Weld County Division 6 Wind Generators and Permitting Requirements Sec. 23-4-450. Wind generator standards. Chris Gathman, Planner III, Weld County WIND.

Slides:



Advertisements
Similar presentations
Subdivision Plat Submittals Subdivision Plat Submittals
Advertisements

WHAT DOES THE CITY of New Orleans ZONING ORDINANCE DO?
Intro to Maine Subdivision Law
City of Gulf Breeze Land Development Code Update
General Provisions Affordable Housing Signs Transfer of Development Rights 2009 ULDC Update September 8,
BCC CALLED PUBLIC HEARING ON BZA #SE , DECEMBER 4, 2014 APPLICANT: NORBERTO DUARTE Orange County Zoning Division DATE: March 10, 2015.
BCC Worksession Ch.31.5 Sign Code Amendments Zoning Division January 6, 2015.
Patty Bartlett Logan County Treasurer / Public Trustee.
City Council Meeting January 18, Background  Staff receiving increasing number of inquiries regarding installation of wireless telecommunications.
Board of County Commissioners 9/27/2011.  Minor Amendment to Existing Special Use Permit for Oak Hall Private School to modify conditions relating to.
PERMITTED SIGNS: COMMERCIAL AND INDUSTRIAL ZONING DISTRICTS Height Requirements: A ground sign shall not exceed thirty feet (30') in height, measured.
Public Hearing January 8, Case:CDR Project:Waterford Commons Planned Development/Land Use Plan (PD/LUP) - Substantial Change Applicant:Bob.
January 29, 2008 BCC Called Public Hearing on BZA # SE , 12/6/07 APPLICANT: Ganesh Bansrupan.
MISSOULA DESIGN REVIEW BOARD La Quinta Inn 5059 N. Reserve Street Case Planner: Ana Aronofsky Public Hearing Date: April 8, 2009 Applicant: Jeff Anderson.
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Toll FL Limited Partnership District 1 August 4, 2015 Environmental Protection.
BCC WORK SESSION OVERVIEW OF ORANGE COUNTY SIGN CODE (PART II) SEPTEMBER 24, 2013.
An Appeal of a Request For a Special Use Authorization For a Solar Energy Power Plant Docket SUA Appeal of Rainbow Solar Facility.
BCC Public Hearing for consideration of an Agreement to Offer Donation of Real Property -and- a Solid Waste Management Permit Renewal APPLICANT: Hubbard.
Public Hearings August 6, Case: LUP Project: Ivey Groves PD/LUP Applicant: Thomas Daly, Daly Design Group, Inc. District: 1 Proposed Use:R-CE.
BCC APPEAL PUBLIC HEARING ON BZA #SE APPLICANT/APPELLANT: FIRST KOREAN PRESBYTERIAN CHURCH OF ORLANDO Orange County Zoning Division December.
City of Gloucester Wind Turbine Siting. Background Prior to May 17, 2007 – Wind Energy Conversion Devices – Special Permitted in any district by ZBA –
ZOM Newberry/122 nd St. PD. Applicant Request Applicant is requesting a rezoning from RE-1 (single-family residential) to PD (non-residential planned.
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
Wakulla County Board of County Commissioners August 18, 2008 Workshop Off-Premise Sign Existing Regulations & Proposed Changes Workshop Off-Premise Sign.
Case: LUP Project: Jama PD / LUP Applicant: Momtaz Barq, Terra-Max Engineering, Inc. District: 1 Acreage:8.94 gross acres Request:To rezone the.
Subcommittee on Heights, Massing, and Alternate Standards    Third Report – January 20, 2009 Planning & Zoning Commission.
A 1,240 Acre Master Development Plan Proposal, West of Willcox, AZ. Cochise County Board of Supervisors August 23, 2011 Docket MDP / Z
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Northwest Quadrant Draft Zoning Ordinance NWQ Draft Zoning Ordinance Planning Commission Review February 21, 2006 Phil Carlson, AICP DSU Planning Consultant.
Legal and Illegal Examples: Unified Development Code (C) Temporary Signs.
FEBRUARY 21, 2012 BCC PUBLIC HEARING ON BZA # SE , Nov. 03, 2011 APPELLANT/APPLICANT: CHANTEL PRESTON.
Request to Downzone from R-36 To RU-2 Zoning District Applicant: Marshall Miles of GM Propane Docket Z Request for a Rezoning Board of Supervisors.
FOR CLERKS AND RECORDERS  Planning Commission – public meeting and a public hearing  City Council – public hearing  Must contain: - a map of expansion.
Tall Structures Towers and Wind energy systems. What we do now. a.CUP for large towers and sites solely dedicated to towers under the definition of “public.
ADOPTION PUBLIC HEARING DONATION BIN ORDINANCE Zoning Division June 24, 2014.
Community Development Department APPLICATION #2457 GRAND HAVEN PUD AMENDMENT APPLICATION #2411 GRAND HAVEN NORTH: SMALL SCALE FLUM AMENDMENT APPLICATION.
ZOX Prairie View Solar Array Special Exception.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
November 11, 2008 BCC PUBLIC HEARING ON BZA #SE , September 4, 2008 APPLICANT/APPELLANT: Christian Haitian Church, Inc.
FIRST PUBLIC HEARING DONATION BIN ORDINANCE Zoning Division June 3, 2014.
Private Sector  Buildings and structures built for ordinary people.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Zoning Ordinance Update 15 MAY Purpose and Intent Update Comprehensive Plan ( ) Update Zoning Ordinance (2012) Implementation and Adjustment.
City of Talent VAR Suncrest Homes Planning Commission October 22, 2015.
“Wind Power Facilities Law for the Town of Madison” (the Wind Law) If passed, the Wind Law will replace the existing law - “Windpower Facility Special.
LOCATIONAL AND SUPPLEMENTAL CRITERIA FOR UTILITY SCALE PHOTOVOLTAIC SOLAR FACILITIES.
STAKEHOLDERS MEETING JKV- OAK PARK JANUARY 15, 2016 Orange City Sign Code Review 1.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
Adapted by Project Greenscape Coordinator LITTORAL SHELF PLANTING Collier County Growth Management Division - Natural Resources Department 2800 North Horseshoe.
Joy Patterson, Principal Planner City of Sacramento March 16 th, 2016 For the 2016 Planning Academy.
Christopher Brown, Planner II December 4th, 2014 Case No. 14ZONE1036 La Grange Road Office Louisville Metro Planning Commission Public Hearing.
Starling of Palm Coast Assisted Living Facility Tier 2 - Technical Site Plan Review PLDRB Hearing on March 16, 2016.
Washoe County Board of Adjustment
Marin County Local Coastal Program Amendment
Butte County Board of Supervisors December 6, 2016
8/23/2016 Luis N. Serna, AICP David, Healey, FAICP
Proposed Zoning Ordinance
Common Surveys Used For Commercial Real Estate Transactions
Chapter 15 Site Plan Layout.
Special Exception to Reduce the Required Front Yard Setback for
Planning Commission January 20, 2016
Subdivision Applications
Cell Tower Ordinance Update
Village of Montgomery Solar Permitting
Washoe County Board of Adjustment March 7, 2019
Washoe County Board of Adjustment
Washoe County Board of Adjustment April 6, 2017
Board of County Commissioners
Environmental Protection Division

Presentation transcript:

Weld County Division 6 Wind Generators and Permitting Requirements Sec Wind generator standards. Chris Gathman, Planner III, Weld County WIND GENERATORS are allowed as accessory uses, subject to Zoning Permit for Wind Generator requirements, or as a Use-by-Special Review Permit, per the height guidelines and maximum numbers for LEGAL LOTS. The height of a wind tower is measured at the hub of the generator: Weld County Planning & Zoning Department Greeley Offices1 (970) 356 – 4000 Chapter 23 of the Weld County Code:

Sec Wind generator standards. Lot Size (Gross Acres) 1 Acre – 2.49 Acres Up to 40 feet and rotor diameter 12 feet or less -Accessory Use (building permit) 41 – 60 feet -Zoning Permit Above 60 feet, or more than 3 per LEGAL LOT -Use by Special Review Permit 2.5 Acres – 4.99 Acres Up to 60 feet and rotor diameter of 14 feet or less -Accessory Use (building permit) 61–120 feet - Zoning Permit Above 120 feet, or more than 3 per LEGAL LOT -Use by Special Review Permit 5 Acres and Above Up to 120 feet and rotor diameter 25 feet or less - Accessory Use (building permit) 121–180 feet -Zoning Permit Above 180 feet, or more than 3 per LEGAL LOT -Use by Special Review Permit

General Standards All WIND GENERATORS are subject to the following standards: A. Up to three (3) WIND GENERATORS per LEGAL LOT are allowed. More than three (3) WIND GENERATORS on a LEGAL LOT shall require the issuance of a Use-by-Special Review Permit, pursuant to the requirements of Article II, Division 4 of this Chapter, or the issuance of a 1041 Permit, pursuant to the requirements of Article III, Chapter 21 of this Code. B. WIND GENERATORS requiring the issuance of a Zoning Permit for WIND GENERATOR are subject to the application requirements of Section of this Chapter. WIND GENERATORS requiring the issuance of a Use-by-Special Review Permit are subject to the application requirements of Section of this Chapter. WIND GENERATORS requiring the issuance of a 1041 Permit are subject to the application requirements of Article III, Chapter 21 of this Code.

General Standards Electrical controls must be wireless or underground, and power lines must be underground, except for an interconnection to an existing above-ground power grid. WIND GENERATORS are subject to the following noise limits (measured from the nearest property line from the WIND GENERATOR): –1) Residential: Fifty (50) decibels. –2) Commercial: Fifty-five (55) decibels. –3) Light Industrial (I-1 Industrial): Sixty-five (65) decibels. –4) Industrial (I-2 and I-3 Industrial): Seventy-five (75) decibels. WIND GENERATORS are subject to applicable Federal Aviation Administration (FAA) requirements and/or permits. WIND GENERATORS generating power as a commercial enterprise may be subject to regulation by the Colorado Public Utilities Commission.

General Standards If proposing to interconnect to a utility company, the applicant shall provide to the Department of Planning Services a copy of a "letter of intent to interconnect:" or interconnection agreement signed by the utility company. (Weld County Code Ordinance ) WIND GENERATORS must be painted or coated a nonreflective white, grey or other neutral color. WIND GENERATORS must not be artificially illuminated, unless required by the Federal Aviation Administration (FAA).

Setbacks All WIND GENERATORS must be set back from property lines, public rights-of-way and access easements of a distance at least one (1) times the hub height of the generator. All WIND GENERATORS must be set back from any existing or planned overhead lines a distance of at least one (1) times the hub height of the generator. No part of the system, including guy wire anchors, shall extend closer than thirty (30) feet to the property boundary.

Zoning Permit for WIND GENERATOR An application for a Zoning Permit for a WIND GENERATOR shall include the following: –A. Name, address and telephone number of the applicant. –B. Name, address and telephone number of the owner of the land, if different from Subsection A. above. –C. Parcel number and legal description of the property for which the application is made. –D. Evidence of interest in the subject land held by the applicant. –E. If proposing to interconnect to a utility company, copy of a "letter of intent to interconnect" or interconnection agreement signed by the utility company. –F. Number of acres of the property. –G. Elevation drawings of the proposed facility showing all towers, structures and other improvements related to the facility, showing specific materials, placement and colors. –H. County road access information sheet.

Zoning Permit for WIND GENERATOR (Con’t) I. A vicinity map showing adjacent properties, general land uses, zoning and roadways: –1. Within five hundred (500) feet of the proposed wind generator site. J. A sketch plan of the site at the scale of one (1) inch represents fifty (50) feet, or other suitable scale to show: –1. The proposed location of the wind generator(s) and other support structures (guy wires), including distances from the property LOT lines, above-ground power lines and other STRUCTURES on the property. –2. Location and measurements of any easements or rights-of-way. –3. Amount of road frontages. –4. Identification of any county, state or federal roads or highways. –5. Existing STRUCTURES on the property.

Zoning Permit for WIND GENERATOR (Con’t) K. An application fee. L. A certified list of the names, addresses and the corresponding Parcel Identification Number assigned by the County Assessor of the owners of property (the surface estate) within five hundred (500) feet of the property lines of the parcel on which the wind generator(s) shall be placed. The source of such list shall be the records of the County Assessor, or an ownership update from a title or abstract company or attorney derived from such records or from the records of the County Clerk and Recorder. If the list was assembled from the records of the County Assessor, the applicant shall certify that such list was assembled within thirty (30) days of the application submission date. M. Notification responses of at least thirty percent (30%) of surrounding property owners within five hundred (500) feet of the subject property in opposition to the location of the WIND GENERATOR(S). (Weld County Code Ordinance )