The CEOS Constellations Status and Way Forward SIT-19 19 September 2006.

Slides:



Advertisements
Similar presentations
The CEOS Constellations CEOS IP Task Force SIT-18, 21 March 2006.
Advertisements

Slide 1 WGISS CEOS WGISS 22, Annapolis September 2006 WGISS – GEO Discussion.
© GEO Secretariat Agenda Item 3. GEO UPDATE. © GEO Secretariat Membership 67 members and 43 Participating Organisations – New Members:Latvia, Moldova,
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
© GEO Secretariat Virtual Constellations..new planning process which takes account of international users and their requirements from the outset of satellite.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
© GEO Secretariat The Group on Earth Observations – Status and Post 2015 Osamu Ochiai GEO Secretariat 41 st CGMS Tsukuba, Japan 8-12 July 2013.
Slide 1 WGISS CEOS WGISS 21, Budapest 8-12 May 2006 Report on Report on CEOS Plenary (Nov. 2005) Ivan PETITEVILLE.
25th CEOS Plenary | Lucca, Italy| 8-9 November 2011 CEOS Executive Officers Report Agenda Item 17 Timothy Stryker CEOS Executive Officer Kerry Ann Sawyer.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
WGClimate Work Plan for John Bates, Chair WGClimate 4th Working Group on Climate Meeting.
SIT-27 Meeting La Jolla, CA, USA March 26-28, CEOS participation in GEOGLAM Timothy Stryker CEOS Executive Officer Yves Crevier Canadian Space Agency.
CEOS Three-Year Work Plans and Kerry Ann Sawyer CEOS Executive Officer (NOAA) CEOS Plenary, Agenda Item 6 Tromsø, Norway October.
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 Virtual Constellations (DA-07-03) I.Petiteville, CEOS GEO ADC Co-Chairs Meeting, USGS,
6. Strategic Plan : Implementing GEOSS Validating the way forward: Review of feedback from Plenary.
© GEO Secretariat 5.2 Monitoring and Evaluation John Adamec Co-Chair, M&E Working Group GEO-XI Plenary November 2014 Geneva, Switzerland.
GEO Implementation Plan 2025 Barbara Ryan & Espen Volden GEO Secretariat SIT Workshop Agenda Item 15 CEOS SIT Technical Workshop CNES, Montpellier, France.
Presentation to the 26 th CEOS Plenary at Bengaluru, India October, 2012 CEOS Response to the Updated GCOS IP & Satellite Supplement Mitch Goldberg.
WGClimate John Bates NOAA SIT Workshop Agenda Item #8 WGClimate Work Plan progress & Issues CEOS SIT Technical Workshop CNES, Montpellier, France 17 th.
Anticipated Outcomes from CEOS WGs in 2010 Strategic Discussion on what the WGs should seek to achieve 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Slide: 1 CEOS SDCG-3 Meeting|Sydney, Australia| 7-9 February 2013 Space Data Coordination Group Land Surface Imaging Virtual Constellation Ake Rosenqvist,
ARF Strategic Guidance Technical Working Group: Current Status of Initiative ASEAN Regional Forum Statement on disaster management and Emergency Response.
CEOS Working Group on Education, Training and Capacity Building (WGEdu) Report to Plenary 2009 Gordon Bridge, outgoing Chair 1 23 rd CEOS Plenary I Phuket,
CEO Team SEO SIT Technical Workshop 25 – Agenda #16 EUMETSAT 17 th to 18 th September 2015 Committee on Earth Observation Satellites CEOS in the future.
© GEO Secretariat Work Plan Guidance document 2 nd Capacity Building Committee Meeting, Brussels September 2006.
CEOS Publications & Outreach 1) Newsletter and Brochure 2) CEOS High Profile Doucment CEOS Plenary Doc. 29 Satoko Miura Pakorn Apapant 1 23 rd CEOS Plenary.
Draft GEO Framework, Chapter 6 “Architecture” Architecture Subgroup / Group on Earth Observations Presented by Ivan DeLoatch (US) Subgroup Co-Chair Earth.
Overview of CEOS Virtual Constellations Andrew Mitchell NASA CEOS SIT Team / WGISS NASA ESRIN – Frascati, Italy September 20, 2013 GEOSS Vision and Architecture.
SDCG-6 Oslo, Norway October 22-24, 2014 SDCG 3-Year Work Plan Stephen Ward, SDCG EXEC (Australia) SDCG-6: Oslo,
Overview of CEOS Actions in Support of GEO Work Plan Ivan Petiteville CEO ESA 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November2009.
The CEOS Carbon Task Force Report SIT th – 28 th March 2012, La Jolla Takashi Moriyama (JAXA) & Diane Wickland (NASA) Carbon Task Force Co-Chairs.
CEOS Priorities for 2013 Agenda 3 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
GEO ADC meeting, Washington DC, USA, Sep Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC,
CEOS-CGMS Working Group on Climate John Bates NOAA/NESDIS/NCEI SIT Workshop Agenda Item 7 CEOS Action / Work Plan Reference CEOS SIT Technical Workshop.
WGISS and GEO Activities Kathy Fontaine NASA March 13, 2007 eGY Boulder, CO.
Slide: 1 CEOS SIT Technical Workshop |Caltech, Pasadena, California, USA| September 2013 CEOS Work Plan Section 6.1 G Dyke CEOS ad hoc Working Group.
ATT Contribution to GEO Archive Task Team WGISS – 22 Sep 11 – 15, 2006 Annapolis, USA.
GEO Standards and Interoperability Forum SIF First Organizational Meeting 27 July 2007 Barcelona, Spain.
The Data Sharing Working Group 24 th meeting of the GEO Executive Committee Geneva, Switzerland March 2012 Report of the Data Sharing Working Group.
Page 1 WGISS Response to GEO/CEOS-SIT WGISS-22 Updates Ken McDonald WGISS/Vice-Chair.
Committee on Earth Observation Satellites CEO Team 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November 2015 CEOS and GEO.
2010/11 SIT Chair Vision and Goals Makoto Kajii Japan Aerospace Exploration Agency 1 The 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009.
Committee on Earth Observation Satellites CEO Team Plenary Agenda Item #13b 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6.
GEO Work Programme 2016 WGISS#40 HARWELL (UKSA) 28 SEP - 02 OCT 2015 MIRKO ALBANI, ESA.
Land Surface Imaging VC: Terms of Reference Julio Dalge, P.G. Diwakar, John Faundeen INPE ISRO USGS CEOS SIT-28 Meeting Hampton, Virginia, USA March 12,
GEO ADC meeting, Tokyo, Japan, May 2007 Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Tokyo, Japan,
CGMS-42 CEOS-CGMS WP-01 V1, 11 May 2014 Coordination Group for Meteorological Satellites - CGMS Status report by the CEOS-CGMS Joint Working Group on Climate.
Information on a potential CEOS Sea Surface Temperature Virtual Constellation (SST-VC) Craig Donlon (ESA) Kenneth S. Casey (NOAA) CEOS Plenary, Rio De.
Report from GEO Post-2015 WG and GEO Ministerial WG D. Brent Smith, NOAA CEOS Representative CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Report on SBSTA-43 John Bates NOAA, National Centers for Environmental Information (NCEI) NOAA/NESDIS 6th Working Group on Climate Meeting.
Committee on Earth Observation Satellites CEO Team Plenary Agenda Item #4 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November.
Incoming Themes for 2017 Frank Kelly, USGS
GEOSS Data Sharing Principles
Title Goes Here Name (s), Organization, CEOS Affiliation CEOS SIT-33
Committee on Earth Observation Satellites
Title Goes Here Name (s), Organization, CEOS Affiliation CEOS SIT-33
Return to First Principles
International Financing Institutions (IFI) Engagement
Committee on Earth Observation Satellites
Workshop outcomes from the CEOS perspective
Discussion Virtual Constellations
CEOS Virtual Constellations Process Paper
SIT-31 Sessions CEOS SIT Chair Team ESA/ESRIN, Frascati, Italy
VC Title Goes Here Name (s), Organization, CEOS Affiliation
WG Title Goes Here Name (s), Organization, CEOS Affiliation
CEOS Working Group on Climate (WGClimate)
Virtual Constellation Leadership Rotation
CEOS Analysis Ready Data Strategy
Virtual Constellation Leadership Rotation
Presentation transcript:

The CEOS Constellations Status and Way Forward SIT September 2006

2 SIT-19 – La Jolla – September, 2006 A New Planning Process The CEOS Virtual Constellations Concept Paper and Presentation was proposed to Principals at SIT-18 as the basis of the “..new planning process which takes account of international users and their requirements from the outset of satellite projects..” as called for by the CEOS Task Force Report of 2005 Widely endorsed by Principals who encouraged further development of the idea –CEOS Virtual Constellations already features in the GEO WP as task AR-07-P3

3 SIT-19 – La Jolla – September, 2006 Seeking realism in co-ordination.. National/regional observing requirements will continue to dominate space agency spending CEOS IP can at best seek synergies where agency programmes can also contribute to satisfying certain GEOSS requirements CEOS should provide guidelines and standards to allow agencies to determine from the outset whether and to what extent this can be achieved (and to encourage compliance) CEOS Constellations is an approach for development of these standards and for securing resources from space agencies for their implementation via the CEOS framework (or others as necessary!)

4 SIT-19 – La Jolla – September, 2006 The CEOS Constellations Concept EO programmes are driven by a variety of national/regional needs and capacities –It has proven extremely difficult to obtain long term commitments aimed at harmonisation of observations in the countries and regions covered by CEOS. –Partly due to lack of a clear and common statement of need from the target user communities (notable exceptions include meteorology and defence) Lack of common requirements has meant that continuity of supply and consistency of technical performance and application of observations have not been systematic, but rather ad-hoc – although some instances of both intended and fortuitous continuity of observations have emerged over the last decades The mechanism of the ‘CEOS Virtual Constellations’ is proposed as the basis for a process aimed at addressing these shortcomings in the international planning process for space-based Earth observations without eroding the independence of individual agencies.

5 SIT-19 – La Jolla – September, 2006 The Basic Idea 1) To extract from the target user communities, a clear and common statement of requirements (consistent with GEOSS requirements) 2) To define a series of ‘virtual satellite constellations’ to satisfy these requirements –Each constellation the focus for the planning and coordination by CEOS agencies individually and collectively –Each definition a guide to all agencies as to the characteristics of the space and ground segment for their mission which would best satisfy the needs of the agreed users; –CEOS IP structured around these CEOS Constellations - each aimed at satisfying a major grouping of requirements from the GEOSS IP

6 SIT-19 – La Jolla – September, 2006 The Basic Idea 3) At the heart of the application of the Constellations concept is the definition of a series of standards – required to be satisfied for any mission to be included in the constellation – and a process of recognition/acceptance, whereby an agency applies to CEOS to have one or more of its missions (ideally from the outset of planning) recognised as meeting the constellation standards and thereby satisfying the relevant user community needs –Standards and recognition/acceptance process could be embedded within the activities of SIT using the kind of peer review system, of both space agencies and user groups, employed in the IGOS Partnership –The “recognition” process is not an evaluation of the mission as such, but only its appropriateness within the context of the constellation –Standards cover data access/data policy as well as technical issues

7 SIT-19 – La Jolla – September, 2006 Rationale CEOS Task Force report to London Plenary (endorsed): At 19th CEOS Plenary, CEOS Members and Associates should agree a statement of support for CEOS, supplemented by an outline of the next steps for CEOS in relation to GEO. This statement will suggest that CEOS be recognised as a primary source of space- borne Earth observations for GEO, and should be circulated widely including to GEO SEC, GEO Director, and national/ regional points of contact to GEO. CEOS needs a new process to inspire and manage the cooperation necessary to fulfil the role required by space agencies CEOS efforts need to be more specific. Agencies find it easier to support and engage on topics recognised as their own priorities. The standards approach allows agencies of all sizes to plan a contribution of global value in their chosen domain. –minimum guidelines for maximum impact –‘climate compliant’ an obvious target - FCDRs

8 SIT-19 – La Jolla – September, 2006 Progress since SIT-18 Initiated a parallel approach to development of: –Prototype Constellation Studies – to learn by example and fast-track some implementation wins aimed at addressing major GEOSS needs –A CEOS Virtual Constellations Process Paper Prototype studies: –Atmospheric Composition (NASA) –Precipitation (JAXA/NASA) –Ocean Surface Topography (NOAA/EUMETSAT) –Land Surface Imaging (USGS) Scoping papers requested for SIT-19 –Objectives: what can be achieved and how –Participation –Time period, approach etc

9 SIT-19 – La Jolla – September, 2006 The Constellations Process Paper IP Task Force agreed that a Process Paper was required to: –Define how to move from the Constellations concept to implementation –Define the framework, calendar, inputs and outputs –Provide guidance to study teams on approach –Reference document providing corporate memory –Based on the model of the IGOS Theme Process Paper Briefest draft developed for SIT-19 –Higher priority after SIT-19 –First full draft in time for CEOS Plenary –Principals asked to nominate volunteers – to ensure ownership of the resulting document

10 SIT-19 – La Jolla – September, 2006 Prototype Constellations Presentations at SIT-19 – checklist for discussion: –What is the value added? The major outcomes? Including in addressing key GEOSS needs Timetable – including GEO Summit –Is there a clear and common statement of requirements validated by the recognised user communities? –Who needs to be involved to ensure success? –What are the key points of agreement? What standards or thresholds are crucial to allow ‘open’ participation by space agencies? –Are the key agencies willing to resource further development of the Constellation?

11 SIT-19 – La Jolla – September, 2006 Way Forward on the Constellations 1. SIT Chair to direct rapid development of the Constellations Process Paper – ideally with a full first draft for CEOS Plenary 2. Further development of the 4 prototypes – incorporating feedback and guidance from the SIT-19 meeting: Confirmation of resources from participating agencies Timetables developed to adapt to the 2007 CEOS/GEO Calendar Deadline for draft reports? Engagement of key agencies not yet participating Update GEOSEC on progress 3. Consider further candidates for Constellation studies & Leads ?