Brunswick Nuclear Plant Storm Drain Stabilization Pond Groundwater Investigation and Remedial Evaluation Presentation Prepared and Presented by: Silar.

Slides:



Advertisements
Similar presentations
Overview of the EPRI Groundwater Assessment Program
Advertisements

Groundwater Mounding and Minnesota ISTS Rules MPCA 2/21/06.
Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
1 Results Based Regulation Implications for Municipal Solid Waste Management Presented By: Blake E. Nesbitt Saskatchewan Ministry of Environment SUMA Convention.
BoRit Superfund Site Timeline
Part III Solid Waste Engineering
The Process of Siting and Approving a New Landfill in Ontario
1 Characterization of Groundwater Contamination at Yankee Nuclear Power Station - Rowe, MA RETS-REMP Workshop June 26-28, 2006 – Mashantucket, CT Dave.
Brunswick Nuclear Plant Storm Drain Stabilization Pond Tritium Issues.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Vermont Yankee VSNAP Presentation February 22, 2011 Mike Romeo Director NSA.
Airport Road Waste Disposal Area April 28, 2005 The University of North Carolina at Chapel Hill.
ENVIRONMENTAL MANAGEMENT PLAN
EnviroSense, Inc. An Overview of Environmental Factors in Developing Brownfields Sites in Massachusetts Presented By: Eric S. Wood, P.Hg., PG, LSP President.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
TRP Chapter Chapter 4.2 Waste minimisation.
RETS REMP 2007 Philadelphia, PA June 25 – 27, 2007 Eric L. Darois, CHP
Tritium: Fleet-Wide Assessment Program Zigmund A. Karpa Director Environmental and Regulatory Affairs.
Codex Guidelines for the Application of HACCP
Investigating Ground Water Contamination at Ohio’s C&DD Landfills Aaron Shear Ohio’s Solid Waste and C&DD Program Annual Meeting May 9, 2013.
Module 4: Getting Ready: Scoping the RI/FS. 2 Module Objectives  Explain the purpose of the scoping phase of the RI/FS  Identify existing data which.
GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
Experiences and lessons learned from the TNA of China WANG Can Tsinghua University, China UNFCCC workshop on Technology Needs Assessments Bonn, Germany.
Interim Update: Preliminary Analyses of Excursions in the A.R.M. Loxahatchee National Wildlife Refuge August 18, 2009 Prepared by SFWMD and FDEP as part.
Industrial Engineering Roles In Industry
GFOA PS3260 Contaminated Sites Workshop Thursday, November 14, 2013 Whitehorse, YT.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Land Treatment and the Conservation Planning Process CNMP Core Curriculum Section 3 — Land Treatment Practices.
Jan Smolders ( 史默德) Independent Consultant Soil & Groundwater Remediation Jan Smolders, Client Advisor Soil & Groundwater Remediation 1.
Monitoring and Protecting Groundwater During Oil & Gas Development Overview of Colorado Aquifer Systems November 26, 2012 Christopher J. Sanchez, P.G.
Remediation System Design & Implementation Presented by.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
Fairbanks Areawide Industrial Reclamation Project ADEC AREAWIDE MANAGEMENT GOALS Janice Wiegers ADEC.
Presented by Michael Taraszki, PG, CHG Engineering and Consulting, Inc. Perchlorate Monitoring in the Llagas Groundwater Subbasin South Santa Clara County,
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
Climate Change and Water Resources Planning Kim Shugar Department Director Intergovernmental Programs Kim Shugar Department Director Intergovernmental.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Maryland Department of the Environment Harbor Point – Regulatory Overview Horacio Tablada, Director Land Management Administration November 14, 2013.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
DNAPL Recovery System July 2010 Progress Meeting McCormick & Baxter Superfund Site Portland, Oregon.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
Regulatory Framework for Uranium Production Facilities in the U.S.
Groundwater and NAPL Monitoring Oregon DEQ, Hart Crowser, Inc., and GSI Water Solutions 2010 McCormick & Baxter Annual Report.
System Monitoring at the DAEC SysMon SMART Teaming up to get the most out of System Monitoring!
Conceptual Site Models Purpose, Development, Content and Application CP Annual Training October 27, 2015.
Strategic Planning for Contaminated Sediment Projects: Setting the Course for Proper Project Execution Howard L. Cumberland Geosyntec Consultants October.
Groundwater Protection Project Greg Robison Project Manager Ed Sullivan Consulting Engineer June 23, 2008.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
Environmental Considerations prior to purchasing Properties Sabine E. Martin, Ph.D., P.G. Center for Hazardous Substance Research Kansas State University.
Massachusetts Waste Site Cleanup Program _________________________________ Privatized program since 1993 Direct oversight of only the highest priority.
Metropolitan Council Water Supply Planning in the Northwest Metro Water Availability Technical Focus Group : June 9, 2008 Lanya Ross Senior Environmental.
Results of 2001 Barksdale Site Investigation April 2, 2002 Presented by: DuPont Corporate Remediation Group.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Marian Anderson Place Site Update City Commission Special Workshop December 14, 2015.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
Using Insurance to Fund Brownfield Development Technical Issues Geoff Glanders, President August Mack Environmental, Inc.
Selection Criteria and Invitational Priorities School Leadership Program U.S. Department of Education 2005.
Upland Landfill Waste Discharge Application 7295 Gold River Highway
ASSESSMENT OF CORRECTIVE MEASURES PUBLIC MEETING
Welcome.
Directive 2006/118/EC Short overview
Georgia Agricultural Metering Program
Directive 2006/118/EC Short overview
Presentation transcript:

Brunswick Nuclear Plant Storm Drain Stabilization Pond Groundwater Investigation and Remedial Evaluation Presentation Prepared and Presented by: Silar Services, Inc.

Project / Presentation Overview Investigation Status Final Groundwater Investigation Report completed 3/2008 Review of ongoing monitoring data for groundwater and surface water Quarterly reports for ongoing groundwater/surface water monitoring activities Remedial alternative selected, engineering design process underway in 1st quarter 2008 Remedial Evaluation Remedial Action Objectives (RAOs) Potential Remedial Options Summary/Questions

Objectives and Methodologies Initial Scope Characterize the nature and extent of tritium in groundwater adjacent to the SDSP in accordance with the Groundwater Protection Initiative (GPI); Develop a conceptual site model for the SDSP that establishes the relevant transport pathways and potential receptors associated with the release of tritium from the SDSP Establish a comprehensive groundwater monitoring program Based on results of investigation, additional scope included: Determine applicable or relevant and appropriate requirements (ARARs) and establish remedial action objectives (RAOs) Screen and evaluate remedial alternatives available to address site conditions and RAOs

Field Investigation Summary Completed an initial evaluation of data and physical characteristics of the SDSP and surrounding environs Established access to remote, wooded areas around the SDSP that required investigation Installed a network of 15 shallow groundwater monitoring wells, 7 intermediate-depth wells,1 deep bedrock monitoring well, and 6 marsh wells (additional pre-existing wells were evaluated and incorporated into the monitoring network, where appropriate) Collected soil samples for geotechnical parameters Completed “preliminary” groundwater monitoring and real-time data evaluation throughout the effort Identified site conditions and data gaps in real time Allowed for completion of the groundwater investigation during a single mobilization

Field Investigation Summary (continued) Completed an initial hydraulic characterization of the groundwater aquifers via pump tests and rising head slug tests Completed a 3-month synoptic hydraulic study to evaluate hydraulic relationships between the SDSP, groundwater aquifers, and surface water (tidal effects) Developed a conceptual site model and analysis of transport pathways for all associated groundwater pathways Completed area reconnaissance to identify off-site groundwater uses/withdrawals

Development of the Groundwater Monitoring Program Designed and installed a GeoSmart groundwater monitoring system consisting of a dedicated bladder pump, teflon® tubing, heavy duty bladder, and integrated well head system Facilitate consistent, program-wide hardware and sample collection methodology Provide user friendly interface and rugged hardware for long-term deployment Appropriate for collecting groundwater samples consistent with USEPA low-flow methodology Established a monthly groundwater monitoring program for associated shallow, intermediate, deep, and marsh wells Trained facility personnel to properly perform monthly groundwater sampling activities

Groundwater Investigation Summary Final Groundwater Investigation Report submitted in March 2008 Findings Area underlain by 3 individual aquifers (shallow, intermediate and deep) Widespread tritium impacts in shallow, isolated impacts in intermediate, no impacts in deep. Tritium observed in marshes and adjacent creeks Site hydraulic are such that impacts will migrate off-site Shallow to Nancy’s Creek and Shallow to Intermediate to Off-site Migration of tritium in on-site groundwater to off-site groundwater has not been observed SDSP Area Achieves EPRI Program Level 3 Status

Monitoring Well and Hydrogeologic Cross Section Location Map

Hydrogeologic Cross Section

Groundwater Flow – Shallow Aquifer

Shallow Aquifer Groundwater Results for Tritium (pCi/L) - October 2007

Trend Analysis - Shallow Aquifer

Result of Reducing Source Term Elimination of Primary Source of Tritium to SDSP (June 2007) Reduction of SDCB concentrations from upwards of 1,000,000 to 50,000 pCi/L.

Groundwater Flow – Intermediate Aquifer

Intermediate Aquifer Groundwater Results for Tritium (pCi/L)

Trend Analysis - Intermediate Aquifer Groundwater

Groundwater Flow – Deep Aquifer

On-going Monitoring Weekly monitoring of surface water 17 surface water monitoring waypoints Monthly monitoring of groundwater 40 groundwater monitoring stations Findings Tritium concentrations in groundwater generally consistent with initial results Reduced source term to the pond appears to have positive result on groundwater concentration at the source Increasing concentration of tritium in groundwater samples collected from intermediate monitoring well ESS-19B raises concerns regarding vertical migration from shallow to intermediate aquifer (i.e. potable supply aquifer) Detectable concentrations of tritium in surface water samples

Off-site Detections in Surface Water

Evaluation of the Marsh and Creek SDSP tritiated water seeps through dike and transports to marsh Groundwater flows from the SDSP through the upper sand into the creek as baseflow Ongoing evaluation to determine appropriate method, model and model inputs to facilitate dose calculations associated with unmonitored release to the adjacent creeks accounting for these two mechanisms Groundwater flow / tritium fate and transport modeling Use of ongoing monitoring data to calculate dose per unit time Model to account for tidal effects and heterogeneity

Remedial Options – Remedial Action Objectives Remedial Action Objectives (RAO) were developed for the Stabilization Pond release based on Federal, State and Local rules and regulations along with industry best management practices RAOs include: Reduce the continual migration of tritium in groundwater on-site and off-site to protect human health and the environment Control future uncontrolled releases of tritiated water through the SDSP to the environment Reduce the concentration of tritium in groundwater to a concentration less than the Federal MCL of 20,000 pCi/L

Remedial Options – Potential Remedial Actions Six remedial actions were evaluated in the Final Report including: Monitored Natural Attenuation (MNA) Containment (Barrier Wall) with MNA Containment (Impoundment) with MNA Containment (Barrier Wall and Impoundment) with MNA Site-wide Groundwater Extraction with MNA Focused Groundwater Extraction with Containment (Impoundment) and MNA Each alternative was evaluated against the primary criteria of: effectiveness, implementability, and cost.

Remedial Options – Alternative 1 - MNA MNA involves no active remedial measures and relays on natural processes to achieve the RAOs Assumes status monthly monitoring to plant closure Evaluation criteria summary Effectiveness – will not meet any of the RAOs, provides no protection to human health or the environment Implementability – easily implemented, continue monthly monitoring, no construction activities Leads to high decommissioning costs Summary – Alternative 1 will not achieve the RAOs

Remedial Options – Alternative 2 - Containment (Barrier Wall) with MNA Alternative 2 involves installation of low permeability vertical barrier wall to control horizontal flow of tritiated groundwater in the shallow aquifer Assumes wall would be construction around ~90% of the pond, approximately 6,400 ‘ long, 45’ deep and 3’ wide Evaluation criteria summary Effectiveness – shallow groundwater within the impoundment would be controlled, but increases vertical migration into deeper aquifers Implementability – using fairly typical construction equipment, 6-12 months Summary – Alternative 2 would control shallow groundwater within the impoundment, it would not achieve the RAOs since it would not address impacted groundwater outside the impoundment or the vertical migration of shallow groundwater to the intermediate aquifer

Remedial Options – Alternative 3 - Containment (Impoundment) with MNA Alternative 3 involves construction of a low permeability impoundment within the SDSP to control the future uncontrolled releases of tritium into the environment Assumes lined impoundment (2 liner systems evaluated), 350,000 sq.ft., 13.65 mg capacity. Evaluation criteria summary Effectiveness – will control future releases to the environment, will not effect continual migration of tritiated groundwater Implementability – with fairly typical construction equipment, 6-12 months Summary – Alternative 3 would control future releases to the shallow aquifer, however it would not achieve the RAOs since groundwater outside the impoundment would continue to migrate horizontally and vertically on-site and off-site.

Remedial Options – Alternative 4 - Containment (Barrier Wall and Impoundment) with MNA Alternative 4 involves the primary element of Alternatives 2 and 3. Assumes construction of a barrier wall and impoundment (non-RCRA liner) as previously described Evaluation criteria summary Effectiveness – Shallow groundwater within the barrier wall will be controlled and future uncontrolled releases to the environment through the SDSP would be eliminated Implementability – with fairly typical construction equipment, 6-12 months Summary – Alternative 4 would control shallow groundwater within the impoundment and eliminate continual releases through the SDSP, however it would not achieve the RAOs since it would not address impacted groundwater outside the impoundment or the vertical migration of shallow groundwater to the intermediate aquifer.

Remedial Options – Alternative 5 – Site-Wide Groundwater Extraction with MNA Alternative 5 involves extracting groundwater from the shallow aquifer throughout the impacted area to achieve the RAO of 20,000 pCi/L Assumes – installation of over 200 extraction wells with total withdrawal of 154,000 gpd Evaluation criteria summary Effectiveness – would control the off-site migration of tritium in the shallow groundwater Implementability – with fairly typical construction equipment, significant long-term O&M Summary – Alternative 5 would control horizontal migration of groundwater in the shallow aquifer to off-site receptors, it would not eliminate uncontrolled releases through the SDSP or achieve the RAOs.

Remedial Options – Alternative 6 - Focused Groundwater Extraction with Containment (Impoundment) and MNA Alternative 6 involves focused groundwater extraction to control off-site migration and installation of an impoundment within the SDSP to control the future uncontrolled releases of tritium into the environment Assumes elements of Alternative 3 and up to 50 extraction wells to control off-site migration and restore aquifer Evaluation criteria summary Effectiveness – Would be effective in elimating future releases and controlling migration of tritiated groundwater Implementability – with fairly typical construction equipment, some long-term O&M Summary – Alternative 6 would achieve all RAOs.

Selected Remedial Alternative Alternative 6 - Focused Groundwater Extraction with Containment (Impoundment) and MNA is the only remedial option that could achieve the RAOs in the long term. Alternative 6 will: Reduce the continual migration of tritium in groundwater on-site and off-site to protect human health and the environment by: constructing a lined impoundment thereby eliminating the on-going source of tritium impacts (percolation through the bottom of the pond) and extracting groundwater at strategic locations to control the horizontal migration of shallow groundwater to off-site receptors (i.e. Nancy’s Creek) and the vertical migration into the intermediate aquifer. Control future uncontrolled releases of tritiated water through the SDSP to the environment by: constructing a lined impoundment thereby eliminating the on-going source of tritium impacts (percolation through the bottom of the pond).

Selected Remedial Alternation - con’t Reduce the concentration of tritium in groundwater to a concentration less than the Federal MCL of 20,000 pCi/L by: Controlling the source (i.e. eliminating future loading of tritiated water into the shallow aquifer by constructing a lined impoundment) and extracting shallow groundwater with elevated concentration of tritium. Extracted groundwater will be conveyed to the impoundment for subsequent releases to the intake canal under NDPES permit. Groundwater extraction with MNA could reduce the tritium concentrations in groundwater below 20,000 pCi/L thereby reducing decommissioning costs. Fix text formatting

Highlights of the Investigation Process The dedication of the Progress Energy management team facilitated the successful implementation of the investigation program Development of CSM utilizing up-to-date knowledge base leads to updated FSAR and site understanding Avoided pitfalls associated with reliance on historic data collected by others Established low-maintenance, easy to use groundwater sampling system, procedure, and monitoring program implemented by internal resources Improved operational performance as a result of the awareness and identification of SSCs associated with SDSP and BNP Successful media and public relations activities through open house forums and regular contact with local media and officials

Highlights of the Remedy Selection Process Remedial evaluation incorporated detailed short and long-term financial, technical, and environmental considerations Selected remedy incorporates long-term management considerations and environmental objectives with fiscally-responsible remedial approach Selected remedy incorporates existing NPDES-permitted outfall such that it constitutes a redevelopment rather than a new source/discharge Selected remedy is flexible such that pre-design activities can determine treatment requirements, impoundment sizing, well spacing, etc.

Summary/Conclusions Widespread shallow groundwater impacts due to uncontrolled releases for the SDSP On-going monitoring indicates impacts off-site in Nancy’s Creek and increased migration into the intermediate aquifer Six remedial options evaluated Alternative 6 - Focused Groundwater Extraction with Containment (Impoundment) and MNA would achieve the RAOs

Questions