Development of a Chromaticity measurement application using Head-Tail phase shift technique.

Slides:



Advertisements
Similar presentations
1 Coherent Synchro-Betatron Resonance in the FNAL Booster A. Burov, V. Lebedev HB 2008.
Advertisements

M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
Recent observations of collective effects at KEKB H. Fukuma, J. W. Flanagan, S. Hiramatsu, T. Ieiri, H. Ikeda, T. Kawamoto, T. Mitsuhashi, M. Tobiyama,
“AC” Dispersion Measurement David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
Nov. 17, 2005Fermi Lab AP Seminar AC Dipole Based Diagnostics Mei Bai, C-A Department.
AC dipole for LHC Mei Bai Collider Accelerator Department Brookhaven National Laboratory.
Key Specifications for Tevatron BPM Hardware Architecture Choices Jim Steimel.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
PS (electron cloud?!) instability at flat top Mauro Pivi Gianni Iadarola, Giovanni Rumolo, Simone Gilardoni, Hannes Bartosik, Sandra Aumon 27/06/2012 ICE.
Feedback for CESR TA Michael Billing May 17, 2007.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Tevatron BPM System Upgrade Technical Update Bob Webber Run II Luminosity Upgrade Review February 2004.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
6. betatron coupling sources: skew quadrupoles, solenoid fields concerns: reduction in dynamic (& effective physical) aperture; increase of intrinsic &
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Details of space charge calculations for J-PARC rings.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
F 19 August 2002 All Experimenters Meeting Beams Week in Review Continued to work on providing Luminosity L  N p N a /  –Stacking rate –Coalescing efficiency.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Beam observation and Introduction to Collective Beam Instabilities Observation of collective beam instability Collective modes Wake fields and coupling.
Recent Upgrades to BBSIM Code V. H. Ranjbar † † Tech-X Corporation We have made several improvements to BBSIM, a parallel beam dynamics simulation code.
Simulation of Beam Instabilities in SPring-8 T. Nakamura JASRI / SPring-8
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Part III Commissioning. Proof of Principle FFAG (POP) study The world first proton FFAG –Commissioned in March –From 50 keV to 500 keV in 1ms. –Proof.
Summary of Booster Dampers Systems Dave McGinnis December 7, 2010.
Effect of nonlinearity on Head-Tail instability 3/18/04.
Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Containing a.
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
S. Molloy, P. Emma, J. Frisch, R. Iverson, M. Ross, D. McCormick, M. Woods, SLAC, CA, USA S. Walston, Lawrence Livermore National Laboratory, CA, USA V.
F All Experimenters' Mtg - 03 Mar 03 Week in Review: 02/24/03 –03/02/03 Ron Moore – FNAL Store Summary / What went wrong Tev Studies Highlights Tev Ground.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Simultaneous Position Measurements of Protons and Anti-Protons in the Tevatron R. K. Kutschke †, J. Steimel, R.Webber, S. Wolbers, Fermilab*, Batavia,
Random ideas for discussion. Logging/storage We need to decide on the list of required variables to log and analyze for each fill For each variable, we.
RECYCLER REQUIREMENTS FOR THE RECYCLER RING & ASSOCIATED TRANSFER LINES BPMs Brajesh Choudhary for the MI Dept.
9/2/2003Tev BPM requirements1 Tevatron BPM and BLM requirements Mike Martens.
Sub-Bunch Beam Position Measurements James Miller-Marquez Mentor: Vic Scarpine
BIW 2006 Simultaneous Tune and Coupling Feedback during RHIC Run 6 Peter Cameron.
LARP Berkeley Apr 2006 Tune/Coupling/Chromaticity Measurement and Feedforward/Feedback Peter Cameron.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
APEX 2 Nov 06 the 60Hz Harmonics Problem Peter Cameron.
Three examples of application of Sussix 1)Data from simulations  sensitivity 2)Data from measurements  frequency resolution.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
A Survey of TBT Capabilities of the Upgraded TeV BPMs Rob Kutschke, CD/EXP Tevatron Department Meeting February 18, 2005 Beams-doc-1583-v2.
A Survey of the Capabilities of the Upgraded TeV BPMs Rob Kutschke, CD/EXP Run II Meeting March 24, 2005 Beams-doc-1752-v2.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
SDA- Shot Data Analysis Jean Slaughter DOE Review July 21, 2003.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Weiming Guo Accelerator Physics Group / ASD Advanced Photon Source
Update on single-collimator impedance measurements using ADT data
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Jeffrey Eldred, Sasha Valishev
Multiturn extraction for PS2
Head-Tail monitor Benoit, with the help of Christian Boccard and Ralph Steinhagen (BE/BI-QP)
SPS Transverse Damper System
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
ICFA Mini-Workshop, IHEP, 2017
Presentation transcript:

Development of a Chromaticity measurement application using Head-Tail phase shift technique.

Overview Discussion of measurement needs in the Tevatron Introduction to Theory of Head-Tail Phase Shift Results from initial tests in the Tevatron Coupling and Bunch Amplitude profiles Limitations of current set-up Conclusion

Measurement needs in the Tevatron Moving from uncoalesced to coalesced protons during machine tune-up Measurement during Acceleration ramp. - Chromaticity, Tune, and Coupling. Current RF chromaticity system draw-backs - Requires uncoalesced protons - Requires three acceleration ramps.

HT  P/P  ss Longitudinal ‘phase-space’ Graph Longitudinal Beam Dynamics

Chromaticity Measurement Using Head-Tail Phase Shift In the presence of non-zero chromaticity the betatron equation of motion becomes: Thus from phase difference between two locations in a bunch the chromaticity can be calculated:

Using the vertical and horizontal strip-line detectors installed in the Tevatron at the F0 location we extract a profile of the transverse behavior of the beam over a single longitudinal bunch. Extracting Transverse position

Difference Signal (A-plate – B-plate) Reflected Signal Reconstructed Signal Sum Signal (A-plate + B-plate) The Raw Signal is Processed to remove the Reflected Signal

From the Sum and Difference (A-plate  B-plate) Signals the Transverse position can be calculated using: Here G is the ratio of the A-B gain over the A+B gain.Once the Transverse Position as a function of longitudinal bunch position is known (  ) we can use this to analyze the phase shift between the Head and the Tail to Calculate Chromaticity.

Vertical and Horizontal turn by turn position after horizontal 1.6 mm kick

Vertical and Horizontal turn by turn position after vertical 1.75 mm kick

Other measurements Coupling Bunch Amplitude

Color Contour Plot of Bunch Amplitude after 1.6 mm Horizontal kick after first 2.5 sec of ramp.

Cv=-0.93 Ch=5.1 Instability Studies Performed Last Spring: (Jim Crisp, Peter Ivanov)

Cv= -2.1 Ch = 6.2

Cv = -5.1 Ch = 6.2

Cv =-6.43 Ch =6.3

Results from most recent tests during ramp:

Timing of E17 vertical kicker

Screen Shots of Software

Limitations of current set-up The major drawback of this system of measurement is its destructiveness. For measurement during tune up current system is ok. For a store we need more work. In addition both the kickers and scope have limitations which restrict operations.

F17 and E17 kickers The Horizontal kicker requires a ramp up time of 2.5 secs. (~30 possible horiz. Meas.) The E17 kicker produces a half sinusoid current pulse with a base width of 10 micro secs. The F17 kicker produces a square current pulse with a width of 1.8 micro secs. Thus the E17 kicker is too slow hit only one bunch during 36x36 store. But the F17 kicker could accomplish this if fired at the right time in the abort gap.

Scope With all four channels Scope can store only turns which means the max number of measurements possible is 23 (every- other-turn). The scope resolution is limited by the bit size and closed-orbit offset which set our minimum resolution to.1 mm.

Moving towards less destructive measurements By removing the closed-orbit current offset we should be able to reduce this resolution down to the signal noise floor from the beam and cables. Thus we could increase effective scope resolution and possibly reduce the required kick amplitude. Excite beam adiabatically (ac dipole technique) Run the damper kickers resonantly. This method of chirp excitation has been tested successfully at HERA. Can be gated to hit only one bunch.

Conclusion This system is nearing completion –Last major issue: E17 kicker timing –Rigrous comparison with RF technique on ramp. Now time for beam physics studies: –Study chromaticity and coupling changes during ramp. –Study of Bunch amplitude using color contour plots Possible future improvements –Minimally destructive measurements –Measure beam-beam effects on chromaticity and coupling. –Measure Pbars?