Observations on the Loss of the Challenger Observations o Engineering processes (the decision- making process to arrive at the launch decision) need.

Slides:



Advertisements
Similar presentations
“Students” t-test.
Advertisements

Relevant Costs for Decision Making
P.V. VISWANATH FOR A FIRST COURSE IN FINANCE 1. 2 Decision Criteria NPV The Payback Rule Accounting Rate of Return IRR Mutually Exclusive Projects The.
Michael Davis Article PowerPoint Lecture Prepared by Christy Moore
Introduction to Engineering Ethics – 2 Engineering Ethics Agenda Review Ethics I Introduce resources for ethical decisions in engineering References Challenger.
Decision Errors and Power
Space Shuttle Challenger Disaster
The Normalization of Deviance at NASA. Background January 28, 1986 Shuttle engineers were worried about launching at the predicted temperature of 31 degrees.
Three Ethical Case Studies
COURSE: JUST 3900 INTRODUCTORY STATISTICS FOR CRIMINAL JUSTICE Instructor: Dr. John J. Kerbs, Associate Professor Joint Ph.D. in Social Work and Sociology.
Analyzing and Presenting Results Establishing a User Orientation Alfred Kobsa University of California, Irvine.
Introduction to the Ethics of Engineering Introduction to Mechanical Engineering The University of Texas-Pan American College of Science and Engineering.
Engineering Economic Analysis Canadian Edition
Faiz Almansour Alemu Azanaw Rachel Downen Timothy Herbig Angie Schneider.
An Accident Rooted in History NASA Culture History of the flawed joint Events leading up to the disaster.
Comprehend the Challenger accident Comprehend the Columbia accident The Space Shuttle Program: Challenger and Columbia Accidents.
Chapter 7: Risk, Safety and Liability in Engineering
The Challenger Disaster
Observations on the Loss of the Challenger Observations o Engineering processes (the decision- making process to arrive at the launch decision) need.
Roger Boisjoly and the Challenger Disaster
Notes on Challenger DisasterChallenger Disaster Stephen Scott March 12, 2003.
The Challenger Accident Magnus Jansson, Electrical Engineering Fredrik Mannesson, Engineering and Industrial Management Per Martinell, Civil Engineering.
Engineers as Employees and Managers-2 Observation on the loss of the Challenger Critical and Uncritical Loyalty Responsible Organizational Disobedience.
ACCIDENT INVESTIGATION
Chapter 11: Follow-up Reviews and Audit Evaluation ACCT620 Internal Auditing Otto Chang Professor of Accounting.
Project Closure CHAPTER FOURTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
SPACECRAFT ACCIDENTS: EXAMINING THE PAST, IMPROVING THE FUTURE Overview and Challenger Case Study Bryan Palaszewski working with the Digital Learning Network.
Describe how the Supreme Court has power over the other branches of government through the process of checks and balances. Warm-Up.
Math 478 / 568: Actuarial Modeling
Part 2 Ethics and Technology.
Copyright © Cengage Learning. All rights reserved. 8 Tests of Hypotheses Based on a Single Sample.
COMMON CORE Argument Paragraph Writing Unit Grade 7.
Portfolio Management Lecture: 26 Course Code: MBF702.
COMPLEX PROBLEMS CLASS 6
1 Level of Significance α is a predetermined value by convention usually 0.05 α = 0.05 corresponds to the 95% confidence level We are accepting the risk.
A2 Business Studies Objectives and Strategy –Unit 6 Decision Trees.
Fundamentals of Data Analysis Lecture 4 Testing of statistical hypotheses.
Unit 4 vocabulary/ page 44 L.1/ What caused the explosion? 1F. Dwaikat.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Fundamentals of Data Analysis Lecture 9 Management of data sets and improving the precision of measurement.
Differences and similarities with informal and formal reports
Memorandum Memorandum. How to write memo? How to write memo? General Information About Memos: General Information About Memos: Audience and Purpose: Audience.
Ethics and Engineering Presented By: Jeff Smith Greg Thurston Allen Taylor.
1 Chapter 10: Introduction to Inference. 2 Inference Inference is the statistical process by which we use information collected from a sample to infer.
10.1: Confidence Intervals Falls under the topic of “Inference.” Inference means we are attempting to answer the question, “How good is our answer?” Mathematically:
Where We Are Now 14–2. Where We Are Now 14–2 Major Tasks of Project Closure Evaluate if the project delivered the expected benefits to all stakeholders.
MATH 2400 Ch. 15 Notes.
Diffusion of innovations September 9, Diffusion of Innovations Rogers, E. M. (2003). Diffusion of innovations (5th edition). New York, NY: Free.
Facilitate Group Learning
Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 Topic 11 Executing & Controlling Projects.
The Eternal Frontier By Louis L’Amour.
Inferential statistics by example Maarten Buis Monday 2 January 2005.
ECS 3390University of Texas at Dallas1 Activity: Final Reflection Memorandum & Portfolio Click on the audio symbol below to begin.
UNIT- III. ENGINEERING AS SOCIAL EXPERIMENTATION.
Version 1.0 Copyright © 2008 AQA and its licensors. All rights reserved. A2 Unit 4B Issue Evaluation Exercise Y
Ethics in Sports and Physical Education: A Source of Role Conflict.
Observations History vs. Today Cyber Cultures & Breaking Down Media Generated Stereotypes Action.
By Lars, Kas, Jip and Wessel. Content  Specifications current Space Shuttle  Problems about the Space Shuttle  Solutions for the Space Shuttle  Our.
HU113: Technical Report Writing
Dr. Elizabeth Hoppe Lewis University June Overview of Ethics Deontology (ethics based on duty or obligation) Immanuel Kant ( ) Focus on.
For more course tutorials visit
DEGRADED MODES OF OPERATION: ANTECEDENTS FOR RAILWAY ACCIDENTS
Space Shuttle
Elements of Argument The Toulmin Model.
COMMUNICATION AND ETHICS IN ORGANIZATIONS
Chapter 3: The Project Management Process Groups: A Case Study
BUS 630 HOMEWORK Education for Service--bus630homework.com.
Standards and Certification Training
Technical English Welcome .
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Presentation transcript:

Observations on the Loss of the Challenger

Observations o Engineering processes (the decision- making process to arrive at the launch decision) need continuous review. o Learn to recognize when external pressures or conflicting interests (profits, prestige,…) cause deviations from usual engineering processes.

Observations o Be wary of incrementally increasing risks by normalization of deviance. o Learn to recognize, and be especially cautious in the operation of, tightly coupled and complexly interactive engineering systems. o Learn to differentiate between Primary Engineering Decisions (PED) and Primary Management Decisions (PMD)

Normalization of Deviance o When 1977 tests indicates some joint opening, contrary to joint designers’ expectations, a sealing putty “fix” was added, and the anomaly was considered an “acceptable risk”. o When a 1981 launch resulted in blow-by through the putty, this anomaly was explained as a result of improperly applied putty. o When 1984 and 1985 launches caused more leakage, this leakage had come to be expected, and acceptable.

Normalization of Deviance o If the initial seal designers were asked whether any leakage through the seal was acceptable, they probably would have not accepted any leakage. o Every instance of gas blow-by was contrary to the initial seal designers’ expectations and, yet came to be acceptable, almost expected. A “fix”, not a redesign, was always the remedy. o Deviations from initially expected behavior should always be reexamined very carefully.

Tightly Coupled & Complexly Interactive Systems o Processes are said to be tightly coupled when one process can rapidly affect another process. o Processes are said to be complexly interactive when they interact in unanticipated ways. o Risk is more difficult to estimate in tightly coupled and complexly interactive processes. o The solid booster seals and the shuttle fuel storage/delivery system are an example of a tightly coupled and complexly interactive system.

The Effects of Low Ambient Temperature o The low ambient temperature was a concern during launch review. o The critical interaction between low temperature and seal behavior was not foreseen (complexly coupled behavior). o Launch was approved in spite of the concerns about low temperature because no data existed to indicate a hazard (normalizing deviance). (No data existed to confirm the safety!--review the purpose of the pre-launch engineering process!)

Writing Assignment 1 Persuasive Writing Exercise

o You are asked to take the position of Morton Thiokol engineer Roger Boisjoly after he learns his recommendation against launching of the Shuttle Columbia has been rejected. The rejection is not final, however, as your verbal arguments have been successful in delaying Morton Thiokol’s final launch decision until the next morning. You are asked to prepare, overnight, a short (maximum two pages, double spaced) executive summary of the reasons for your recommendation against a launch decision. Prepare this in the form of a memorandum addressed to Mr. Robert Lund, P.E., Vice-President of Engineering, Morton Thiokol. (The memo will carry your name, not Mr. Boisjoly’s name.) o This assignment is due Friday, Sept. 19, at recitation.