Tom Downes MB BS, MRCP, MBA, MPH (Harvard)

Slides:



Advertisements
Similar presentations
Everybody’s Business Integrated mental health services for older adults A service development guide.
Advertisements

Strengthening Community Mental Health Services – Acute Care Pathway Redesign Consultation Briefing for Bolton Health, Care and Wellbeing Forum 10 th February.
Acute medical care of older people - outside hospital
The NHS Tayside Experience Linking Knowledge Management with Quality Improvement Carrie Marr Associate Director of Change and Innovation Tayside Centre.
Welcome to the new acute and community County Durham and Darlington NHS Foundation Trust Clinical strategy FT member events April 2011.
Suffolk Care Homes An Integrated Approach
Croydon Clinical Commissioning Group An introduction.
East Midland Clinical Senate 7 Day Services Programme Chesterfield Royal Hospital NHS Foundation Trust and East Midlands Clinical Senate.
ESD Stroke Pilot. Pilot Based on retrospective audit and budget of £75,000. Clinical Leads OT and Physio from RCH Acute Stroke Unit developing and leading.
Marc Hopkinson Gateshead Care Home Programme. Our Mission & Vision Mission: Working together to improve the health of Gateshead Vision:  Care for people.
Irish National Acute Medicine Programme Patient Flow Model O’Reilly O, Courtney G, Casey A* Problem Patients requiring urgent care experienced long delays.
Monday 17 September (Materials presented to the Mayoral Team on 28 August 2012)
Dr Christopher Dalley Department of Haematology
System and Service Design for Older Adults Asangaedem Akpan MPhil FRCPI FRCP(UK) Consultant in Community Geriatric Medicine & Health Foundation/Institute.
NHS Services, Seven Days a Week Professor Sir Bruce Keogh National Medical Director NHS England.
Right First Time: Update. Overview Making sure Sheffield residents continue to get the best possible health services is the aim of a new partnership between.
The future of health and social care in Salford – the next 5 years Partnership presentation by: Salford City Council Salford Clinical Commissioning Group.
Global Context As the rich world gets older and sicker and the poor world gets wealthier and fatter, the demand for medical innovation is exploding. Clever.
Mr Chris Hill Torfaen Joint intermediate care manager.
7 Day Working A Practical Perspective Dr Janet Williamson, National Director, NHS Improvement.
The Health Roundtable 3-3b_HRT1215-Session_MILLNER_CARRUCAN_WOOD_ADHB_NZ Orthopaedic Service Excellence – Implementing Management Operating Systems Presenter:
Allied Health within the Community Independence Service Hammersmith & Fulham Penny Magud & Gillian McTaggart 12th November2014.
Each Home Instead Senior Care franchise office is independently owned and operated. Each Home Instead Senior Care ® franchise office is independently owned.
‘Navigating the System’ Finding early opportunities to access Community Services- ‘Discharge to assess’ work stream Bie Grobet South Warwickshire Foundation.
‘Changing the balance’ A 2020 Vision of Health and Social Care in Sheffield #2020vision Primary Care Sheffield.
Memorial Hermann Healthcare System Clinical Integration & Disease Management Dan Wolterman April 15, 2010.
Service 19 TH JUNE 2014 /// SEPTEMBER 4, 2015 ALISON CLEMENTS.
Friendly to Seniors December 3, New Models of Care Health Sciences North and North East Community Care Access Centre developing and introducing.
Yvonne McWean Lambeth Primary Care Trust 24th February 2009.
Satbinder Sanghera, Director of Partnerships and Governance
Commissioning alternatives to hospital Dr Seth Rankin Rob Persey.
Acute Quality Standards Dan Beckett Acute Physician CMO Advisor for Acute & General Medicine.
Phase Two Learning Session 0 6 May 2013 Diana Dowdle - Campaign Manager David Grayson – Campaign Clinical Leader.
Applying for a North West Regional Innovation Fund award Manchester, 29 July 2010.
The Community Programme Better Together 4 th December 2013 Comprehensive Geriatric Assessment in Nottinghamshire.
Welcome to February’s ETAG Su Long, Chief Officer.
Frail Older People Programme Greater Nottingham Jeremy Griffiths Clinical Lead / Chair of SIGNS 30th October 2013.
© Imperial College LondonPage 1 Consultants in Integrated respiratory care? Martyn R Partridge Professor of Respiratory Medicine NHLI at Charing Cross.
1 The Forth Valley Experience (a journey across two decades) Peter Murdoch.
Specialised Geriatric Services Heather Gilley Sharon Straus.
Flow Cost Quality: Transforming non-elective healthcare for older people Tom Downes 4 th March
West Lothian Community Health and Care Partnership Frail Elderly Programme Introduction – Marion Christie, Head of Health Data Label : Internal.
The crisis in our health and social care systems, and what needs to happen to align the UK system with the needs of its citizens Ian R. Smith Chairman.
Acute Care for Elderly ACE (We certainly think we are)
Implementing teach-back using improvement methodology 11 th March 2013 Julie Adams Senior Programme Manager, NSD.
Long-Term Care: Exploring the Possibilities Improving Medical and Social Service Coordination for Persons with Chronic Illness Mark R Meines, Ph.D. George.
Healthy Lives, Healthy Futures NEL Partnership Board update 13 th November 2014.
Clinical case management and its role in the continuum of care.
Safer Start 8am Monday 08 th February – 8am Monday 15 February.
 Friends and Family Test (FFT) -single question ‘would you recommend…’  The Adult National Inpatient Survey (AIPS) - AIPS uses validated questions based.
Geriatrics in UK vs Norway Sameer Maini Overlege geriatrisk avdeling, Ålesund GerIT –
Cardinia-Casey Community Health Service (CCCHS) Partnership Development with Casey Hospital Michael Jaurigue Senior Clinician Physiotherapist Belinda Ogden.
Berkshire West 10 Frail and Older People Pathway Redesign Programme
NHS West Kent Clinical Commissioning Group Frail Elderly Care Developing a whole system model of care for West Kent.
Helen Lingham – Chief Operating Officer Gill Adamson – Director of Nursing and Operations.
Using Quality Improvement Methodology To improve Acute Flow at Wrexham Maelor Hospital.
Dr. Andrew Foulkes Medical Director Surrey and Sussex Area Team Clinical Senate Summit A&E, Acute Medicine and the Medical Specialties.
Bedford Borough Health and Wellbeing Development Event for Key Stakeholders 11 July 2012 Professor Patrick Geoghegan OBE Chief Executive.
Clinical Perspective Transformation and Toyota Tom Downes MB BS, MRCP, MBA, MPH (Harvard) Sheffield Teaching Hospitals The Health Foundation IHI QI Fellow.
Big Room Workshop Tom Downes
A Foundation for Paul Grundy MD, MPH IBM Chief Medical Officer Director, Healthcare Transformation Healthcare Industry A Foundation.
The West Lothian Frailty Programme
Emergency and Unscheduled Care Right patient, right place, first time Update to Trust Board 3 June
Clare Lewis1 Zena Moore 2 Tom O’Connor3 Declan Patton4 Linda E Nugent5
NHSI - Criteria Led Discharge Case study: Oxleas NHS Foundation Trust
CARE ENHANCING PRIMARY
Aoife Dillon cAdvanced Nurse Practitioner Older Persons
Community Integrated Teams Penny Davison and Jennifer Wilkie 19th February, 2015 Working together to deliver better health and social care to the people.
Unscheduled Care Forum September 4th, 2018
P. G. Davey1, C. E. Bucknall2, A. Patton3
Presentation transcript:

Redesigning Acute Care for Older People: The Start of Sheffield’s Journey Tom Downes MB BS, MRCP, MBA, MPH (Harvard) Clinical Lead for Quality Improvement Sheffield Teaching Hospitals The Health Foundation / IHI Quality Improvement Fellow 28th November 2012

UNSUSTAINABLE Healthcare inflation 4.3% per year over the last 30 years Driven by technology and expectation Only 0.4% attributable to ageing Need to deliver over 20% more care in 5 years’ time Need to deliver over 50% more care in 10 years’ time UNSUSTAINABLE Rises in healthcare spending: where will it end? Jon Appleby, BMJ 1st November 2012 Rises in healthcare spending: where will it end? Jon Appleby, BMJ 1st November 2012

‘We must redesign services. Decisions about service redesign must be clinically led and clinicians must be prepared to challenge the way services - including their own service – are organised.’ Hospitals on the Edge – The time for action Royal College of Physicians, 13th September 2012

Day 2127 as a consultant

A ‘system’ problem We have a problem. A combined health and social care of Sheffield challenge. This control chart shows the length of stay of consecutive patients discharged over 3 months last year. Over the whole year, the average length of stay in geriatric medicine was about 20 days. We have approximately 300 geriatric medicine beds with a length of stay roughly 50% longer than expected for our case-mix. Last year, our nurses measured that 48% of our inpatients are ‘waiting’ rather than receiving acute hospital care. This waiting and delay is harmful for older people: infection risk, immobilisation and pressure ulcers, infection risk, falls risk and institutionalisation. We have set out on a journey to redesign our system for our patients.

A complex system problem We mapped out our processes – they are very complex.

2003 Toyota Corolla

How do others design complex systems? Toyota Oobeya Room Our system is so complex we realised that we need a methodology to redesign a very complex service. Modern cars are very complex and involve many different processes and technology. We can see similarities to modern health care which also has many different processes and technology. We have decided to use a methodology from the car industry that we have translated to healthcare. We do not talk about tyres, engines and petrol. For us it’s about nurses, doctors, therapists and medication.

First find a room

The Room We meet regularly in a room set up to share our learning between all our health and social care interprofessional groups. It was a coffee room that we underused.

Board 1: The Business objectives: GSM weekly bed occupancy from April 07 with target lines Board Level Business objectives for GSM

Board 2: What do these objectives mean for our patients? A Future State diagram Of the GSM Process as it evolved Post-it note comments from stakeholders

Board 3: How are we doing against the GSM business and patients objectives?

Board 4: High Level GSM Process through the complex health and social care system & Board 5: Real time plan High Level: Current State Map of the GSM process Programme Plan time April 01 2012 Each row presents the tasks (yellow post-its)to be performed by each stakeholder group

Tests

Let me introduce ‘George’ PDSA tests of moving from ‘post take’ to ‘on take’ Let me introduce ‘George’ We have tested changing the way consultant geriatricians work at the front door. We demonstrated that we can reduce the average time from arrival at hospital to being seen by a consultant geriatrician from about 20 hours to near to 4 hours. George (not his real name, nor his real picture) was involved in one of our first tests of changing outpatient care. Usually it takes about 3 months for patients to navigate the process of getting from referral by their GP through a first visit, tests and a second visit to see the consultant for a definitive diagnosis. We tested whether we could deliver that 3 month process in less than 8 hours. George came to see us the next working day after we contacted him and his daughter. From arrival at hospital we did everything including; history, examination, test, physio assessment (he was fitted with a walking stick), consultant review. He left less than four hours after arriving with a letter in his hand documenting everything that had been done with all the results. He had lunch at home with his daughter. His daughter (who works) was delighted by the way the care was organised. 82 years old Lives independently and wants to continue doing so Widowed 5 years ago Has mild dementia Daughter lives locally Losing weight and finding walking more difficult

Challenge to UK geriatric medicine traditions: Split of inpatient / outpatient care Combined immediate delivery of specialist MDT care

This is a control chart of the demand for specialist geriatric care over 6 months. We have measured the demand of our service. We know that we have to design to be able to deliver a specialist multidisciplinary assessment including tests to 26 patients per day to be able to meet our demand 80% of the time. We know how important it is to not design for our average of 17 assessments per day as this would mean that half the time we wouldn’t be able to meet the demand and queues would form.

Batching patients for ‘Post-take ward round’ Real-time senior specialist review (7/7) Bedded medical assessment unit could be unnecessary for most geriatric medicine patients

Twice weekly senior clinician ward rounds Daily senior decision capability on every ward

MDT planning meetings Assess needs at home once acute hospital environment no longer adding value

Through the testing we have learned that the same nurses, doctors and therapists look after patients regardless of how they are referred to us. We have measured how fragmented the function of this team is. In our tests, this interprofessional team has to work in 5 different places. This fragmentation makes us less efficient.

Porter’s Value Based Design Integrated Practice Units Measure Outcome Bundled Pricing Integrate across Geography Expand Excellence Enabling IT platform VALUE What Is Value in Health Care? Michael E. Porter, Ph.D. N Engl J Med 2010; 363: 2477-2481December 23, 2010

Implementation headlines: April 2012 New discharge process from assessment units Consultant geriatricians ‘on take’ 7 days per week May 2012 Frailty Unit process initially virtually Frailty Unit opens mid-May July 2012 Ambulatory care area for work formerly considered to be outpatient

Outcome measure: 34% increase in discharge within 1 day

Outcome measure: Bed occupancy reduced by over 60 beds

Was reduction in bed usage due to reduced admissions? No

Would it have happened regardless? Balance measure: Would it have happened regardless?

Decrease in readmissions Balance measure: Decrease in readmissions

Balance measure: Decreased mortality

Value Value = Outcome / Cost Return on investment = Saving – Investment / Investment = (£3,000,000 - £750,000) – 140,000 / £140,000 = 2,110,000 / 140,000 = 15

Not hospital @ home Resources have started to move to the community Designing hospital@hospital and home@home

We feel like we are at the bottom of an enormous cliff. At the start it felt completely insurmountable. Through testing we have started to find some hand and foot holds to start climbing. Through the measurement and interprofessional discussions we are beginning to plot a route. We still have a long way to go.

‘Improvement in health care is 20% technical and 80% human’ Marjorie Godfrey The Dartmouth Institute

Conclusion Modern health care is complex Iterative testing and prototyping is required Cooperation between and health and social care is essential Our journey has only just started 35

Thank you Tom.Downes@sth.nhs.uk @sheffielddoc