Subsea Standardization. Brief History SPE ATW on Subsea Standardization held Dec 2008 SPE ATW on Subsea Standardization held Dec 2008 –Form workgroup.

Slides:



Advertisements
Similar presentations
AS9102 First Article Inspection Report
Advertisements

Transition from Q1- 8th to Q1- 9th edition
Apprenticeship and Workplace Mathematics Meeting the Needs of Today’s Students.
First Article Inspection Report
Contractor Management and ISO 14001:2004
The ISO 9002 Quality Assurance Management System
PURPOSE OF DFMEA (DESIGN FAILURE MODE EFFECTS ANALYSIS)
FAA Regulatory Policy for Composite Material Control Presented at 8/8/02 FAA/NASA Workshop (Chicago, IL) Introduction – Importance of stabilizing composite.
TEMPUS ME-TEMPUS-JPHES
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
© 2011 Chevron API 16A 3 rd Edition Summer Conference Committee Meeting 24-June-2013 API 16A Chairman: John Busby Co-Chair: Jim McCabe.
1 Subsea Reliability and Integrity Management Reliability and Integrity Management – Have very similar intent - almost the same definition – Treated separately.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2014.
1 API SC6 Winter Meeting Update on CSOEM MARG Activities Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 4 February 2015.
Tim Haeberle API SC Winter Meeting
November 7, Status * Task group initiated in November * Steering Committee requested a summary report in July * Summary report deemed.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Creating Lasting Change for Your Business ISO 9001:2000 Management System Overview.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
1 ANSI Conference on U.S. Leadership in ISO and IEC Presented by Mr. Steven P. Cornish Director, International Policy American National Standards Institute.
© 2002 Systex Services1 ISO 9000:2000 OUTLINE Quality Management System.
Quick Guide to help your transition
Visit us at E mail: Tele:
API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment.
API Monogram Program Monogram Program Staff – SC Liaison Report
1 David Miller, PE, F.ASCE Director, Standards API ECS Reorganization Update.
Rev 6.1.  Lack of collaboration is a major risk  Late engagement is a risk  How much is new?  How much time?  How many resources?  Design Collaboration.
Software Project Management
1 SAE AIR5359A Requirements for Registration of Quality Systems to AS9100 Nik Sutton Boeing IDS This briefing contains non technical data reviewed by Export.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2015.
PER15K Protocols for Equipment Rated Greater Than 15,000 PSI ECS Report
API 18LCM (Life Cycle Management) Report back to SC17 August 27, 2015 Review Team: Dave Wilkinson, John Strut, Smarty John, David Saul, Peter Moles.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
The common structure and ISO 9001:2015 additions
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
SC17 Materials Initiatives 2015 Summer Meeting Update.
19th January 2012 Don Wells (Hess)
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
Accelerator Safety Order Revision Process Frank Kornegay, ORNL SNS Dennie Parzyck, DOE FSO.
Lead from the front Texas Nodal 1 Early Delivery System Testing Environments & Planning – Involving Market Participants TPTF May.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
SC21 & Subsea Materials Bruce Witwer - SC17 Materials Liaison.
Requirements of Documents for Quality Management System ISO 9001 Certification.
Update of API Standards for Supply Chain Management API Standard 20J – Qualification of Distributors.
Subcommittee 21 - Materials Act as a resource on materials issues affecting multiple subcommittees under the Committee on Standardization of Oilfield Equipment.
Supply Chain Management Report for SC 18 January 2013.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
Materials Qualification for Bolting Applications
Potential Risks, Limitations, And Failure Mechanisms Arising From Fastener Design, Manufacture, Material, And Coating Selection Prepared for the National.
USMC Garrison Food Services Market Research
Updates from SC18 Summer Meeting
Market Research Report Team Name:
API 17Q Proposed Technical Changes to Rev 0
Impact on SC 6 Documents by Kenneth Young
API RP 17A - Discussion Points
API 14H Task Group Status Proper Classification of Document
International Subsea Standardization
First 8 slides are what was presented in San Fransisco…
Impact on SC 6 Documents by Kenneth Young
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
CSOEM Materials Advisory Resource Group
API SC6 Valves and Wellhead Equipment
Presentation transcript:

Subsea Standardization

Brief History SPE ATW on Subsea Standardization held Dec 2008 SPE ATW on Subsea Standardization held Dec 2008 –Form workgroup for further review –The purpose of the workgroup would be to: Identify potential areas of industry standardization Identify potential areas of industry standardization Obtain cross section of industry input on standardization issues Obtain cross section of industry input on standardization issues Present API SC17 with recommendation for moving forward at Summer Meeting in June Present API SC17 with recommendation for moving forward at Summer Meeting in June 2009.

Prep for API 2009 Summer Conf Materials Materials Welding Welding Quality Management Quality Management Performed rationalization of potential areas of standardization

Assessment Process Three focus teams (Quality, Materials, & Welding) with Operator and Supplier representation Three focus teams (Quality, Materials, & Welding) with Operator and Supplier representation Brainstorm potential standardization opportunities Brainstorm potential standardization opportunities Score in terms of manageability & value Score in terms of manageability & value Score in terms of value Score in terms of value

Summary Industry standards have surpassed standard API 6A requirements Industry standards have surpassed standard API 6A requirements Specific requirements have been identified to pursue possible codification Specific requirements have been identified to pursue possible codification Specific Areas of Opportunity are: Specific Areas of Opportunity are: –Quality Management Standardize manufacturing record book contents and requirements Standardize manufacturing record book contents and requirements Standardize positive metal identification (PMI) requirements Standardize positive metal identification (PMI) requirements Standardize traceability requirements for critical elements Standardize traceability requirements for critical elements Standardize nonconformance reporting and processes necessary to proceed with the work Standardize nonconformance reporting and processes necessary to proceed with the work Align API 17 series specifications and RPs with QMS concepts and terms of API Q1, ISO/TS and ISO 9001 Align API 17 series specifications and RPs with QMS concepts and terms of API Q1, ISO/TS and ISO 9001 Apply API “data sheet” concept to all API 17 series specs and RPs to communicate requirements Apply API “data sheet” concept to all API 17 series specs and RPs to communicate requirements

Summary (Cont’d) Materials Assign varying requirements according to the difficulty in making a given forging, the difficulty in obtaining the required properties in a given forging (taking into account engineering requirements, hardenability of the alloy, and section size of the forging), and the consequences of a forging failure Assign varying requirements according to the difficulty in making a given forging, the difficulty in obtaining the required properties in a given forging (taking into account engineering requirements, hardenability of the alloy, and section size of the forging), and the consequences of a forging failure Imposing API RP 6HT as a mandatory requirement for large forgings Imposing API RP 6HT as a mandatory requirement for large forgings Allowing the current API 6A options for QTC’s (separately forged test bar, prolongation, or sacrificial forging). If separately forged test bars are used, the manufacturer must provide technical justification for end user approval Allowing the current API 6A options for QTC’s (separately forged test bar, prolongation, or sacrificial forging). If separately forged test bars are used, the manufacturer must provide technical justification for end user approval Mandatory normalizing for large low alloy steel forgings Mandatory normalizing for large low alloy steel forgings Preheat treat machining requirements (as necessary) Preheat treat machining requirements (as necessary)

Summary (Cont’d) Welding Group similar materials & grades (US vs Europe) to eliminate requirement for individual weld qualifications Group similar materials & grades (US vs Europe) to eliminate requirement for individual weld qualifications Adopt “Weld Criticality” ratings. Match welding / NDE requirements to criticality Adopt “Weld Criticality” ratings. Match welding / NDE requirements to criticality Join forces with other welding standardization committees already working the problem (i.e. API RP 582 and others) Join forces with other welding standardization committees already working the problem (i.e. API RP 582 and others)

Actions from API 2009 Summer Conference It was recommended that the SPE group continue their efforts to address the suggested optimization in Materials, Quality and Welding and generate a draft specification document.

Standardization Work Plan

Recorded These References Document Document Document Type Document Type Document No. Document No. Name & Rev Name & Rev Quality and Quality Management Quality and Quality Management Material Selection and Qualification Material Selection and Qualification Welding and Welding Requirements Welding and Welding Requirements

API SC 6 – Valves & Wellhead Equipment

SC 14 - OFFSHORE SAFETY AND ANTI-POLUTION

SC 16 - DRILLING WELL CONTROL SYSTEMS

SC 17 - SUBSEA PRODUCTION SYSTEMS

Document Review Results Topic # of references Quality & Quality Management 100 Material Selection & Qualification 204 Welding & Welding Qualification 130

Next Steps Identify gaps Identify gaps –Existing references vs identified areas of opportunity Create outline of resulting specification Create outline of resulting specification Circulate outline for review Circulate outline for review Generate specification Generate specification