Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.

Slides:



Advertisements
Similar presentations
Sharing of ISTS Charges & Losses Regulation
Advertisements

Open Access Pune Power Development Pvt. Ltd.. Contents:  Terminology  Open Access  Requirements for Open Access  Provisions made in Electricity Act.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
O POWER TRADING o OPEN ACCESS o CAPTIVE GENERATION BHANU BHUSHAN Director (Operations ) Power Grid Corporation of India Ltd.
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
A Partial Interim Report To WMS Guidance on Implementing Protocol Implementation Plan (PIP) 102 Reactive Power Task Force.
Wind Power in Ireland: Treatment of wind in the Single Electricity Market APEx Conference, Paris 16 th October 2007.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
C FORM. BRIEF OVERVIEW  DECLARATION IN C FORM  TYPES OF C FORM  CONTENTS OF C FORM  CST RATES  C FORM PREPARATION  PROCEDURE IN CASE OF LOSS OF.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
Module on Computation of PoC Transmission Charges
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
1. 2 ENERGY MANAGEMENT SYSTEM AN OVERVIEW AN OVERVIEW.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Billing, Collection and Disbursement Procedures
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Outline  Chronology  Conceptual framework  Salient Features of REC Mechanism  Role of Central Agency  REC Procedures  Current Status.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
Sanjay Garg General Manager PGCIL/ Ministry of Power
14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
Commercial Points for 93 rd OCC meeting. Change in Bank a/c New Account for Deviation Settlement opened in Axis Bank Name of the A/C : Power System Operation.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
Sharing of Inter-State Transmission Losses 11/29/
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI& Reactive charges Tamilnadu to pay 100Crs. as UI charges and 2Crs. as Reactive.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI & Reactive charges Tamilnadu still to pay 74Crs. as UI charges during
1 SCOPE OF THE PRESENTATION Grid operation - overview Availability Based Tariff Benefits to Region & it’s constituents Intra_state ABT – it’s necessity.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Renewable Regulatory Fund (RRF):- Implementation Mechanism
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Philippine Feed-In Tariff System Implementation 1.
Renewable Energy Act of 2008
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
Transmission Tariff V.Balaji Chief Manager SRLDC.
Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009) Order-Removal of difficulties,(28.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
MERC (N ET METERING FOR R OOF - TOP S OLAR P HOTO V OLTAIC S YSTEMS ) R EGULATIONS, 2015 Commercial Section.
Jul 23, 2003Market Operations Standing Committee of the IMO1 Market Pricing Issues Update John MacKenzie.
Workshop on Open Access in Maharashtra Nagpur 14 th May 2016 For Public Use.
ERRA Workshop on Regulatory Monitoring of the Electricity Sector Almaty, Kazakhstan, January 31 – February 2, Improvement of market relations in.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
Renewable energy support schemes in the Republic of Moldova
Open Access Power Purchase
Open Access.
Open Access.
Scheduling of Collective Transactions Through Power Exchange
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Congestion regulations
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Vietnam Power Sector Reform And Market Devvelopmentvvvv
Presentation transcript:

Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC

Regulatory Framework Eligibility Criteria Wind Farms with collective capacity of 10 MW and above. Wind Farms connected to transmission or distribution network at voltage level 33 Kv & above. Wind Farms connected to distribution network - Responsibility shall be fixed up on distribution licensee for providing online data to SLDC. Wind Farms those have not signed any PPA with states/UTs/DVC or others as on Declaration has to be submitted to SLDC

 Wind Farms shall furnish the details of contracts along with price to SLDC for onward submission to RLDC/RPC.  Special Energy Meters shall be installed by STU/discom at the cost of Wind Farm developers.  SEM shall be capable of time-differentiated measurements for 15’ time block wise active energy and voltage differentiated measurement of reactive energy.  Wind Farms shall install RTU along with communication facilities to provide visibility of generator parameters to SLDC for real time monitoring. ….Contd….

 SLDC of the States/UTs/DVC, in which the wind farm is located, shall provide the 15’ block-wise data of schedule and actual generation from wind farm as recorded in the Special Energy Meters to the concerned RLDC and NLDC on a weekly basis in prescribed form.  SLDC will be responsible to check that there is no gaming by wind generators. - Any gaming by wind generator may be identified on the basis of prolonged /continuous misdeclaration. Responsibility of SLDC

 Maharashtra state ABT mechanism is System Marginal Price based & is different from other state’s ABT mechanism.  Maharashtra state SMP based Balancing & Settlement mechanism is operational w.e.f. 1 st Aug  Difference in UI rate & SMP rate needs to be addressed. Issues…..

Wind farm selling power out side the state In order to balance the state energy pool (FBSM) the Wind Farms selling power out of the state will have to be treated as ‘State Pool Participants’ (SPP). The payments/receipts to the host state thro’ RRF and UI pool will have to be shown separately by WRPC for state’s weekly UI bill and added to ‘Net UI charges’ (block wise).

Issues….. Wind farm selling power inside the state In Maharashtra state no UI is applicable for Intra- state transactions, settlement is done on actual basis. This has been approved by the state commission. No need to treat Wind Farm as SPP A separate block wise statement of the payments/ receipts to the host state thro’ RRF will have to be issued by NLDC (not to be included in state’s UI bill). So that such adjustments can be passed on directly to the buyer in the state. Before implementation of RRF mechanism these issues needs to be addressed for participation of wind generators in Maharashtra state.

Particulars TPC-DBESTMSEDCLREL-DWindIRSLJSWAMNEPLWPCLStatePool Volume Drawl at T_D 134,356101,0362,267,660188,39723, ,24812,67862,192-2,895,487 Loss Adjusted ScheduleDrawl140,422105,5982,370,046196,90325, ,00013,25065,000684,6583,026,219 Metered Injection121,087126,8901,541,626119,510 Central Sector --752,331- Inter OA Purchase07,42216,76928,747 Inter OA Sale ,253 2,267,660 Intra OA Purchase02,300146,09048,250 2,267,660 Intra OA Sale 0000 NCER Purchase12, ,66510,000 Total Availabilty 133,587136,7762,434,152191,25522, ,32813,53065, ,439 3,026,219 Pool Imbalance -6,83531,17864,106-5,648-3, ,439 0 Imbalance Rate Rs/kWh Pool Charges 16,525-94, ,11413,6557, ,713196,8950 Discom Deviations Net UI - I Scheduled Drawl152,266127,0382,425,094196,55525, ,0972,900,952 Loss AdjustedDrawl140,422105,5982,349,126196,90322, ,00013,25065,000684,6582,980,299 Net UI - I 11,84421,44075, , Allocation -42,124-76, , , , ,399 State Generator Deviations Net UI - II Instate Scheduled Gen94,63399,1681,327,250119, ,00013,25065,000 1,828,801 Instate actual Injection96,764101,4011,259,798119, ,32813,53065,940 1,767,361 Net UI - II 2,1312,233-67, Allocation Net UI Charges -42,124-76, , , ,343 - Additional UI charges Net Pool Charges-25, , ,30713,6557, ,764-1,506-5,056591, Regional PaymentsGross UIPool UINet UICap UI Additional UI Freq Rate ,294196,895394,39998,0380

Thank You….