Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004.

Slides:



Advertisements
Similar presentations
Hydrology Rainfall - Runoff Modeling (I)
Advertisements

Hydrology Rainfall - Runoff Modeling (II) Synthetic unit hydrographs
Preliminary Design of Galvez Estates Subdivision.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Review of Flood Routing
Introduction to Surface Water Hydrology and Watersheds Lecture 1 Philip B. Bedient Rice University November, 2000.
Unit Hydrograph Reading: Sections , 7.5, 7.7,
CE 3372 Water Systems Design
Reading: Applied Hydrology, Sec 15-1 to 15-5
PrePro2004: Comparison with Standard Hydrologic Modeling Procedures Rebecca Riggs April 29, 2005.
By Jennifer VerWest. Differences between Flat and Average/Steep Terrain Flat Terrain Steep/Average Terrain.
Engineering Hydrology (ECIV 4323)
CE 3372 – Lecture 10. Outline  Hydrology Review  Rational Method  Regression Equations  Hydrographs.
Hydrologic Routing Reading: Applied Hydrology Sections 8.1, 8.2, 8.4.
Estimating Qmax Using the Rational Method
Reading: Applied Hydrology Sections 8.1, 8.2, 8.4
Stormwater Infrastructure for Water Quality Management Dr. Larry A. Roesner, P.E. CE 394K.2 Surface Water Hydrology University of Texas, Austin April 8,
DES 606 : Watershed Modeling with HEC-HMS Module 5 Theodore G. Cleveland, Ph.D., P.E 29 July 2011.
Module 6: Routing Concepts Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI October 2013 Module 6 1.
Rush River Assessment Project Hydrologic Flow Study Sibley County SWCD Presentation to the Minnesota River Research Forum March 10, 2005.
HEC-HMS Runoff Computation.
WinTR-20 Project Formulation Hydrology Computer Program Overview Presented by: WinTR-20 Development Team.
Time of Concentration and Lag Time in WMS Ryan Murdock CE 394K.2.
Finding the S vs. Q relationship By: Cody Hudson.
STORMWATER MANAGEMENT
Description of WMS Watershed Modeling System. What Model Does Integrates GIS and hydrologic models Uses digital terrain data to define watershed and sub.
Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY.
CE 3372 Water Systems Design Lecture 18: Storm sewers, inlets, conduits and related hydrology and hydraulics.
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
Synthetic UH Definition: Synthetic Hydrograph is a plot of flow versus time and generated based on a minimal use of streamflow data. Example: A pending.
CE 3372 Water Systems Design
Urban Stormwater Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L6 Water Resources Systems Modeling.
1 TR-55 Urban Hydrology for Small Watersheds. 2 Simplified methods for estimating runoff and peak discharge for small urban/urbanizing watersheds Ch 1.
LibHydro.
1 Detention Routing
ERT 246 Hydrology & Water Resources Eng.
DES 606: Watershed Modeling with HEC-HMS Watershed Subdivision Theodore G. Cleveland, Ph.D., P.E. 6 OCT 11.
Rainfall-Runoff modeling Forecasting and predictingForecasting and predicting –Flood peaks –Runoff volumes Due to Large rain and snowmelt events ***especially.
Hydrology & Water Resources Engineering ( )
Sanitary Engineering Lecture 4
UNIT – III FLOODS Types of floods Following are the various types of floods: 1.Probable Maximum Flood (PMF):This is the flood resulting from the most sever.
Modeling an Urban Development with MIKE-SWMM Presented by: Melissa Figurski.
Basic Hydrology: Rainfall-runoff based methods – III
Basic Hydrology & Hydraulics: DES 601
Routing-Hydrologic and Hydraulic
Kristina Schneider February 27, 2001
HEC-HMS Simulation Adding a detention pond at the outlet
TR-55 Urban Hydrology for Small Watersheds
DES 606 : Watershed Modeling with HEC-HMS
Prepared by: Sulyman Khraishe Madhat Z
Cristina Nelson, Term Project, CEE 6440, Fall 2007
EFH-2 Overview Quan D. Quan Hydraulic Engineer USDA – NRCS – WNTSC
CE 3372 Water Systems Design
Review of Flood Routing
Hydrologic Simulation Models
CEE 3430 – Engineering Hydrology David Rosenberg March 26, 2012
Hydrologic River Routing
DES 606: Watershed Modeling with HEC-HMS
Hydrology.
Detention Pond and Channel Stabilization for Bartholomew Park
Where Does Storm Water Go?
Highway Drainage: Determining Flow Rates
Hydrograph Computation
Flood Routing & Detention Basin Design
Review of Flood Reservoir Routing
Determining Peak Flows
Floods and Flood Routing
An Najah National University Faculty of Engineering
بسم الله الرحمن الرحيم (وقل ربي زدني علما)
HEC-HMS Runoff Computation Modeling Direct Runoff with HEC-HMS Empirical models Empirical models - traditional UH models - traditional UH models - a.
Presentation transcript:

Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004

Project Background A detention pond is needed for a developing subdivision in the town of Cicero located in the Jackson Township in Indiana The site is currently a farm field bordered by a fire station, wastewater treatment plant, park, church and residential lands. There is an existing storm sewer that is located north of the site that the detention ponds will be routed to The subdivision will have an average lot size of ¼ acres

Project Goal To design two detention ponds on the west side of the site (one in north portion, the other in the south portion) To meet the maximum release rate into the existing storm sewer set by the Town of Cicero To design a storm sewer system to route runoff to the detention ponds To design an emergency spillway channel that will be routed to Wareham’s Pond (northwest of site)

Model Description HEC-1 generates hydrographs from rainfall data and routes them to reaches and reservoirs Uses the continuity equation (inflow – outflow = change of storage rate), inflow information from design storm hydrograph ordinates, and storage-outflow relationship to calculate flood flow routing

Methods Determined watershed area from a survey map located from the Hamilton county website Determined basin areas from the slope of site Determined curve number for a residential area with an average lot size of ¼ acres Calculated the time of concentration for each sub basin using a figure from SCS National Engineering Handbook

Derived a rainfall intensity equation for the project area and calculated intensities for each sub basin and for the total watershed Calculated the peak flow for each sub basin to determine the pipe diameter for the storm sewer Varied detention pond area and outlet pipe diameter to obtain the best design to meet the maximum release rate into the storm sewer Designed an emergency spillway using the maximum probable storm

Results South Detention pond size 0.5 acres and north detention pond size 0.75 acres, both having a 9” diameter outlet pipe

South storm sewer system pipe diameter 36” to 42” to 48”, North storm sewer system pipe diameter 36” to 42” 36” pipe 42” pipe 36” pipe 48” pipe Sub basin 1 & 2 runoff Sub basin 1, 2 & 3 runoff North East and West Sub basin runoff North East Sub basin runoff Sub basin 1 runoff To pond

Emergency spillway from south detention pond to north detention pond at least 6.4 feet deep, from north detention pond to Wareham’s Pond at least 10.1 feet deep North Detention pond spillway rectangle channel South Detention pond spillway rectangle channel 10 ft 10.1 ft 6.4 ft

Sensitivity Analysis Most parameters were highly sensitive. Lag time, pond depth, and spillway characteristics were not sensitive. Parameters were not as sensitive for maximum stage output as they were for the peak flow

Recommendation for HEC-1 Use HEC-1 is easy to use Model parameters are sensitive to peak flow output Good model to use for designing detention ponds

Conclusion Two detention ponds were designed using HEC-1 A storm sewer system was designed An emergency spillway was designed using HEC-1 and FlowMaster

Questions?