LeanSigma ® Facilitator Training Module 9 – Just in Time.

Slides:



Advertisements
Similar presentations
2009 Lean Ideas, All Rights Reserved1 Lean Manufacturing For Lean Times.
Advertisements

LeanSigma® Fundamentals
CHAPTER FIFTEEN JUST-IN-TIME SYSTEMS Chapter 15 Just-In-Time Systems.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
Just-In-Time and Lean Systems
Operations Management Just-in-Time Systems Supplement 12
Beni Asllani University of Tennessee at Chattanooga
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
CHAPTER 14 Just-In-Time Systems.
Chapter 6, Process-Flow Analysis
JIT/Lean Production Chapter 13.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Welcome 1 Lean Overview. Housekeeping  Emergencies  Bathrooms  Breaks  Food/drinks 2.
SSI Sustainable Solutions International, LLC Developers of SPM ™ Preparing the Workplace for the 21 st Century! the 21 st Century! Preparing the Workplace.
Value Stream Mapping.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
Lean Sigma Facilitator Training Class. LeanSigma ® Facilitator Training Module 1 – Introductions & Expectations.
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
LeanSigma ® Fundamentals Module 2 – Time-Based Strategy & LeanSigma Execution.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 8 Lean Systems McGraw-Hill/Irwin.
Introduction to Lean1 LSSG Green Belt Training Lean: An Introduction.
OMG Operations Management Spring 1997 CLASS 10: Process and Inventory Control (2) Harry Groenevelt.
Takt Time Training Pack.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
LeanSigma ® Facilitator Training Module 5 – Waste.
The Breakthrough Strategy Process Check
LeanSigma ® Fundamentals Module 2 – Time-Based Strategy & LeanSigma Execution.
LEAN system.
JIT and Lean Operations
© 1998 by Prentice-Hall Inc Russell/Taylor Oper Mgt 2/e Chapter 15 Lean Operations in Services and Support Functions.
Value Stream Mapping Quick Start. 2Employ Improvement Initiatives A series of steps that must be performed in the proper sequence to create value for.
Optimizing Care Mark Murray MD, MPA. Gap Between Performance and Possibility For clinical care For clinical care For efficiency in care For efficiency.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
BUAD306 Lean Operations. A flexible system of operation that uses considerably less resources than a traditional system Tend to achieve Greater productivity.
College of Engineering ENGR 1181 Engineering Education Innovation Center Quality and Productivity Lab.
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
© 2001 Six Sigma Academy © 2003 Six Sigma Academy1 Champion Workshop Key Concepts.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Lean Production and the Just-in-Time Philosophy. Lean Production Elimination of All Waste – Waste is Anything that Does Not Add Value to Product. Continuous.
Operations Management $100 Production Method Cost and Revenue Quality Assurance Location Production Planning $200 $300 $400 $500 $400 $300 $200 $100 $500.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
1 Lean Office - Pull Kanban, Just in Time, Standardized Work
Lean Production.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
BUAD306 Lean Operations. A flexible system of operation that uses considerably less resources than a traditional system Tend to achieve Greater productivity.
1 © 2004 Superfactory™. All Rights Reserved. Lean Manufacturing Overview Superfactory Excellence Program™
1 Lean Manufacturing Overview Lean Manufacturing Overview
Standard Work (Sample Slides) Superfactory Manufacturing Excellence Series Lean Overview 5S & Visual Factory Cellular Manufacturing Jidoka Kaizen Poka.
Lean Manufacturing TT4290 L4S2. History of Manufacturing (1) Craft Manufacturing (2) Mass Manufacturing (3) Lean Manufacturing.
1 Observation of best / better practices The followings are “Some” of the best/better practices observed in the plant tour; Systems- House Lean to evaluate.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
Kanban. What is Kanban Kanban means many things. Literally, Kanban is a Japanese word that means "visual card". At Toyota, Kanban is the term used for.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
JIT/Lean Production Chapter 13.
Mel Wendell – Mountain Pointe High School
Your own footer Your Logo.
PROCESS APPROACH Nancy.
Process-Flow Analysis
Pull Manufacturing and Just In Time
Just-In-Time and Lean Production
Value Stream Mapping GEOP 4316.
IENG 451 / 452 Standardized Work: TAKT Time, Standardized Work Charts
Future State Improve Kaizen Facilitation.
Productivity Improvement.
Process Improvement Strategies Takt Time Future State Value Stream Map
L Maximizing Resources: Applying Lean Six Sigma Principles to Your Print Operation Monday March 18, AM – 12 PM.
Presentation transcript:

LeanSigma ® Facilitator Training Module 9 – Just in Time

Topics Just in Time Toyota Production System……………………………………………………..4 Continuous flow……………………………………………………………….7 – 10 Takt time……………………………………………………………………….11 – 18 Pull systems…………………………………………………………………

Lean Sigma has six steps to optimize processes. 3

Toyota developed a framework to house Lean principles – The Toyota Production System. Just-In-Time Principles Eliminate waste Establish Continuous Flow Operate to Takt Time (Pace) Leverage a Pull System / Kanban Process Smoothing 5S Capacity & Demand management Standard work Jidoka “Built in” Quality Root Cause Identification and Elimination (Abnormality Management) Mistake Proofing 4 Principles of LeanSigma ® Just in Time Just in Time Jidoka Process Smoothing Just in Time Just in Time Jidoka Process Smoothing Without all the elements, the house falls!

In this module, we’ll finish talking about Just- in-time principles. Just-In-Time Principles Eliminate waste (TIM WOOD) Establish Continuous Flow Operate to Takt Time (Pace) Leverage a Pull System /Kanban 5 Principles of LeanSigma ® Just in Time Just in Time Jidoka Process Smoothing Just in Time Just in Time Jidoka Process Smoothing

When you start removing wastes in a process, more issues become visible. 6 “Now You See It!” Most kaizens find the TIM WOOD wastes, but look further!

Continuous flow - uninterrupted movement Analyzing the flow of work: −Highlights any delays, breakdowns or bottlenecks −Leads to the reduction of end-to-end lead time −Facilitates standardized processes The IDEAL state is single item continuous flow performed by a minimum number of resources. 7 Just-In-Time Principles Eliminate waste (TIM WOOD) Establish Continuous Flow Operate to Takt Time (Pace) Leverage a Pull system / Kanban

Batch processes complete a group of items in one activity before passing it to the next activity. 8 Open Mail Batch Invoices Calculate Batch Total Enter Batch Stack and hold Voucher File Batch The client must wait longer to get a finished product.

One piece flow passes a completed item to the next activity immediately. 9 Open one envelope Enter one envelope File one The customer doesn’t wait as long for the process to complete because there is less waiting between the steps. Paper folding video

The most efficient method has one worker using single piece flow to do all the steps. 10 Open one envelope Enter Data File one invoice Using one worker to do all the steps avoids the waste of passing work from one person to another. However, some activities are specialized and can’t be done by everyone! In kaizens (and EZ Money), try expanding people’s roles to improve productivity.

Takt Time paces work to customer demand. The tempo sets the pace of any operation to match customer demand. The tempo of any operation is “Takt Time.” Can be compared to the conductor of an orchestra. 11 Takt time = Pace Just-In-Time Principles Eliminate waste (TIM WOOD) Establish Continuous Flow Operate to Takt Time (Pace) Leverage a Pull system Kanban Visa cafeteria video

Takt Time is calculated based on available time and demand. 12 Takt Time = Customer Requirements / Period* Net Operating Time / Period* *Time periods must be consistent (shift, day, week... )

Takt Time Example 13 For 1 shift / day: Takt Time = Customer Requirements / Period Net Operating Time / Period Takt Time = Items / day ÷ 20 # Working days/month Requirements: 9600Monthly requirements (items) Customer Cleanup: 5 minutes Breaks: 10 minutes Time Per Day: 480Shift: 480 minutes (1 shift/day) Net Operating Net operating time per day

Lead Time vs. Cycle Time Review 14 Lead TimeAssociate Cycle Time The time from the beginning of the transaction with the customer until the completion of the service The time it takes an associate to complete their portion of the process

Takt Time vs. Cycle Time Bar Chart is a basic tool for matching capacity to demand. Visually contrast staff cycle time and takt time (pace needed to meet customer demand) for a service Determine the proper number of staff for a service Visually display work load balance 15

The bar chart shows visually when cycle time exceeds takt time. 16 Time Employee ABCDEFGHIJKL Takt Time = 25 min  Cycle Times = 75 min # Staff =  Cycle Times Takt Time Employee B’s cycle time is longer than Takt time, so you won’t keep pace with customer demand. What could you do?

EZ Money – Let’s create a Takt time – cycle time bar chart for EZ Money. 17 Time Employee ABCDEFGHIJKL Takt Time = 25 min  Cycle Times = 75 min # Staff =  Cycle Times Takt Time What is the takt time for EZ Money? Hint: Average demand = 6 applications per day; 1 day = 5 min. or 300 seconds How many staff were needed at EZ Money before we began re-engineering the process?

EZ Money Cycle times Average Cycle times: −Sales: 78 sec. −Admin: 114 sec. −Data Entry: 35 sec. −Finance: 60 sec. −Accounting: 34 sec. −Training scheduler: 75 sec. −Ordering: 46 sec. 18

The objective of a Pull System is to deliver what the customer wants on demand at minimum costs. Overproducing is doing it faster than the customer needs it. Underproducing means the customer won’t get what they need when they need it. 19 Pull Systems satisfy customer demand with minimum effort. Just-In-Time Principles Eliminate waste (TIM WOOD) Establish Continuous Flow Operate to Takt Time (Pace) Leverage a Pull system / Kanban Orange juice video

Pull systems supply output just as the customer needs it. Dependent on a few simple rules – not on brute force, elaborate systems or expensive technology. Should be self-regulating and naturally adapts to schedule changes. There are clear “customer- supplier” linkages throughout the process. It is visual – not hidden in notebooks, files, computers, etc. 20 Predicting customer demand is critical to the pull system.

Kanban signals are visual cues that more output is needed in the pull system. Kanban is a pull system: - A visual signal that it’s time to replenish supplies or finished goods based on expected demand Examples: −Pizza dough has a short life span – it needs time to rise but quickly goes bad. By estimating demand by day of week and time of day, a pizza restaurant placed a flag on the dough racks indicating it was time to make more dough. −When UPC codes are scanned at Walmart, it sends a message to the storage room to put more product on the shelves. 21

Back to EZ Money… Work in your team to re-engineer EZ Money In addition to waste reduction, consider: −Optimizing flow −Pacing your process to customer demand (6 application in a 5 minute day) −How many employees do you need in your new process? Don’t make any significant changes to technology. −You still need to do data entry. −You cannot assume that applications now come electronically. 22