A Suggested Methodological Framework for Evaluating and Selecting an Open Source LMS Dr Philip Uys Manager, Educational Design and Educational Technology,

Slides:



Advertisements
Similar presentations
Second Stakeholders Forum on EU cooperation in Education and Training 2009 EUROPEAN YEAR OF CREATIVITY AND INNOVATION Report of the workshops February.
Advertisements

MAPP Technical Assistance Webcast Series Addressing Unique Challenges faced by Rural Communities Using the MAPP Process March 28, 2007.
Sustainability & Business Models Gill Joy – ESYS plc Oscar Struijve – Education for Change.
PQF Induction: Small group delivery or 1-1 session.
Intelligence Step 5 - Capacity Analysis Capacity Analysis Without capacity, the most innovative and brilliant interventions will not be implemented, wont.
The WINSS School Improvement Planning Tool: An Overview.
Working with the Teachers’ Standards in the context of ITE. Some key issues for ITE Partnerships to explore.
Systems Analysis and Design in a Changing World
Intuitive Design Inc. New Product Development Progress March 25, 2006 Prepared for: Company Management Team Dave Leis.
The Institute for Learning and Research Technology is a centre of excellence in the development and use of Information and Communication Technology to.
ICT6221 Chapter 14 Assessing the Value of IT Managing the Information Technology Resource Paula Goulding.
Viewpoint Consulting – Committed to your success.
Innovation Leadership Training Day Four Idea Evaluation February 20, 2009 All materials © NetCentrics 2008 unless otherwise noted.
Fundamentals of Information Systems, Second Edition
Self-Assessment for Continuous Improvement: Tools and Techniques 16 September 2009.
© 2004 Managing the Information Technology Resource, Jerry N. LuftmanChapter 14 - Slide 1 Chapter 14 Assessing the Value of IT Managing the Information.
Codex Guidelines for the Application of HACCP
Assessment Workshop SUNY Oneonta May 23, Patty Francis Associate Provost for Institutional Assessment & Effectiveness.
Best-Fit Evaluation Strategies: Are They Possible? John Carlo Bertot, John T. Snead, & Charles R. McClure Information Use Management and Policy Institute.
Sara Kim, PhD, Director, Associate Professor Instructional Design and Technology Unit, UCLA David Geffen School of Medicine Katherine Wigan, BS, MBA, Senior.
Diana Laurillard Head, e-Learning Strategy Unit Overview of e-learning: aims and priorities.
Use of OCAN in Crisis Intervention Webinar October, 2014.
COMPGZ07 Project Management Presentations Graham Collins, UCL
REF Information Session August Research Excellence Framework (REF)
CSU Interact A Sakai Implementation Phil Roy Director Operations, Division of Information Technology Adjunct Lecturer, School of Computing and Mathematics.
Discussion Document By G How. History LeadershipStructureProcessesInformationEnvironment The path of Shared Services is littered with failed attempts.
Presenter-Dr. L.Karthiyayini Moderator- Dr. Abhishek Raut
Lori Smith Vice President Business Intelligence Universal Technical Institute Chosen by Industry. Ready to Work.™
Slide 1 D2.TCS.CL5.04. Subject Elements This unit comprises five Elements: 1.Define the need for tourism product research 2.Develop the research to be.
1 Hsin Chu, August 2012 Regulatory Impact Assessment Charles-Henri Montin, Senior Regulatory Expert, Ministry of economy and finance, Paris
Instructore: Tasneem Darwish1 University of Palestine Faculty of Applied Engineering and Urban Planning Software Engineering Department Requirement engineering.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
02/10/2015 Page 1 R. Theeuws Siemens Atea Filename: CBD_ervaring Werkgroep Component Based Developments Ervaring CBD.
INTERNATIONAL LABOUR ORGANIZATION Conditions of Work and Employment Programme (TRAVAIL) 2012 Module 13: Assessing Maternity Protection in practice Maternity.
Professor Norah Jones Dr. Esyin Chew Social Software for Learning – The Institutional Policy of the University of Glamorgan ICHL 2012, China
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 10 Risk Management Proactively managing the positive.
Considerations for CIHR’s New Open Program. The Context Bottom up Strategy Reform of Open Suite of Programs Full spectrum of CIHR mandate Top Down Strategy.
AIPM State of the Nation A Review of the Status of Project Management in Australia – A Personal Perspective Colin Dobie Immediate Past President AIPM.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Part III: Strategy in Action
Kathy Corbiere Service Delivery and Performance Commission
Rob Verheem The Netherlands EIA Commission
The WINSS School Improvement Planning Tool: An Overview.
Accreditation! The responsive curriculum game is made available through JISC under the terms of the Creative Commons BY-NC-SA Attribution-NonCommercial-ShareAlike.
Run smoothly. Change quickly. Achieve more. Cloud-based enterprise work management software How to Prioritize Projects When Each One is Critical Nadia.
Outlines Overview Defining the Vision Through Business Requirements
The Power of Recommendations Dainius Jakimavičius National Audit Office of Lithuania Vilnius, April 23, 2013.
Evaluating Engagement Judging the outcome above the noise of squeaky wheels Heather Shaw, Department of Sustainability & Environment Jessica Dart, Clear.
National PE Cycle of Analysis. Fitness Assessment + Gathering Data Why do we need to asses our fitness levels?? * Strengths + Weeknesses -> Develop Performance.
IPCC Key challenges facing communities, and approaches to solutions that enhance resilience: through NAPs Climate and Health Summit 2014 Investing.
RISK MANAGEMENT IN THE PUBLIC SECTOR CONVERGING MULTIPLE STAKEHOLDER’S EXPECTATIONS Organised by National Treasury Presented by WELEKAZI DUKUZA CEREBRO.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
How Good are you at Managing your Processes? Operational Excellence.
Addressing quality assurance and professional development for online teachers Kirsteen Donaghy.
Canadian SNOMED CT Strategy October 2012 Draft. Content 1 Background Approach Current State Future State Considerations Action Plan.
Practical IT Research that Drives Measurable Results Establish an Effective IT Steering Committee.
Principles of Information Security, Fourth Edition Chapter 1 Introduction to Information Security Part II.
An Approach To Developing a PMO A Case Study
Fundamentals of Information Systems, Sixth Edition
Ernest Cachia Department of Computer Information Systems
Identify the Risk of Not Doing BA
a collaborative effort
The Strategic Information Technology Formulation
Systems Analysis and Design
Governance Lisa Lugo Senior Vice President Strategic Operations
Tracking points assessment system for years 1-6
Portfolio, Programme and Project
Value Proposition Celemi Sales Endeavour™ enables sales professionals, and their organizations, to learn and apply a repeatable process for developing.
SD5953 Successful Project Management AGILE SOFTWARE DEVELOPMENT
Presentation transcript:

A Suggested Methodological Framework for Evaluating and Selecting an Open Source LMS Dr Philip Uys Manager, Educational Design and Educational Technology, Centre for Enhancing Learning and Teaching Matt Morton-Allen Teaching, Learning and Community Source Liaison Officer

Introduction Set out in Feb 2006 to enhance the virtual learning environment Became the Online Learning Environment (OLE) Programme Originally focused on individual tools but morphed to framework emphasis Started with 12 possible solutions Mix of open source, commercial and in-house options Ended with two open source Selected Sakai

Fast Track Approach Initially used “fast track” approach Attempted to avoid lengthy investigation of requirements Focus on reusing previously supplied high level business requirements Success hinged on ability to easily identify low risk solution

Fast Track Approach (cont.) Reality was that too little information meant too many options Too many options meant too high a risk High risk combined badly with lack of process transparency Also did little to bring together cross-silo issues between requirements

A Different Approach Once “fast track” abandoned needed alternative Extensive experience in the group not sufficient to address OSS complexities Short environment scan showed two possible frameworks: Business Readiness Rating Open Source Maturity Model

Business Readiness Rating Geared at helping evaluate OSS Identifies 12 criteria each with their own tests Suggests only portion of these be applied Assigns a weight to each test within a criteria giving end score Has online records of submissions made by others

Business Readiness Rating (cont.) When looked at closely BRR has some flaws The measures of the tests within criteria are high level and generic Leads to need to revise for local use Or be faced with possibility of having undiminished pool of options Either means you need to move beyond BRR for a final decision In retrospect could have been useful early on as a filter

Open Source Maturity Model Another model that could be considered – but limited The OSMM assesses the maturity level of all key product elements: Software Support Documentation Training Product integration Professional Services

A Different Approach When neither BRR or OSMM seemed to fit began to consider afresh Agreed on the need for: Flexible – willingness to adapt throughout Aligned – consistent with strategy Comprehensive – extensive and in-depth investigation Transparent – rigorous debate Devised the FACT framework for our own needs

The FACT Framework 1.Identify requirements 2.Weigh the requirements 3.Identify possible solutions 4.Identify “killer” requirements 5.Apply “killer” requirements 6.Determine short list 7.Identify overarching concerns 8.Apply overarching concerns

1. Identify Requirements Utilised collaborative process to create extensive (> 40) requirements list Sources included strategy documents, feature lists from commercial and OSS products, team member experience Split into high medium and low priority Identified levels of compliance with each requirement or “criteria”

2. Weigh the Requirements Next we gave a weighting to each requirement Again followed a highly collaborative process Required several iterations to get consensus Split 1000 points over 40 requirements Revised several weightings when unable to differentiate possible solutions Always done in collaborative and transparent way

3. Identify Possible Solutions Compiled list of possible solutions Derived from a number of sources including team expertise, industry reports, peer institutions etc Resulted in list of 12 options It was hoped this might be trimmed

4. Identify Killer Criteria Realised evaluating over 12 products against 40 requirements would take a long time Decided some requirements were “show stoppers” and thus “killed” the option Collaboratively decided which of the requirements had a criteria level that was unacceptable

5. Apply “Killer” Criteria Applied killer criteria to each of possible solutions Once a killer had been reached further analysis was stopped Not all “killers” consider equal - some options needed more than one to be removed Reduced the list of 13 options down to 5: Blackboard, Angel, In-house, Moodle & Sakai

5. Apply “Killer” Criteria (cont.) Removed options for a number of reasons: Mergers Insufficient local support Small user base Interestingly cost did not rule out any options at this point

6. Determine Short List From the list of 5 we then removed: Blackboard – concerns over lack of competition, little leverage to control costs In-house – advantage of reinventing wheel questionable, OSS seemed to have same benefits without starting from scratch, lack of agility Angel – user base too small, too high risk, detriments of commercial without benefits of size Leaving us with Moodle and Sakai

7. Develop OACs After many months of effort the quantitative analysis gave near identical scores: Sakai – 2428, Moodle – 2402 If quantitative comparisons had come up empty what about qualitative ones? Developed “overarching concerns” or OACs: Completely qualitative Focus on general ideology not current features Designed to ensure alignment between culture of solution and the University

7. Develop OACs (cont.) Ended up with 10 OACs covering range of issues: Was the community decision making centralised or decentralised? Was the product enterprise oriented? Was the product stronger in secondary or tertiary sectors? Was the community more technically or more pedagogically focused?

8. Apply the OACs Once compiled the OACs were applied to the short list of Moodle and Sakai Four major stakeholder groups asked to decide on Sakai or Moodle for each OAC End result looked like …

8. Apply the OACs (cont.)

3 of the 4 team members agreed but consensus could not be reached after intense debate A final Steering Committee vote selected Sakai unanimously

Observations The deeper the analysis the more possible solutions you can remove Shallow analysis using models such as BRR can be useful in early stages Quantitative comparisons are less meaningful when you can change any aspect of the software – there’s lots of grey areas

Observations (cont.) The introduction of qualitative measures is unavoidable and should be accepted throughout Qualitative comparison can only be accepted in an environment of transparent rigour Qualitative measure can only follow quantitative comparison – it lacks conviction in isolation

Observations (cont.) Removing cost from the equation helped compare OSS and commercial Assuming cost is near equal over a period of time removes bias and misconception (i.e. no “free lunch”) Evaluations require consideration of local needs and politics – highly strategic decisions cannot be based on off shelf comparisons

Observations (cont.) Requiring consensus was time consuming but gave strength to the results: Forced rigorous debate Ensured transparency throughout You cannot rush decisions this large – taking the time allowed a considered decision

Observations (cont.) The framework wouldn’t have worked outside the context of the project management methodology A framework needs to be contextualised within the organisational culture and strategies

Thank You! Dr Philip Uys Manager, Educational Design and Educational Technology, Centre for Enhancing Learning and Teaching Matt Morton-Allen Teaching, Learning and Community Source Liaison Officer For more information