Cryogenic discussion and update 30 October 2014Neutrino platform.

Slides:



Advertisements
Similar presentations
Argon Purification: Lessons from Icarus and Design of a Purification System for a Very Large Detector Adam Para, Fermilab FLARE Workshop, November 3.
Advertisements

LAPD Run 2 Results and Notes Terry Tope
LBNF Test Cryostat Requirements David Montanari / Jack Fowler Jan 29, 2015 Rev. 11.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
LAr1-ND Conceptual Design Review of Status June 25 Craig Thorn.
LAr1-ND David Montanari Fermi National Accelerator Laboratory CERN – Feb 16, 2014.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
New Readout Methods for LAr detectors P. Otyugova ETH Zurich, Telichenphysik CHIPP Workshop on Neutrino physics.
PUNTO ENERGIA Experience in Implementing and installing co-generation and energy- saving schemes Eng. Michele Vio President of AICARR Eng.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
Some Work on Liquid Argon Purity at Fermilab f 6/9/2011 S. Pordes TIPP 1.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
LAr1-ND Cryogenics Concept David Montanari Neutrino Cryogenics Requirements Meeting 24 September 2014.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
The cryogenic systems of the ATLAS and CMS detectors Johan Bremer on behalf of TE/CRG 06/06/2013AFF.
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
Neutrino Cryogenics Requirements Meeting Overall Summary of Our Discussions Barry Norris (Fermilab) / Johan Bremer (CERN) Neutrino Short Baseline Meeting.
Some Work on Liquid Argon Purity at Fermilab f 6/9/2011 S. Pordes TIPP 1.
LAr1-ND Cryostat proposal David Montanari Neutrino Cryogenics Requirements Meeting 24 September 2014.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Seattle / David Finley, Fermilab / September 21, 2006 Slide 1 Liquid Argon TPC Activities at Fermilab etc Big Tank Paradigms Technical Progress.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans S. Pordes Argon Purity1Integrated R & D Plan Review.
Hans Jostlein, May 24, Large Liquid Argon Purity Demonstration— Phase I: Gas Flushing -What -Why ? -How ? -When ? -Define “Success”
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
Poster Design & Printing by Genigraphics ® Neutrino Interactions Studying the properties of neutrinos will shed light on the origin of the.
Discussion: développement du système de lecture des photomultiplicateurs pour le prototype de détecteur Argon liquide de LBNO 21/11/2013 Réunion: APC,
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon R & D work at Fermilab neutrinos WIMPS.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
GLA2011 The cryogenic systems of the LHC experiments Johan Bremer on behalf of TE/CRG, ATLAS collaboration and CMS collaboration.
Concept Design for LBNF Far detector (LAr single phase)
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Installation of the T600 at Fermilab CSN2, September 22,
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon presents prospect of continuously live Imaging Calorimeter C. Rubbia.
Cryogenics Fabrication Plans & Constraints David Montanari (on behalf of the CERN Neutrino Cryogenic Group) ProtoDUNEs Meeting Feb 23, 2016.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
David Finley / PPD Engineering Meeting / June 24, Fermilab Slide 1 R&D Toward Large Liquid Argon Time Projection Chambers “Large” means up to 100.
35ton and LAPD cryostats and future DUNE detector development.
Second run with the Copper filter WA104 technical meeting – 23/03/2016.
The ModuLAr Project LoI discussion INFN-LNL 21/11/2007 Legnaro (PD)
35 Ton LAr Impurity Distribution Measurements and CFD simulation Erik Voirin – Fermilab – Thermal and Fluids Engineering Group / Engineering.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
H.-G. Moser, PXD Workshop, Valencia, January 2016 IBBelle for VXD 1 Use one unit first Assemble on a platform which fits in a 20’ container No redundancy.
Cryogenic Test Stand Facilities at PAB: Stephen Pordes Neutrino R&D Workshop January 20 –
The DUNE 35ton Prototype at Fermilab. DUNE FD ND 1300 km We have learned much about neutrinos in the last 70 years, but there is still much we don’t understand.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
1 Cary Kendziora Fermi National Laboratory Cary Kendziora Fermi National Laboratory CEC-ICMC 2013 Anchorage Alaska – June, 2012.
Neutrino Platform Proximity Cryogenics Functional Design M.Chalifour 14/04/2016 M. Chalifour - TE/CRG-CI 2.
ProtoDUNEs Interface documents (NP-02, NP-04) David Montanari (on behalf of Redouan A, Mark A, Johan B, Michel C, Joaquim C, Aurelien D, Kevin H) Apr 14,
WA105 6x6x6 Cryogenics David Montanari / Johan Bremer Sep 21, 2015 Rev. 1.
ProtoDUNE Single Phase (NP-04) P&ID David Montanari (on behalf of Mark A, Johan B, Michel C, Joaquim C, Kevin H) CERN Neutrino Platform General Meeting.
SBND Cryostat Requirements David Montanari, Michael Geynisman, Dimitar Mladenov, Joe Howell 14 October 2015.
Final Design Cryogenic and mechanical configurations
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Installation of the T600 at Fermilab
Overview of the Long-Baseline Neutrino Facility Cryogenic System
Albert Einstein Center for Fundamental Physics
Proximity Cryogenics P&IDs Meeting
protoDUNE – single-phase Instrumentation - Gas Analyzers
HFM Test Station Main Cryostat
Proximity Cryogenics P&IDs meeting
Instrumentation Used in LAPD and 35T Runs (Dune DocDB 1759)
Leak Detection Tutorial Work
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Warm structure requirements :
CRYOGENICS OPERATIONS 2008 Organized by CERN
Presentation transcript:

Cryogenic discussion and update 30 October 2014Neutrino platform

30 October 2014Neutrino platform Neutrino Cryogenics Requirements Meeting September 23 rd and 24 th CERN Experiments present: ICARUS 35 ton cryostat MicroBooNe LAR1-ND LBNF Two days of discussion on cryostats and cryogenics

ICARUS 30 October 2014Neutrino platform CERN

ICARUS 30 October 2014Neutrino platform Very good results with Oxysorb (Chromium) and Hydrosorb filter All the components and mechanical assemblies were tested in LAr to verify their compatibility with our purity requirements During 3 years of underground operation lifetimes up to 15 ms have been measured Temperature uniformity over 3 years of operation < 0.25 K

35 ton cryostat 30 October 2014Neutrino platform Can the membrane technique be used for large volume liquid argon cryostats: Build and operated 35 ton test cryostat Test piston purge principle (cannot evacuate the cryostat) Measure the heat load (12.5 W/m 2 ) Good pressure regulation possible (+/ mbar over 24 hours)

MicroBooNe 30 October 2014Neutrino platform Installation of MicroBooNe Phase 2 is on the way Total volume 128 m 3 of liquid argon During Phase I Multiple bottom-to-top volume changes using high purity gas From air to < 0.5 ppm O2 and H2O, < 2 ppm N2

LAr 1 ND 30 October 2014Neutrino platform LAr 1 ND base design: membrane cryostat for 180 ton of liquid argon; Operational gas pressure: about 70 mbar Design pressure 350 mbar Maximum static heat-load: 15 W/m 2 LAr circulation pump stationed outside of argon bath (electrical noise reduction) Concrete / metal support structure Shall ullage be kept at T < 100K?

LBNF 30 October 2014Neutrino platform

Cryogenics 30 October 2014Neutrino platform First study of LAr1-ND cryogenic system

Open questions 30 October 2014Neutrino platform At the end of the meeting the following open points were identified: What is the maximum allowable temperature difference over the argon bath (vertically), what will be the natural stratification in such a large argon volume; What are the advantages / disadvantages of the different purification systems (active copper versus commercial available Hydrosorb / Oxysorb combination); What shall be foreseen for the cryostat ullage: Internal warm (easy feed-troughs, but outgassing); Internal cold (diminished outgassing, how to regulate the purification process, which kind of feed-troughs to be used); External warm (no outgassing in sensitive volume but cold feed through, second argon volume to be placed in experimental area; Liquid connection at bottom of cryostat (circulation pump, emptying), how to implement this safely in the cryostat Which control system to be foreseen for these systems. Easiest to equip them all with the same system, however dependable on the place the system will be installed; Long life-time purity monitors, which equipment shall be used and shall they be installed internal of the cryostats?

How to continue from the CERN side 30 October 2014Neutrino platform Setting up of CERN cryostat and cryogenics workgroup 2 staff 3 project associates (from Fermi, ICARUS and LAGUNA) This workgroup shall collaborate with the same kind of workgroup at this moment been set-up at Fermi Workgroup will concentrate on: 1.cryogenics needed for CERN based LAr neutrino test stands 2.technical help for the upgrade of the ICARUS experiment at CERN 3.cryogenics needed for the WA105 small and large prototype 4.cryogenics needed for the LAr-1 ND and ICARUS at Fermi 5.collaborate on the development of the cryostats and cryogenic installations of the LNBF

06 March 2014 CI: Group meeting