GIST 19: GGSPS Planning GGSPS Development & Review Planning Andy Smith GGSPS software project manager.

Slides:



Advertisements
Similar presentations
Ch-2 Proposals and Contracts. Introduction Many issues have to be handled in a contract and a proposal including legal concerns, commercial arrangements.
Advertisements

Preserving Cloud Information Bruce R. Barkstrom & John J. Bates NCDC.
Software Testing. Overview Definition of Software Testing Problems with Testing Benefits of Testing Effective Methods for Testing.
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
Release & Deployment ITIL Version 3
Presenter: Shant Mandossian EFFECTIVE TESTING OF HEALTHCARE SIMULATION SOFTWARE.
Building a Mutually Rewarding Partnership [Your Company Name]’s Commitment to Delivering Unequaled Value to [Client Name] (Replace with client logo)
Highways and Engineering Savings and Efficiencies Review November 2010.
Plans for interim data release J E Russell (Imperial)
Software Testing Lifecycle Practice
1 Software Testing (Part-II) Lecture Software Testing Software Testing is the process of finding the bugs in a software. It helps in Verifying and.
Chapter 2 The process Process, Methods, and Tools
GERB2-GERB 1 transition: discussion item J E Russell Imperial College, London
Resources Performance time. resources Performance time 2.
Information System Design IT60105 Lecture 21 Staff Organization, Risk Management and Software Configuration Management.
1 ANASAC Meeting – May 20, 2015 ALMA Pipeline Brian Glendenning (for Jeff Kern)
31 July 2014 Copyright © 2014 Colin Hood Systems Engineering -1- Requirements Engineering: Eliminate and Automate Colin Hood Systems Engineering Evans.
Usability Issues Documentation J. Apostolakis for Geant4 16 January 2009.
End HomeWelcome! The Software Development Process.
Software Development Software Testing. Testing Definitions There are many tests going under various names. The following is a general list to get a feel.
Lecture 3 Managing the Development Project SFDV Principles of Information Systems.
Level 1.5 Processing Issues Martin Bates RAL. Level 1.5 Processing Issues Geolocation –Current Status –TSOL Jitter (CSOL-TSOL) correction –Longterm TSOL.
Level 1.5 Processing Updates Martin Bates, RAL GIST th December, 2005.
Applied Software Project Management
MICE Collaboration meeting (CM20) At RAL 10 – 13 Feb 2008 AFC Magnet – Status and Progress W. Lau, Oxford University.
Data Release Requirements, decisions and plans. What we need New machine Implement (and test) all proposed changes from current Provide data quality summary,
Welcome – Patient Forum 23 April 2013 Agenda – Welcome/refreshments – Presentation and Q &A – Discussion groups
Label Design Tool Management Council F2F Washington, D.C. November 29-30, 2006
TESTING LEVELS Unit Testing Integration Testing System Testing Acceptance Testing.
GIST 23 DWD, 27-29th Apr 2005 GGSPS development and operations Andy Smith RAL.
Dr. Andy Seddon Staffordshire UNIVERSITY School of Computing Systems Development Methodologies.
SSC SI Data Processing Pipeline Plans Tom Stephens USRA Information Systems Development Manager SSSC Meeting – Sept 29, 2009.
3/30/04 16:14 1 Lessons Learned CERES Data Management Presented to GIST 21 “If the 3 laws of climate are calibrate, calibrate, calibrate, then the 3 laws.
MSG, GERB calibration and data status May ‘07 J E Russell Imperial College, London
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
Barely Sufficient Portfolio Management Todd Little & Kent McDonald So many decisions, more time than we thought.
1 Computing and Communications Services ● Business Analysis and Process Re-engineering Gayleen Gray, Deputy CIO.
Level 1.5 Geolocation Martin Bates, RAL GIST th December, 2005.
The Importance of Proper Controls. 5 Network Controls Developing a secure network means developing mechanisms that reduce or eliminate the threats.
Product status and timeline Andy Smith RAL. User products The GGSPS provides user access to the following products: Level 1.5 NANRG, ARG Level 2 ARG (and.
CIWQS Review Phase II: Evaluation and Final Recommendations March 14, 2008.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 GERB Ground Segment B.C.Stewart RAL.
Science Operation Readiness Review ICESat SIPS (I-SIPS) Status N0v 30, 2001 David Hancock ICESat Science Ground System Manager
1 Transiting Exoplanet Survey Satellite Daryl Swade Archive Team Meeting June 16, 2014.
Managing Challenging Projects Presented to the class of: Dr. Jane Mackay M.J. Neely School of Business.
Advances In Software Inspection
Level 1.5 Processing Updates Martin Bates, RAL GIST th April, 2005.
03-May-2007GIST 26: Abingdon GGSPS status Andy Smith RAL.
Team Building and Motivation ITC/ILO Workshop on Decent Work for Transport Workers Oct Prepared by Victoria Munsey.
SMOS IOCP KP0, 9 December SMOS DPGS at KP0 1.Production 2.Product Quality 3.Problems Identified 4.Positives.
WEC meeting TED status and WEC timing.
Scrum CS These outstanding slides were created by Kevin Schenk, BS in Computer Science, Purdue University, 2012.
Why Metrics in Software Testing?
Validation status overivew
Software Engineering (CSI 321)
Game Design, Development, and Technology
Validation status overivew
Scrum CS These outstanding slides were created by Kevin Schenk, BS in Computer Science, Purdue University, 2012.
20th CAA/DAA Cross Calibration Meeting
Scrum CS These outstanding slides were created by Kevin Schenk, BS in Computer Science, Purdue University, 2012.
Engineering Processes
Project Management Process Groups
Amendment Invoice Task Force Progress Report
Baisc Of Software Testing
Amendment Invoice Task Force Progress Report
The Software Testing Life Cycle
APT – Planning the Next Phase & Resourcing Risk 2 Nov
Hot summary of the Fourth GSICS Users Workshop
Speaker’s Name, SAP Month 00, 2017
Presentation transcript:

GIST 19: GGSPS Planning GGSPS Development & Review Planning Andy Smith GGSPS software project manager

Overview of issues GIST 19: GGSPS planning With current funding, no effort is available for development work in the following areas: Data Re-Ordering Level 2 monthly averaging Data Re-Processing plus a number of known non-conformances New work has arisen due to unanticipated problems: geolocation stray light The above plus ramp-down of most development effort continuation of product processing development and validation leads to uncertainty over Acceptance and System Test plans

How did we get here? GIST 19: GGSPS planning Tight funding from the outset Launch delay/IMPF delay: loss of team members and background knowledge extra work to deal with SEVIRI header generation Operations: development team effort used to support commissioning and calibration urgent need to fix “real data” software problems unanticipated problems, e.g. geolocation, stray light little or no time to plan for continued development Operational experience required to determine the scope of sub- systems such as Data Re-Ordering

Data Re-Ordering GIST 19: GGSPS planning Data Re-Ordering: detect missing/corrupt data and order from UMARF (L0) documented design exists for an automated system experience shows that rate of loss of L0 data is low (~2.5%) most L0 data loss is through isolated events a minimal, manual ordering system would be sufficient? (would give us >99% L0 coverage for May-Aug sample period)

Data Re-Processing GIST 19: GGSPS planning Data Re-Processing: ability to perform bulk reprocessing of the entire data set with improved algorithms or calibration generation of a consistent archive of science products development work was delayed from the outset - low priority pre- launch no formal design exists at present builds strongly on the finalised NRT processing software

L2 monthly averaging GIST 19: GGSPS planning Level 2 monthly averaging averaging of L2 flux products into monthly and “monthly 15- minute binned” products documented design exists requires a change of RMIB L2 products archived by GGSPS?

Reviews: background GIST 19: GGSPS planning The planned “end point” of GGSPS software development is the Acceptance Test and Review AT is validation of the software against User Requirements GGSPS was reviewed in July 2002: - based on Release 2 System Test Following further development, Release 3 System Test took place in November 2003 Release 3 was the operational system for “first light” data “OR3” development has seen further changes to the Operational Release 3 system.

Current position Most software development activity stops in Oct unless further funding is found Product validation and Product Processing software development continues into 2004 Do we need a further review? If so, when? Review now, but exclude product validation? Wait until validation complete? (Most GGSPS staff unavailable) Several large areas of development require waivers - Data Re-Ordering, - L2 averaging, - Data Re-Processing, - plus known software problems that will not be tackled GIST 19: GGSPS planning

Review options Existing System Tests have been done against URs: - no need for specific Acceptance Test activity? - base an Acceptance Review on a System Test Report Options available IF a review is required now… Option 1: OR3 System Test and Review - little or no effort available to carry out testing (trade-off against further development) - “wrong” effort available: Test Leader no longer funded Option 2: Release 3 “delta” review - Release 3 Test Report is in preparation - review the R3 report plus work since: NCRs fixed etc. N.B. Acceptance should be driven by the customer GIST 19: GGSPS planning

Summary GIST 19: GGSPS planning Additional funding is needed to develop Data Re-Ordering L2 Monthly Means Data Re-Processing Geolocation fix Stray light fix (?) and to address some known software problems (NCRs) If we don’t get extra funding, we need to consider how to handle Acceptance