DPA PFG “Professional Services That Count” 9-May-15 E File Reference PFG PPT TEMPLATE 1 UNCLASSIFIED Space Projects Risk Management is the Key to Success.

Slides:



Advertisements
Similar presentations
Il Project Cycle Management :A Technical Guide The Logical Framework Approach 1 1.
Advertisements

Mindari Session Scoutsafe and Risk Management By RL Brian See
PROJECT RISK MANAGEMENT
Note: See the text itself for full citations. Information Technology Project Management, Seventh Edition.
Project Management Gaafar 2007 / 1 This Presentation is uses information from PMBOK Guide 2000 Project Management Risk Management* Dr. Lotfi Gaafar.
Managing Risk: Turning the Titanic Into the Love Boat Kevin Lyday, CISSP, PMP, CIPP/G, CEA, etc. Associate Director, Information Resources, Office of Public.
Risk Analysis & Management. Phases Initial Risk Assessment Risk Analysis Risk Management and Mitigation.
Project Risk Management
COMP8130 and COMP4130 Adrian Marshall Verification and Validation Risk Management Adrian Marshall.
Project Risk Management
Proprietary and confidential. © 2006 Perot Systems. All rights reserved. All registered trademarks are the property of their respective owners.
Unit Slides by UK Versity.  Unit aims:  This unit aims to help the learner with an opportunity to develop their project management and research skills.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Project Risk Management
PMI Knowledge Areas Risk Management.
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Project Risk Management Supplement. The Importance of Project Risk Management  Project risk management is the art and science of identifying, assigning,
Mark Piekarz, Ian Jenkins and Peter Mills
Chapter 10 Contemporary Project Management Kloppenborg
HIT241 - RISK MANAGEMENT Introduction
BSBPMG407A Apply Risk Management Techniques 1 Apply Risk Management Techniques Project Risk Processes Part 2 C ertificate IV in Project Management
Linac4 Risk Assessment Criteria and Methodology. Linac4 General Meeting – C. Rossi Definitions A risk is any event that could produce a change.
Risk Management - ACostE Kate Boothroyd FIRM Director, KB Risk Consulting Limited.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Project Risk Management For IT Professionals António Vieira Manager, Viatecla SA III Encontro Da Comunidade SQLPORT Lx,
Basic Impact Evaluation Course Poverty Analysis Initiative (C102) Poverty Analysis Initiative (C102) World Bank Institute Attacking Poverty Program.
Managing Risks in Projects. Risk Concepts The Likelihood that some Problematical Event will Occur The Likelihood that some Problematical Event will Occur.
Risk Management Project Management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Quick Recap Monitoring and Controlling. Phases of Quality Assurance Acceptance sampling Process control Continuous improvement Inspection before/after.
IT Project Management, Third Edition Chapter 11 1 Chapter 6: Project Risk Management.
1 TenStep Project Management Process ™ PM00.7 PM00.7 Project Management Preparation for Success * Manage Risk *
Risk Management in the Built Environment Qualitative and Quantitative Risk Management By Professor Simon Burtonshaw-Gunn – licensed under the Creative.
Software Project Management
RISK MANAGEMENT Copyright (c) 2011 FutureSoft ( 1.
AMERICA’S ARMY: THE STRENGTH OF THE NATION Mort Anvari 1 Cost Risk and Uncertainty Analysis MORS Special Meeting | September.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
Risk Management in a Collaborative Environment John Lofty 5 March 2004.
Risk Management Handbook by H Global Managing Project - Group H Samuel SuarezMark McCann Ankit TanejaNazmul Alam LaurenceHsuTony Huang Farid MojahediEddie.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Question Four: Project Risk Management PMBOK definition of Project Risk Project risk management is the art and science of identifying, analyzing, and responding.
Introducing Project Management Update December 2011.
SOFTWARE PROJECT MANAGEMENT
Initiation and Planning for Success Sridhar Seshagiri Rao, PMP Innova Solutions Inc. Santa Clara, CA. April 9 th 2004.
Project Risk Management Planning Stage
Topic 5 Initiating a project
Project Risk Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 3 rd Edition, Project Management.
Project Management Risk and Quality.
What is project management?
Fundamentals of Governance: Parliament and Government Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
1 Project Management C53PM Session 4 Russell Taylor Staff Work-base – 1 st Floor
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
Overview PRINCE Hogeschool Rotterdam. 2 Project definition  A project is a temporary organization that is created for the purpose of delivering.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
Project Management PTM721S
Project Management – PTM712S
Chapter 11: Project Risk Management
Understand the principles of effective decision making
Project Risk Management
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
PMI North Area PMP Exam Study Group
Software Project Management (SPM)
CIS12-3 IT Project Management
Risk Adjusted Project Schedules
Mumtaz Ali Rajput +92 – SOFTWARE PROJECTMANAGMENT Mumtaz Ali Rajput +92 –
Project Risk Analysis and Management: L3
Project Risk Management
Presentation transcript:

DPA PFG “Professional Services That Count” 9-May-15 E File Reference PFG PPT TEMPLATE 1 UNCLASSIFIED Space Projects Risk Management is the Key to Success Presented to the

DPA 9-May-15 2 UNCLASSIFIED 2 AIMS To create an awareness of some of the techniques that can be employed to complete a successful Project Risk Analysis

DPA 9-May-15 3 UNCLASSIFIED 3 Today’s Agenda  Background to the Problem  A Process to address the Problem  An Example of a Project Risk Network  Summary and Questions

DPA 9-May-15 4 UNCLASSIFIED PROJECT SUCCESS = on time, on cost, to spec

DPA 9-May-15 5 UNCLASSIFIED 5 BACKGROUND  NAO audits MoD’s Major Projects  Yearly monitor of Costs and TimescalesTimescales  Benefits of SMART Acquisition  Moving towards a more informed forecastforecast

DPA 9-May-15 6 UNCLASSIFIED 6 Defence Journal of the DPA

DPA 9-May-15 7 UNCLASSIFIED 7 Risk Maturity Assessment WHAT IS A RISK MATURITY ASSESSMENT? to independently assess maturity of the risk management process to produce prioritised action plans for improvement Initial Process

DPA 9-May-15 8 UNCLASSIFIED 8

DPA 9-May-15 9 UNCLASSIFIED 9 MoD’s Risk Management Process

DPA 9-May UNCLASSIFIED 10 Identify  Use prompts, list and characterise elements  Include risk source, event consequences & context of the risk  Opportunities may also be revealed  Think out of the box  Engage all stakeholders - IMPORTANT

DPA 9-May UNCLASSIFIED 11 Analyse

DPA 9-May UNCLASSIFIED 12 Analyse  Two stage assessment process  Qualitative against agreed criteria  Probability of risk occurring  Impact on time, cost and performance  Display as a PIGPIG  Ownership of risk  Where and when it could occur  Quantitative

DPA 9-May UNCLASSIFIED 13 Quantitative stage  Define the measure of PROBABILITY e.g.  High >50%, Medium 20%- 50%, Low <20%  Define IMPACT on COST e.g.  High >30%, Medium %, Low <10% or  High >£250k, Medium £50k- £250k, Low <£50K  Define IMPACT on TIME e.g.  High >30%, Medium %, Low <10% or  High >6 months, Med 3m - 6 m, Low <3m

DPA 9-May UNCLASSIFIED 14 Risk Register Serial No. Risk Title Activities Affected Probability Impact Perf. Cost Sched. Risk Reduction Ownership Risk Questionnaire Level 1 Sample summary Sheet

DPA 9-May UNCLASSIFIED 15 Plan

DPA 9-May UNCLASSIFIED 16 Plan  Classify  Tolerate - No action but reassess  Reject - i.e. not valid at this stage  Handle - require action  Risk Handling  Mitigation Strategies - risk reduction  Fallback Plans - an alternative

DPA 9-May UNCLASSIFIED 17 Risk Handling  Mitigation Strategies  Terminate Terminate  Treat Treat  Transfer Transfer  Tolerate Tolerate  Fallback or Contingency Plans  an alternative taken up if a risk occurs  trigger point set to allow sufficient time to be effective

DPA 9-May UNCLASSIFIED 18 Manage

DPA 9-May UNCLASSIFIED 19 Proactive/Reactive  Implement  by the Risk Manager, Stakeholders, using the Risk Plan Risk Plan  Monitor  Maintain Risk Records/Register, easy access  Review  Use results of Qualitative/Quantitative analysis  Report  Relevant & Concise analysed data

DPA 9-May UNCLASSIFIED 20 Managing a Project Why Plan? What do we need to know about the schedule?  Duration of the project  Milestones  Chances of achieving target?  By how much?  What part of project needs special attention?

DPA 9-May UNCLASSIFIED 21 Point Estimates Conventional single point estimate 095 Time

DPA 9-May UNCLASSIFIED 22 Dur MayJunJulAugSep Element Description  Project Total  Design  Design Approval  Purchase L/ L Items  Produce Drags  Purchase Raw Matls  Make Piece parts  Purchase B/O Items  Purchase Sub-Con  Inspect Sub-Con  Prepare Tech Docs  Typeset, print & bind  Assemble  Test  Pack & Despatch Sample Network

DPA 9-May UNCLASSIFIED 23 Reality ! 095 Could be as low as this Could be as high as this Time

DPA 9-May UNCLASSIFIED 24 Cycling to Work Uncertainty: Most likely - 30 mins Minimum - 20 mins Maximum - 50 mins Time Risks: Puncture? 3PE & Prob Accident? 3PE & Prob Time Risks

DPA 9-May UNCLASSIFIED 25 Combining Risk with Uncertainty Achieved via Monte Carlo Simulation Works by simulating the project many times using the estimated distributions and plotting the outcomes Can be used for time or cost Achieved using a Computer Based Tool such as Crystal Ball, ARM

DPA 9-May UNCLASSIFIED 26 The Estimate Process Risk Register 3 Point Estimates Cost 10%-50%-90% Confidence levels Schedule 10%-50%-90% Confidence levels Schedule 3 Point Estimates * Modelling Cost 3 Point Estimates

DPA 9-May UNCLASSIFIED 27 3 Point Estimates

DPA 9-May UNCLASSIFIED 28 Roll the dice !!

DPA 9-May UNCLASSIFIED 29 Monte Carlo Simulation Combined distribution =

DPA 9-May UNCLASSIFIED 30 Probability of outcomes Probability % Time Days 95 Days 42%

DPA 9-May UNCLASSIFIED 31 Target Outcome % Confidence Range of Project Outcomes Target here? No Problems Expected 100% 0% Target here? Serious Problems Expected Target here? Manageable Problems Expected

DPA 9-May UNCLASSIFIED 32 Understanding the results  l ‘No problem’ targets are likely to be inefficient and contain contingency  l Targets within the range of possible outcomes are likely to be achievable and efficient l ‘Serious Problem’ targets are likely to be unachievable.

DPA 9-May UNCLASSIFIED 33 Criticality - Single Point START FINISH Critical Path

DPA 9-May UNCLASSIFIED 34 Criticality - 3 point START FINISH Critical Path

DPA 9-May UNCLASSIFIED 35 Criticality Index

DPA 9-May UNCLASSIFIED 36 Schedule Summary l Prioritise Risks High Medium Low HighMediumLow l Quantify Risks l Understand Results l Identify Risks

DPA 9-May UNCLASSIFIED 37 Summary 1  Risk Identification  Break down the task, identify the risks and their responses  Analysis  Model the individual elements and combine them to form an overall result  Planning  Plan for corrective actions, risk reduction options and fall-back plan  Management  Carry out and monitor the plans

DPA 9-May UNCLASSIFIED 38 Summary 2  GIGO  Stakeholder involvement  Take it seriously  Mandated Process in MoD

DPA 9-May UNCLASSIFIED n PFG Risk-1 (Dave Burgin) n PFG Risk-8 (Paul Woodward) Mail Point # 2104 LARCH level 1a MoD Abbey Wood, Bristol n Tel No n FAX n - – More information ?? – DAWN Knowledge Base – PFG WEB Site ANY QUESTIONS ? PFG “Professional Services that Count”

DPA 9-May UNCLASSIFIED 40 Risk Plan Typical contents  Purpose, Roles, Methodology, Tools, Techniques, Reviews, Definitions, Reporting by applying the principles of  Who, What, When, Why, Where and How to each topic

DPA 9-May UNCLASSIFIED 41 LowMediumHigh 0 3 Low Medium Probability Impact 3 P I Grid Risk 3 & 5 Risk 2 Risks 1 & 4

DPA 9-May UNCLASSIFIED 42 Quantitative Risk One Two Three Four Five 3 Pt Est Min ML Max Distributions Project Range

DPA 9-May UNCLASSIFIED 43 Terminate Take action to avoid the risk occurring

DPA 9-May UNCLASSIFIED 44 Treat Take action to REDUCE the risk’s impact

DPA 9-May UNCLASSIFIED 45 Transfer Is another stakeholder better placed to manage the risk?

DPA 9-May UNCLASSIFIED 46 Tolerate Can the Project accept the consequences of a risk?

DPA 9-May UNCLASSIFIED 47 Legacy Projects