Demonstration of Autonomous Rendezvous Technology (DART)

Slides:



Advertisements
Similar presentations
Lunar Landing GN&C and Trajectory Design Go For Lunar Landing: From Terminal Descent to Touchdown Conference Panel 4: GN&C Ron Sostaric / NASA JSC March.
Advertisements

LightSail.
NASA-Unique Automated Rendezvous & Capture (AR&C) Element JSC - DM / Don Pearson.
Russian Vehicle Automated Rendezvous and Docking C. Scott Merkle NASA Johnson Space Center Aeroscience and Flight Mechanics Division 5/22-23/2002, AR&C.
Orbital Operations – 2 Rendezvous & Proximity Operations
Architecture Team Industry Day Briefing 17 January, 2002.
1 Air Launch System Project Proposal February 11, 2008 Dan Poniatowski (Team Lead) Matt Campbell Dan Cipera Pierre Dumas Boris Kaganovich Jason LaDoucer.
Aerodyne Industries, LLC Company Overview 2013.
System Identification of a Nanosatellite Structure Craig L. Stevens, Jana L. Schwartz, and Christopher D. Hall Aerospace and Ocean Engineering Virginia.
Mission Directorate Exploration Systems MSFC CD Chief S&MA Officer MSFC SMA DART Project Office (J. Snoddy) DART Contract (CPIF) 17 Mission Directorate.
Team GPS Rover Alex Waskiewicz Andrew Bousky Baird McKevitt Dan Regelson Zach Hornback.
Launch System Launch Vehicle Launch Complex Orbit Insertion Orbit Maneuvers.
Controlled Autonomous Proximity Technology with flUx pinning & Reconfiguration Experiments CAPTURE: David Bayard, Laura Jones, and Swati Mohan Jet Propulsion.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
1 Project Name Solar Sail Project Proposal February 7, 2007 Megan Williams (Team Lead) Eric Blake Jon Braam Raymond Haremza Michael Hiti Kory Jenkins Daniel.
→ Potential ESA- Roscosmos Cooperation in Education Activities.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
Results of NASA/DARPA Automatic Probe and Drogue Refueling Flight Test Keith Schweikhard NASA Dryden Flight Research Center
Satellites and Launch Vehicles. “Gee Whiz” Facts Number of satellites currently in orbit is over 900 Satellites orbit at altitudes from 100 miles (Low.
Technology Input Formats and Background Appendix B.
20a - 1 NASA’s Goddard Space Flight Center Attitude Control System (ACS) Eric Holmes, Code 591 Joe Garrick, Code 595 Jim Simpson, Code 596 NASA/GSFC August.
Requirements and Operations Team Industry Day Briefing 17 January, 2002.
Ground Support Network operations for the GRAS Radio Occultation Mission R. Zandbergen, the GRAS GSN team (ESOC) and the Metop GRAS team (EUMETSAT) 09/09/2011.
.1 RESEARCH & TECHNOLOGY DEVELOPMENT CENTER SYSTEM AND INFORMATION SCIENCES JHU/MIT Proprietary Titan MESSENGER Autonomy Experiment.
1 Global Tropospheric Winds Sounder (GTWS) Reference Designs Ken Miller, Mitretek Systems January 24, Jan-02.
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
Space Engineering 2 © Dr. X Wu, Space Engineering 2 Lecture 1.
Surveillance Planning Team Initial Team Meeting January 9-10 NASA Headquarters Team Introduction Revision A Tom Whitmeyer - OSMA Jeff Cullen - Procurement.
Advanced Range Technology Working Group July 2002 Contact information: Kevin Brown Vice President, Business Development Command and Control Technologies.
Space Systems Laboratory University of Maryland test.col.pp4 HERA: Hubble End-of-life Robotic Augmentation – A Robotic Alternative for SM-4 David L. Akin.
JPL LASER MAPPER (LAMP) POC Bob Bunker (Task Manager) Jet Propulsion Laboratory Inter-Agency AR&C Working Group Meeting May , 2002 Naval Research.
Space Station Will it be accessible for You and Me?
SPHERES 0-G Autonomous Rendezvous and Docking Testbed Presented To DARPA Orbital Express December 2000 MIT Space Systems Laboratory David W. Miller (617)
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
SPHERES Reconfigurable Control Allocation for Autonomous Assembly Swati Mohan, David W. Miller MIT Space Systems Laboratory AIAA Guidance, Navigation,
Network UAV C3 Stage 1 Final Briefing Timothy X Brown University of Colorado at Boulder Interdisciplinary Telecommunications Program Electrical and Computer.
NASA/Air Force Cost Model presented by Keith Smith Science Applications International Corporation 2002 SCEA National Conference June
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
1 Jet Propulsion Laboratory JPL Flight Team Adam Nikolic Josh Ruggiero Bob Hoffman Dusty Terrill.
February 2007 NASA Dryden Status Aerospace Control & Guidance Sub-committee Boulder, CO February 2007 John Bosworth (661)
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Mission Operations –Launch February 15, 2000 at 22:02:15 UTC = 14:02:15 PST –41 Days IOC and antenna deployment period –2 year science mission operations.
1 Weekly Summary Weekly Summary Formation Flight AEM4332 Spring Semester March 7,2007 Masao SHIMADA.
March /5/2016 At A Glance STARS is a real-time, distributed, multi-spacecraft simulation system for GN&C technology research and development. It.
Haripriya Head, Integration Team Pratham, IIT Bombay 19 th June, 2010.
20c - 1 NASA’s Goddard Space Flight Center Propulsion Chuck Zakrwski NASA/GSFC Code 597 August 16-17, 2005.
Melak Zebenay > EPOS- A Robotics-Based Hardware in-the-Loop Simulator for Simulating Satellite RvD Operations >Aug 30, 2010 Slide 1 Control Strategy of.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Final Version Gary Davis Robert Estes Scott Glubke Propulsion May 13-17, 2002 Micro Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF)
1 The PISCES Project Don J. Pearson JSC/DM Flight Design & Dynamics Division May 2002
ACE Science Workshop March 10 th, 2009 Armin T. Ellis, Deborah Vane, Mark Rokey Jet Propulsion Laboratory.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
1 Robonaut: A Humanoid Robotic Assistant for On-Orbit and Planetary Missions Nicolaus Radford Automation, Robotics and Simulation Division NASA/Johnson.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Millennium Engineering and Integration Company A NEW DOCUMENTATION PROCESS TO STREAMLINE RANGE SAFETY PROCEDURES 0 O. “Rusty” Powell, Allan Smith, Jeff.
Orbital Express: A New Chapter In Space
© 2012 Anwendungszentrum GmbH Oberpfaffenhofen Idea by: Dr. Eng. Mohamed Zayan | 1.
Overview 3 2 Introduction Design Analysis Fabrication Testing
Technical Resource Allocations
PROJECT METEOR: RITSAT1 P08102
SDO Flight Dynamics Subsystem
Systems Engineering Management
Launch and On-orbit Checkout
System Identification of a Nanosatellite Structure
<Your Team # > Your Team Name Here
The Deorbiting of GOCE – A Spacecraft Operations Perspective
Presentation transcript:

Demonstration of Autonomous Rendezvous Technology (DART) Inter-Agency AR&C Working Group May 22-23, 2002 Chris Calfee DART Project Manager 256-544-5788 Chris.Calfee@msfc.nasa.gov DART_NRL.ppt 5/23/02 DART_NRL.ppt

Agenda Introduction to DART Overview & Objectives Organization & Schedule DART Mission Description “Chaser” Vehicle - DART “Target” Vehicle - MUBLCOM Launch Vehicle - Pegasus Mission Operations - Flight & Ground System Test Summary Technology Readiness Levels Advanced Video Guidance Sensor (AVGS) 5/23/02 DART_NRL.ppt

Introduction to DART 5/23/02 DART_NRL.ppt

Project Overview DART Stands for: Demonstration of Autonomous Rendezvous Technology. DART Is a Flight Demonstration of the Hardware and Software Required to Autonomously Rendezvous with a Satellite (MUBLCOM) Currently in Orbit. Hardware: Advanced Video Guidance Sensor (AVGS) Heritage: VGS Developed by MSFC for Automated Rendezvous & Capture (AR&C) Project. Flown Twice on Board the Shuttle in an Open-Loop Mode AVGS is next generation system with advanced optics and electronics. Design goals: Longer Range, Lower Power and Weight Software: Based on Autonomous Rendezvous and Proximity Operations (ARPO) Algorithms Also Developed by NASA/MSFC. Both the AVGS and the ARPO Algorithms Will Become Embedded Technology on Board a Pegasus ELV, Making the DART Vehicle an Extension of the ELV Rather Than an Independent and Isolated Payload 5/23/02 DART_NRL.ppt

DART Objectives Primary Objective: Demonstrate in space Autonomous Rendezvous and Closed Loop Proximity Control Between a Chase Vehicle, DART, and a Passive, Cooperative Target Vehicle, MUBLCOM Raise AVGS/ARPO Technology Readiness Levels (TRL) from a 3/4 to a 7/8 Validate Ground Test Results of the AVGS and ARPO Algorithms Mission Objectives Transfer from parking orbit to MUBLCOM orbit Demonstrate Autonomous Proximity Operations While In the Vicinity of the Target Vehicle Using The AVGS V-Bar Approach and Stand-Off to 15 meters Collision Avoidance Maneuver (CAM) Docking Axis Approach and Stand-Off to 5 meters R-Bar Approach and Stand-Off to 50 Meters Autonomous Departure at End Of Mission 5/23/02 DART_NRL.ppt

Second Generation RLV Relevance The United States Has Successfully Performed Numerous Rendezvous and Docking Missions in the Past. The Common Element of All US Rendezvous and Docking is That the Spacecraft Have Always Been Piloted by Astronauts. Only the Russian Space Program Has Developed and Demonstrated a Routine Autonomous Capability. The European Space Agency and Japanese Are Developing Similar Technology. The DART Mission Provides a Key Step in Establishing an Autonomous Rendezvous Capability for the United States. All 2nd Generation Architectures and AAS Can Benefit From ARPO Technology. Even Manned/Piloted Vehicles Can Benefit Through Robust System Performance and Reduction of Potential Piloting Errors. 5/23/02 DART_NRL.ppt

DART Project Overview Schedule 5/23/02 DART_NRL.ppt

Project Team OSC - Overall Project Integration, Launch Vehicle Buildup & Test, AVGS Development, Test, Manufacture, & Integration, DART Buildup & Test, LV/DART Integration & Test, Launch & Mission Operations MSFC - Overall Project Management, AR&C Algorithms, AVGS S/W Development, Test Facilities & Support, Mission ops Support Draper – GNC System, Flight Vehicle S/W Advanced Optical Systems (AOS) - AVGS Design & Engineering Support KSC - Launch Services Support GSFC - IV&V 5/23/02 DART_NRL.ppt

2nd Generation RLV Organization Ext. Rqmts. Assessment Team Program Office Consultants E.G. F. Wojtalik, G. Oliver, B. Lindstrom Ext. Rqmts. Assessment Team Manager Deputy Quality Assurance Man. Chief Engineer Tech. Asst. ESA MSA Dennis Smith Dan Dumbacher C. Chesser Robert Hughes B. Morris Jill Holland Judy Dunn Procurement Procurement Legal Legal M. Stiles J. Seemann Program Planning and Control Sys. Engineering, & Integration Architecture Definition Program Integration & Risk Management Rose Allen, Manager Jerry Cook, Deputy Dale Thomas, Manager Chuck Smith, Deputy Steve Creech, Manager Danny Davis, Manager Bart Graham, Deputy Arch. Mgr. Arch. Mgr CTV AAS Bob Armstrong Charlie Dill Pete Rodriguez Steve Davis Chris Crumbly Airframe (LaRC) Operations (KSC) Flight Mechanics (MSFC) NASA Unique (JSC) Subsystems (GRC) IVHM (ARC) Manager LSE D. Bowles Julie Fowler Manager LSE Scott Huzar Manager LSE Scott Jackson Jack Mulqueen Manager LSE Dave Leestma Manager LSE Mike Skor Tom Hill Manager Asst. Mgr./LSE Bill Kahle Kevin Flynn Propulsion (MSFC) Flt. Demos & Exp. Integ. (MSFC) Manager Dep. Mgr. Lead Sys. Engr. Garry Lyles Steve Richards George Young Manager, acting Deputy Susan Turner 5/23/02 DART_NRL.ppt

Flight Demos & Experiment Integration Organization Flt. Demos & Exp. Integ. Susan Turner X-37 Jeff Sexton DART Chris Calfee Kistler K-1 Jimmy Lee 5/23/02 DART_NRL.ppt

Lead Software Engineer 2nd Generation RLV Program DART Organization DART Chris Calfee, Manager Lead Software Engineer Meg Stroud AVGS/Pegasus Lead Engineer Keith Higginbotham Asst. DART Manager Dexter Waldrep Lead Systems Engineer Mark Krome Contracts Earl Pendley Penny Battles Carol Greenwood S&MA Van Strickland Marcie Kennedy Business Jimmy Black Rich Leonard Louise Hamaker Pegasus Procurement Wanda Harding - KSC Flt. Demos & Exp. Integ. Susan Turner, Manager 2nd Generation RLV Program Dennis Smith, Manager 5/23/02 DART_NRL.ppt

OSC DART Organization Chart 5/23/02 DART_NRL.ppt

DART Mission Description 5/23/02 DART_NRL.ppt

Mission Overview Description of DART Vehicle Hydrazine Auxiliary Propulsion System (HAPS) 3 thrusters with 56.9 Kg (125 lbm) supply Delta-velocity, pitch and yaw attitude Pegasus Reaction Control System 6 nitrogen thrusters with dedicated 5.8 Kg (13 lbm) supply 3-axis attitude control during rendezvous and retirement Proximity Operations Reaction Control System 16 N2 thrusters with dedicated 29 kg (64 lbm) Tank 6-axis attitude and translational control during proximity operations Lithium Ion Battery Powered Avionics and Transient Power Busses UHF Antenna & Receiver System SIGI INS and Standalone GPS Navigation Solution Advance Video Guidance Sensor Maximum wet mass: 362.3 Kg (798 lbm) Assuming Pegasus XL launch to 500 km orbit at 97.7° inclination 5/23/02 DART_NRL.ppt

DART Mechanical Configuration Within Pegasus Stage 4 Avionics Structure is Top of HAPS Tank, Two RCS Tanks, SIGI Mostly Heritage Components and Layout for Stage 4 Within AVGS Bus Structure is Top of Proximity Ops RCS Tank Most New Components Mounted to Exterior of Cylindrical Structure, Forward AVGS Panel Pegasus Stage 4 AVGS Bus DART Expanded View Forward Looking Aft 5/23/02 DART_NRL.ppt

DART Mechanical Configuration, Cont MACH Batteries Proximity Ops RCS Tank, Tubing, Other Components HAPS Tank, Tubing, and Other Components DART Expanded View Aft Looking Forward 5/23/02 DART_NRL.ppt

Description of MUBLCOM Target Vehicle Launched in 1999 aboard a Pegasus Rocket Currently in a nearly circular orbit at 765 km Near-polar orbit with 97.7 inclination (nearly sun-synchronous) Gravity-gradient stabilized with momentum wheels for yaw control Long and short-range retroreflectors mounted ~parallel to velocity vector Far-range retroreflectors mounted along vehicle z-axis (nadir pointing) 5/23/02 DART_NRL.ppt

MUBLCOM 5/23/02 DART_NRL.ppt

Expanded View of Pegasus w/DART 5/23/02 DART_NRL.ppt

Mission Overview DART Launch Operations Overview Pegasus launch from Vandenburg AFB, CA on 4/15/04 Launch will deliver DART to a circular orbit at 500 Km altitude Ascending node and inclination matching those of the MUBLCOM satellite Hydrazine budgeted to allow Pegasus use of HAPS to correct launch dispersions ±30 second drop window assumed Minimizes ascending node errors Drop position accuracy relaxed to allow better drop time accuracy Launch opportunity every 3-5 days Phasing with MUBLCOM at launch constrained to less than 100° 5/23/02 DART_NRL.ppt

Mission Overview DART Rendezvous Operations Overview Early orbit checkout DART “catches up” to target vehicle at ~13 deg/hour Up to 7.5 hours spent in Phasing orbit 1 Hohmann transfer from 500 Km to ~755 Km altitude Rendezvous ends with DART 40 Km behind and 7.5 Km beneath MUBLCOM Rendezvous algorithms employ Pegasus PEG guidance PEG functionality extended with rendezvous phasing calculations Ascending node and inclination errors corrected during transfer using HAPS 5/23/02 DART_NRL.ppt

Mission Overview DART DRM Timeline Worst-case phasing at launch assumed 7+ hours in phasing orbit 1 Proximity operations begin 8 hours into the mission 8 hours in proximity operations Includes 3.5 hours of station keeping at various positions Retirement burn 16.5 hours into mission 7.5 hour time margin remaining 5/23/02 DART_NRL.ppt

DART Mission Profile Altitude(km) Far Range Mid Range Near Range GPS State Vector Differencing (Propagated Target State) GPS State Vector Differencing (Space-to-Space Target State) Proximity Sensor (AVGS) Communications Range (~100 km) Visible Range (~500 m) -3km 770 Target Vehicle Altitude(km) 755 Free Drift Start of Proximity Operations Orbit Transfer DART Retirement Burn Phasing 500 Launch Ascent Far Range Mid Range Near Range MET From L1011 Drop 00:09:00 08:00:00 11:00:00 16:30:00 Note: Altitude and Ranges are not to scale 5/23/02 DART_NRL.ppt

DART Proximity Operations Flight Profile Velocity Vector Orbital Motion 5 m MUBLCOM 300 m 1 Km 3 Km +VBar 50 m 15 m 100 m CAM 500 m 150 m Last HAPS Burn 40 Km behind 7.5 Km below End of Rendezvous Start of Prox Ops 300 m +RBar Baseline Profile Extended Profile Free Drift Retirement Burn Orbit Transfer 5/23/02 DART_NRL.ppt

DART-MUBLCOM Rendezvous Visual 5/23/02 DART_NRL.ppt

Mission Overview DART DRM Ground Station Coverage Three ground stations selected for telemetry coverage (VAFB for launch only) Poker Flats, Alaska McMurdo, Antarctica Svalbard, Norway Polar stations provide at least two telemetry downlink opportunities per orbit 5/23/02 DART_NRL.ppt

Psuedo Flight Code (CMDH, GN&C,Telemetry) DART Testing Desktop Simulation Performed at OSC Psuedo Flight Code (CMDH, GN&C,Telemetry) Hardware in the Loop – Static Flight Computer, GPS, INS, UHF, AVGS Hardware in the Loop – Dynamic Performed at MSFC Flight Robotics Lab Flight Computer, GPS, INS, AVGS 5/23/02 DART_NRL.ppt

Addressing SLI Program Goals: Increasing Technology Readiness Level Start: AVGS and ARPO at TRL 4 Finish: AVGS and ARPO at TRL 7/8

Addressing SLI Program Goals: ARPO Technology Readiness Levels 5/23/02 DART_NRL.ppt

Advanced Video Guidance Sensor (AVGS) 5/23/02 DART_NRL.ppt

(HEAD AND ELECTRONIC MODULE) OLD VGS SENSOR (HEAD AND ELECTRONIC MODULE) 5/23/02 DART_NRL.ppt

Proximity Sensor Comparison to Flight proven Unit +/-0.12 mm position, accuracy +/-0.10 mm/s velocity, accuracy +/-0.10 deg attitude, accuracy +/-0.30 cm position, accuracy +/-0.30 cm/s velocity, accuracy +/-0.25 deg attitude, accuracy 1-5 km range (spot mode) 300-500 m (full 6DOF) 150 m range Performance (Range & Target Specific) 8 watts power 60 watts power Single DSP board in sensor box Signal processing in separate VME Single box (20 lbs) (10” X 12” X 8”) 2 boxes (50 lbs total) Electronics 50 Hz update 5 Hz update Digital CMOS Camera (resolution 1000 X 1000) Analog Camera (resolution 640 X 480) Camera Lasers in optical path (Increased laser return) Laser not in optical path 4 lasers (reduced complexity and power) 8 lasers Optics AVGS VGS 5/23/02 DART_NRL.ppt

AVGS Functional Flow From “On-Orbit Testing of the Video Guidance Sensor” by Richard T. Howard, Thomas C Bryan, Michael L. Book, NASA/MSFC 5/23/02 DART_NRL.ppt

AVGS Design, Analysis and Test Brassboard Development Phase (6/1/01 - 1/28/02) Parts and Material Review EEE Parts Availability Outgasssing Radiation Environment Analysis Begin AVGS Software Development Evaluate Optics Performance Initial Prototype (IP) Development Phase (6/1/01 - 3/29/02) Power Supply Design Electronics Packaging Concepts Initial Structural Analysis Initial Electrical Analysis Initial Thermal Analysis Radiation Hardening Continue AVGS Software Development 5/23/02 DART_NRL.ppt

AVGS Design, Analysis and Test (Cont) Final Prototype (FP) Development Phase (4/1/02 - 10/18/02) 2 Prototype Units (Form, Fit & Function) FMEA Update Thermal Analysis Finalize Electronic Packaging Concepts Final Design for Radiation Environment Finalize Structural Analysis Finalize Electrical Analysis Begin AVGS Software functional Verification and Validation Qualification Unit Development Phase (9/23/02 - 5/29/03) Acceptance Testing (random vibe and thermal vac) Qualification Testing (EMI/EMC, Vibe, Shock, Thermal) AVGS Flight Load Software Delivery Flight Unit Development Phase (5/1/03 - 11/17/03) 3 Units Final AVGS Software Load Delivery (Jan04) 5/23/02 DART_NRL.ppt

New AVGS Initial Proto-Type Unit 5/23/02 DART_NRL.ppt

AVGS Development Breadboard Sensor Optics 5/23/02 DART_NRL.ppt

Addressing SLI Program Goals: DART-AVGS Technology Readiness Levels 5/23/02 DART_NRL.ppt

DART POP02 Summary by Center NOA $K 5/23/02 DART_NRL.ppt

Automated Rendezvous and Capture Documentation Technical Publications http://alternate.msfc.nasa.gov/AR&C/ a. Application of Neural Networks to Autonomous Rendezvous and Docking of Space Vehicles, Richard W. Dabney, AIAA Paper 92-1516, AIAA Space Programs and Technologies Conference, March 24-27, 1992, Huntsville, AL. b. United States Patent Number 5,109,345, CLOSED-LOOP AUTONOMOUS DOCKING SYSTEM, Richard W. Dabney and Richard T. Howard, April 28, 1992. c. A Plan for Spacecraft Automated Rendezvous, A. W. Deaton, J. J. Lomas, and L. D. Mullins, NASA TM-108385, October 1992. d. Guidance and Targeting Simulation for Automated Rendezvous, James J. Lomas, John M. Hanson, and M. Wade Shrader, AAS Paper 94-162, AAS/AIAA Spaceflight Mechanics Meeting, February 14 - 16, 1994, Cocoa Beach, FL. e. Guidance Schemes for Automated Terminal Rendezvous, John M. Hanson and Alva W. Deaton, AAS Paper 94-163, AAS/AIAA Spaceflight Mechanics Meeting, February 14 - 16, 1994, Cocoa Beach, FL. f. A Solution to the 3 Point Inverse Perspective Problem for Automated Rendezvous and Capture, Richard Dabney and Philip Calhoun, MSFC Memorandum ED13-94-21, September 30, 1994. g. Cargo Transfer Vehicle (CTV) Reference Design for Autonomous Rendezvous and Capture Simulations, Richard Dabney, MSFC Memorandum ED13-94-22 , October 26, 1994. h. MSFC-RQMT-2371 B, Automated Rendezvous and Capture (AR&C) System Requirements Document (SRD), Craig A. Cruzen, July 1, 1996. i. MSFC Flight Robotics Laboratory (FRL) Description, A World Class Simulation and Test Facility, Linda L. Brewster, Team Lead, Orbital Systems & Robotics Team, MSFC, November 1997. j. AR&C Ground Program System Test Plan, D. L. Kelley, Hernandez Engineering, December 19, 1997. k. MSFC Automated Rendezvous and Capture Simulation (MARCSIM) Description, Linda L. Brewster, Team Lead, Orbital Systems & Robotics Team, and Dave W. Allen, Team Lead, Simulation Software Team, MSFC, April 1998. l. Active Sensor System for Automatic Rendezvous and Docking, Richard T. Howard, Thomas C. Bryan, Michael L. Book, and John L. Jackson, Working Paper. m. Video Guidance Sensor Flight Experiment Results, Richard T. Howard, Thomas C. Bryan, and Michael L. Book, Working Paper. n. Automatic Docking System Sensor Analysis & Mission Performance, John L. Jackson, Richard T. Howard, Helen J. Cole, and Ronald A. Belz, Working Paper. 5/23/02 DART_NRL.ppt