2048 ch. C RC = 10 nF R RC = 5 kΩ C FB = 400 fF (per ch.) C G = 10 pF (per ch.) C LV = 32 x 100nF 10 MΩ GND probe HV probe Osc. GND 22 nF 1 kΩ 10 MΩ 10 pF

14 September, 2009 L. Eklund, Vertex The measurement sequence - observables Intensity steps: 2x10 9, 2x10 10, 2x10 11, 2x10 12 & 9x10 12 Each step: LV/HV off, LV on/HV off, LV on/HV 150 V & LV on/HV 300V Each beam ‘shot’ follows the same pattern –A set of standard measurements I/V of both sensors Noise & pedestal data Test pulse data at +1.5, 0 and -150 V (for some shots) –Insert the module, acquire during the shot 14 consecutive triggers of front-end data Voltage on hybrid GND and sensor bias via oscilloscope Beam spot image via a a camera –Repeat the same set of measurements Shots on two sensor positions Shots on five front-end chips (only LV on/off matters) No measurable damage up to 300V bias on the sensor 2x1011 (LV on) on the FE chips

14 September, 2009 L. Eklund, Vertex Beam images Beam line camera on scintillating screen Combined R-Φ sensor front-end data

14 September, 2009 L. Eklund, Vertex I/V curves I/V curves in-situ between each shot –Superimpose temperature corrected I/V curves –Small increase probably due to accumulated dose –Rough estimate between first and last curve: 3x10 12 n eq & 200 Gy Work in progress –Correlate with radiation monitoring data

14 September, 2009 L. Eklund, Vertex Thermal image: No hot-spots The majority of the shots hit this area

14 September, 2009 L. Eklund, Vertex Noise & Pedestals Noise & pedestals measured in-situ between each shot –Plots show date taken towards the end of the program –No change visible Detailed analysis is in progress

14 September, 2009 L. Eklund, Vertex Test pulse response – post-zap Test pulse response – ‘booster’: in-situ after a few shots at 2x10 9 – ‘lab’: lab measurement after the full program Gain difference due to different analogue drivers/receivers Bad channels identical to production QA

14 September, 2009 L. Eklund, Vertex Post-mortem – why did it survive? Deposited energy (in 300 µm Si) –9x10 12 x 24 k MIPs x 3.6 eV = 1.2 Joule / 200 ns –Temperature increase in 1 cm 2 Si: 2.5 ˚C –Maximum SPS injection train (288x10 11 ): 4 Joule / 10 µs Local energy store: the RC filter –10 300V => 0.5 mJ –Absorption volume critical Massive ionisation in biased silicon –Q RC (300V) = 3 µC –Deposited 2x10 9 : 7.5 µC Possible transient damage –Current through front-end –AC coupling diode –Voltage on front-end input –Fast HV ramp-down vivum HV bias reduced to 0 V

14 September, 2009 L. Eklund, Vertex Voltage across the sensor vs. time Oscilloscope measurements –Hybrid GND –Backplane –1 sample / ns Ground reference arbitrary –Huge ground bounce –Large pick-up –Plot V backplane -V hybridGND Two distinct features –Sharp rising edge (50 ns) –Slow charge-up time [µs]

14 September, 2009 L. Eklund, Vertex time [µs] The first 50 ns … 6 GV/s 2 GV/s 2.5 GV/s

14 September, 2009 L. Eklund, Vertex Electrical model – the first 50 ns … Al SiO 2 n p+ n+ C DET IZIZ C AC R bias C RC = 10 nF Q RC = 3 µC R RC RC filter GND bonds (16x5) pre-amp CGCG protection diodes bond wires FE inputs (2048 channels) V DD bonds (16x4) C LV I Z /2048 V AC I GND = I Z /80 V IN IZIZ R IN Current during the discharge Divided between 2048 inputs and 80 GND bonds Q RC transferred to C AC V IN = I Z /N x R IN N is large (~ 2048) R IN is small (~Ωs) Ramping 300 to 0 V in 50 ns seems to be OK! R bias reduced to ~100kΩ/2048 via punch-through mechanism Still to large to play a role

14 September, 2009 L. Eklund, Vertex Shots on the FE chips 56 shots on the FE chips: 2x10 9 – 2x10 11 No destructive latch-up –Design rules include structures to prevent latch-up –Seems to be effective! SEU analysis in progress: none observed so far –Requires large energy deposited in small volume –Nuclear reactions necessary –Cross-section very low –Triple-redundant registers: corrected every 2 ns

14 September, 2009 L. Eklund, Vertex Summary The PS booster provided beam to emulate LHC beam incidents –200 ns shots, 2x10 9 to 9*10 12 protons A VELO strip module was subject to a large number of shots –Two positions on the sensor, five FE chips Survived 9x10 12 protons on sensor with 300 V bias Survived 2x10 11 protons on the FE chip No visible change in performance –I/V curves, noise, pedestals, thermal imaging, … Saving graces –The whole sensor responds as a unit –Large area sensor – many channels –C AC >> C RC (+C DET ) –Protection diodes on the FE inputs –Triple-redundant registers in FE chips Analysis & measurement still in progress

14 September, 2009 L. Eklund, Vertex Back-up slides

14 September, 2009 L. Eklund, Vertex Total number of shots Intensity LV off HV off LV on HV off LV on HV 150V LV on HV 300V 2* * * * * Shots on the sensor (position 1+2) Intensity Beetle 4Beetle 5Beetle 6Beetle 7 LV onLV offLV onLV offLV onLV offLV onLV off 2* * * Shots on the front-end chips B2 B6 B0 B3 B4 B7 B5 B1 63 shots on the sensor 56 shots on the FE chips

14 September, 2009 L. Eklund, Vertex Beam size – seen by the Φ-sensor “FWHM” of beam ~80 strips of 70  m pitch ~5.5 mm Response to beam during initial 25 ns of beam rising edge in  detector

14 September, 2009 L. Eklund, Vertex Fitting rising edge of all shots Termination of HV monitoring signal was improved during the program Rising edge not affected by termination 150 V: Shots 3-5 & 2e9, shot 2e10 and shot 2e11 are less than 1 GV/s 300V & 9e12: Shots 34, 42, 44 are greater than 5 GV/s Weak correlation with intensity & voltage Large shot-to-shot variation

14 September, 2009 L. Eklund, Vertex Re-charge of HV … Average time constants –τ = 6.8 2e9 & 150V –τ = 13 9e12 & 150V –τ = 10 9e12 & 300V Need spice simulation to understand recovery times Re-charge depend on intensity –Some long term (10μs) process in the sensor?

14 September, 2009 L. Eklund, Vertex Decay-time of all available wave forms Falling edge clearly affected by the termination Not possible to compare the two data-sets De-convolution of impulse response maybe possible