Gantt Charts for project management

Slides:



Advertisements
Similar presentations
Project Management Techniques and tools Move mouse over arrow to enter presentation End Show.
Advertisements

Planning PERT - Project Evaluation and Review Technique) and CPM - Critical Path Method are network analysis techniques that are commonly used in project.
By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
8-1 Scheduling Scheduling Defined Gantt Charts Network Techniques: PERT and CPM Determining Task Durations Probability and Simulation Some Examples.
Chapter 10: Project Schedule Planning
© 2008 by Prentice Hall 3-1 ITCS311 Systems Analysis and Design Dr. Taher Homeed Feb 2010 Department of Computer Science College of IT University of Bahrain.
Eleanor Roosevelt High School
Planning & Scheduling Systems: From Design to Fabrication.
1 Operations Management Lesson 5 Project Management.
2 Project Management  Management of work to develop and implement an innovation or change in an existing organization Examples: –New buildings –Weapon.
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
1. Henry Laurence Gantt, A.B., M.E. ( November 1919) was a mechanical engineer and management consultant who is most famous for developing the.
S N R E University of Michigan Announcements 1. 1.Pick project treasurer All treasurers have group meeting with Mary M. in SNRE business office soon.
Project Management March 9, 2001 Dr. Richard Chung Dept. Chemical & Materials Engineering San Jose State University.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
Microsoft Office Project 2007: Managing Projects.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
GANTT Charts. What is a GANTT chart? A Gantt chart is a type of bar chart that illustrates a project schedule. Gantt charts illustrate the start and finish.
Chapter 6 Introduction to Microsoft Project
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, All Rights Reserved Business Plug-In B15 Project Management.
Welcome to COMP1115 Business Computer Applications II Ted Snell Microsoft Project and Microsoft Access.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved. BUSINESS DRIVEN TECHNOLOGY Business Plug-In B10 Project Management.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Managing the Design Process Project must  Accomplish the goals - scope  Be done within resources - spending  Be done on time - scheduling.
EGNR 300 Project Management Planning & Scheduling ENGR 300 Dept. of Computer Science and Engineering University of Bridgeport,
Lean Project Management
Project Management: A Managerial Approach
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Chapter 17 Project Tracking. Objectives Identify, develop, and use project management tools to track project progress: Schedules Gantt Charts Toll Gate.
Project Management Software Application PRM 705 Lecture 32 1.
1 Teamwork Skills and Project Management 1. Teamwork Skills.
Project Management by Prof. Bitar. What is Project Management? The discipline of organizing and managing various resources to accomplish a particular.
A2 Technology Product Design Systems and Control Notes DT4 - Exam.
©1999 Addison Wesley LongmanSlide 3.1 Managing IS Projects Planning –Decomposing Project into Activities –Estimating resources –Developing a schedule –Setting.
Project Scheduling Software
Project Management Software Application PRM 705 Lecture 5 Mian Wasim Irshad.
Chapter 3 Managing the Information Systems Project
Project Management Inspections and Reviews 1 February.
Project Management Organization Scheduling 31 January.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
CON 2001 Construction Methods Tool #1 - Construction Scheduling Presented by Elia Twigg, P.E. (Prof. Ralph V. Locurcio, P.E.)
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 8 – Scheduling.
Project Scheduling Class 7.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Microsoft Project 2010 ® Tutorial 1: Planning a Project.
WEEK 3 Project Planning.
Survey Training Pack Session 17 – Budgeting and timelines for survey design and implementation.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
MANAGEMENT of INFORMATION SECURITY, Fifth Edition.
Managing the Information Systems Project Cont’d
PROJECT MANAGEMENT.
BUSINESS DRIVEN TECHNOLOGY
Business System Development
Project Planning & Scheduling
The Project Schedule and Budget
Project Planning & Scheduling
Gantt Charts for project management
Guide to Project.
SE Tasks for a Concept Development Project
Resource Scheduling Difficult. Maybe Only for Big Problems
Project Management: A Managerial Approach
Planning Tools.
Importance of Project Schedules
REQUIREMENTS Project management tools
Presentation transcript:

Gantt Charts for project management Jeff Barratt Supply Chain and Operations Management Dr. Tom Foster Marriott School of Management Brigham Young University

Gantt Chart Applications What is a Gantt Chart Gantt Chart Applications Gantt Chart Exercise Gantt Chart Example

What is a Gantt Chart? A visual representation of a project over time Used to schedule, coordinate, and allocate the resources needed to complete a project Shows start, end, and specific target dates called “milestones” Everyone creates at least a mental timeline for a project they undertake, but physically creating a timeline forces a more thorough and well thought out plan. Gantt Charts can easily be customized. Some Gantt Charts use 3-D graphs to involve time, task, and specific resource quantities.

Benefits of Gantt Charts Efficiency Increase Project tracking Set deadlines Communication Increase Coordination Increase Provides motivation through scheduling Encourages creativity Set dates help envision the project at different stages. Time becomes concrete, not abstract, thus motivating the project along. As one Gantt Chart is shared between different departments vision is shared and communication and coordination increase. Creativity is created as people use new ideas in order to finish a task within a time constraint.

Features of Gantt Charts Easy to create Freehand Gantt charts Microsoft Excel Microsoft Project SmartDraw, Primavera, and other programs. Easy to modify and adjust Simple to understand Microsoft Project seems to be the most popular of all Gantt chart software.

Disadvantages of Gantt Charts Activity descriptions often lack detail A lack of precedent and subsequent task relationships Does not allow for uncertain situations such as late or early finish times.

How Can This Tool Be Used in Your Organization? Can be used for… Specific projects. Streamlining of everyday projects. Personal planning. Planning a meeting. Increasing communication and project input. Upcoming projects? Communication barriers? Time restraints?

Gantt Chart Fundamentals Separate tasks are listed in vertical rows Time spans horizontally along the top Each task is represented by a bar along the time horizon Gantt Charts can be made using a variety of computer programs, or by simply using freehand to graph tasks along a time axis. A vertical bar can be used to depict the current point in time, as shown just before the December 10 section.

How to Create a Gantt Chart using Microsoft Project Another option not here shown, but effective, is linking tasks together by precedent/follower relationships. List any resources to be used Enter Task Name Adjust start and end times Choose task duration

Exercise Water Tight Security Systems just got a bid for installing the security system on a new government building… The government building is over 500 miles away and you want to ensure a good job to promote further business. Continued on the next slide…

Exercise continued Schedule the project’s completion using a Gantt chart. Include the following steps: Test the system (0.5 days) Install the system (4 days) Order and await supplies (9 days) Evaluate facility’s security needs (4 days) Schedule installation time (1 day) Installation crew travel (2 days) These steps are in no specific order. The task will include organizing these steps into a logical order, and including any other steps you may feel necessary. Organize the tasks over time using a Gantt chart on a computer or a Gantt chart created by hand.

Solution Notice the overlap of some acitivties, such as Scheduling Installaion Time and Ordering Supplies. There is no “correct” answer to this exercise, as Gantt charts can be adapted to meet specific specifications, preferences, or needs.

Real World Examples Government Uses Private Uses Hoover Dam construction, 1931 Interstate Highway Network, begun 1956 Private Uses Specific projects such as launching a new product Construction planning such as building a home Personal planning

Medical School Application A Personal Planning Example: Medical School Application Here is an example of a personal application of a student’s project of getting into a medical school. Notice that as tasks are completed they are filled in (Prepare for and take MCAT and Research schools tasks), thus tracking progress.

Additional Information Microsoft Office homepage Academy of Management Journal. 2002,Vol. 45, No. 5, 956-970. “Charting Time: Timelines as Temporal Boundary Objects.” Elaine K. Yakura. Cost Engineering. Vol.47/No.7 July 2005, 14-21. “Effective Use of Gantt Chart for Managing Large Scale Projects.” Pankaja Pradeep Kumar, CCE. Link

Additional Information Cont. IEE Engineering Management. June/July 2003. “Uncharted Territory?” Alan Orr. Project Management Fifth Edition, 1995. Harold Derzner, Ph.D. Pp 705-711. See also: Program evaluation and review technique (PERT) Critical path method (CPM)

Summary Gantt charts are visual representations of a project over time. Includes start, finish, and milestone dates. Useful in project planning and tracking. Helpful in resource communication and allocation Every project will have a timeline. Gantt Charts improve project efficiency through the creation of a physical timeline.