Robert Neches & Pedro Szekely, USC ISI, © 2000 CAMERA, Logistics Working Group CAMERA - MICANT Coordination Robert Neches, Pedro.

Slides:



Advertisements
Similar presentations
WMO Monitoring & Evaluation System (Measuring our Performance/Success)
Advertisements

JSIMS 28-Jan-99 1 JOINT SIMULATION SYSTEM Modeling Command and Control (C2) with Collaborative Planning Agents Randall Hill and Jonathan Gratch University.
Stoimen Stoimenov QA Engineer SitefinityLeads, SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
Metrics for Process and Projects
Panorama Consulting Group LLC ERP Assessment, Selection, and Planning SAMPLE APPROACH.
Copyright Robert Neches, November 1999 CAMERA Logistics Working Group Report to the ANT P/I Meeting 18 November, 1999 Bob Neches, Pedro Szekely, George.
TRM 450 X Research Methodology Spring Semester 2004 Dr. Zongqing Zhou.
Chapter 15 Design, Coding, and Testing. Copyright © 2005 Pearson Addison-Wesley. All rights reserved Design Document The next step in the Software.
Designing a Product Product design is usually a problem that requires a creative Design and/or manufacturing solution.
Design Process …and the project.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
SYSTEMS ANALYSIS LABORATORY HELSINKI UNIVERSITY OF TECHNOLOGY A Simulation Model for Military Aircraft Maintenance and Availability Tuomas Raivio, Eemeli.
Unit 3a Industrial Control Systems
Process: A Generic View
Deloitte Consulting SCOOPS Session September 2003.
1 Open Cougaar 2004 Dr. Mark Greaves DARPA / IXO.
Collaboration to Meet Future T&E Needs ITEA 14 September Mr. Mike Crisp Deputy Director, Air Warfare Operational Test and Evaluation.
Complexity Optimization Strategic advantage via cutting edge mathematical optimization technology.
Project Management Chapter 3. Objectives Become familiar with estimation. Be able to create a project workplan. Understand why project teams use timeboxing.
Institute for Software Integrated Systems Vanderbilt University MAPLANT A Decision Support Tool for Aircraft Maintenance Chris van Buskirk June 28 th,
Crew Planning Optimization Mastering the planning objectives
Integrating COIN and Full Spectrum Training LtCol M. B. Barry 23 Sep 2010.
Nursing Home Incident Command System
MICANTS Scenario & Demo Description “A Day in the Life of VMA-513” Scenario by Russ Currer Presented by Greg Nordstrom.
Wireless Networks Breakout Session Summary September 21, 2012.
0 PM Metrics Briefing COL Stephen L. Rust PM ITTS 25 Mar 04.
ANTs PI Meeting, Nov. 29, 2000W. Zhang, Washington University1 Flexible Methods for Multi-agent distributed resource Allocation by Exploiting Phase Transitions.
Robert Neches & Pedro Szekely, USC ISI, © 2001 CAMERA, CAMERA Coordination and Management Environments for Responsive Agents.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
MICANTS Model-Integrated Computing and Autonomous Negotiating Teams for Autonomic Logistics Gabor Karsai (Vanderbilt/ISIS)
1 SAIV/CAIV/SCQAIV LiGuo Huang USC University of Southern California Center for Software Engineering CSE USC.
Webster Visualize Webster Financial Team Visual Scrumware Joe Andrusyszyn Mark Bryant Brian Hannan Robert Songer.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
MICANTS Gabor Karsai Benoit Dawant Greg Nordstrom Chris vanBuskirk Karlkim Suwanmongkol Patrick Norris Jonathan Sprinkle (Vanderbilt/ISIS) Jon Doyle Robert.
MICANTS Gabor Karsai Benoit Dawant Chris vanBuskirk Gabor Szokoli Jonathan Sprinkle Karlkim Suwanmongkol (Vanderbilt/ISIS) Jon Doyle Robert Laddaga Vera.
MICANTS Gabor Karsai Benoit Dawant Greg Nordstrom Chris vanBuskirk Karlkim Suwanmongkol Patrick Norris Jonathan Sprinkle (Vanderbilt/ISIS) Jon Doyle Robert.
Copyright Chris van Buskirk, Mar 2001 MAPLANT Status Report MICANTS March 2001.
Office of Pipeline Safety Integrity Management Inspection Process Louisiana Pipeline Safety Seminar August 2003.
Production Planning and Control
MICANTS Gabor Karsai Greg Nordstrom Chris vanBuskirk Jon Doyle Vera Ketelboeter George Bloor Russ Currer Vanderbilt/ISIS MIT Boeing Idea Services Benoit.
Copyright Robert Neches, Sept 1999 CAMERA CAMERA Coordination and Management Environments for Responsive Agents Robert Neches, P/I Pedro Szekely, Project.
Project Management Planning Minder Chen, Ph.D. CSU Channel Islands
Chapter 10 Advertising strategies and tactics. We are transforming the world's first advertising agency into the world's first global brand communications.
Information & Decision Superiority Case studies in applying AI planning technologies to military & civil applications Dr Roberto Desimone Innovations.
Advanced Decision Architectures Collaborative Technology Alliance An Interactive Decision Support Architecture for Visualizing Robust Solutions in High-Risk.
Design Process … and some design inspiration. Course ReCap To make you notice interfaces, good and bad – You’ll never look at doors the same way again.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
SNAP-MAPLANT Integration Effort Strategy Meeting – 2 Mar 2001.
Project Management Workshop James Small. Goals Understand the nature of projects Understand why Project Management is important Get an idea of the key.
Create & Innovate ICTs for Education? Technology without Context lacks Purpose.
Contract Year 1 Review IMT Tilt Thompkins MOS - NCSA 15 May 2002.
Model Integrated Computing and Autonomous Negotiating Teams for Autonomic Logistics G.Karsai (ISIS) J. Doyle (MIT) G. Bloor (Boeing)
Project Management Training
1 Who Are We Negotiation Technology In Real Use Users: MARINE AIR GROUP 13.
Adaptive Integrated Framework (AIF): a new methodology for managing impacts of multiple stressors in coastal ecosystems A bit more on AIF, project components.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
minstrelinhibernation.blogspot.com community.sparknotes.com yamber.deviantart.com
P. Mokashi IES Team Meeting, SwRI 29 May IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test.
T Project Review RoadMappers I2 Iteration
Copyright Greg Nordstrom PhD, Apr 2001 MAPLANT Status Report MICANTS April 2001.
Implementation Chapter 10 McGraw-Hill/Irwin Copyright © 2009 by the McGraw-Hill Companies, Inc. All rights reserved.
Autonomy: Executive and Instruments Life in the Atacama 2004 Science & Technology Workshop Nicola Muscettola NASA Ames Reid Simmons Carnegie Mellon.
NIH Change Management Program Change Management Program Overview March 8,
PROPOSED STRATEGIC PLANNING PROCESS DECEMBER 3, 2014 Port of Port Angeles.
An Overview of HRM & SHRM Chapter 1 References: Human Resource Management, 13 Edition, Wayne Dean Mondy Strategic Human Resource Management by Jeffrey.
Game Design, Development, and Technology
Pre-landing Orbiter Observations
Driving Successful Projects
Directions for this Template
Presentation transcript:

Robert Neches & Pedro Szekely, USC ISI, © 2000 CAMERA, Logistics Working Group CAMERA - MICANT Coordination Robert Neches, Pedro Szekely University of Southern California Information Sciences Institute Marina del Rey, California Gabor Karsai, Benoit Dawant Vanderbilt University Russ Currer Idea Services

Robert Neches & Pedro Szekely, USC ISI, © 2000 CAMERA, What Makes True Logistics a Good Negotiation Testbed? Dynamic, continuous process: Simultaneous long-range, short range and execution concerns –Six-month to year goals for Marine Expeditionary Units (MEUs): you, your aircraft, data, systems and 2k friends –Build/maintain weekly and daily schedules –Repair schedules on five minutes notice Strong good-enough / soon-enough pressures (same reasons) Contrast to traditional optimization –Cannot elicit full evaluation function in advance –Frequent need to change constraints to handle problem VERY high military payoffs: Money, Lives

Robert Neches & Pedro Szekely, USC ISI, © 2000 CAMERA, Key Ideas of a Joint Demonstration First demonstration of feedback loops in a large-scale negotiation process Commander’s Intent Mission-Sensitive Planning

Robert Neches & Pedro Szekely, USC ISI, © 2000 CAMERA, CAMERA / MICANTS Integration Plan 1. Scheduling/planning of short-term, tactical, corrective maintenance actions in light of the flight schedule SNAP supplies daily flight schedule to MAPLANT which in turn generates a daily maintenance plan 2. Scheduling/planning of long-term, strategic, scheduled maintenance actions w.r.t. long-term flight schedule SNAP supplies n-week flight schedule to MAPLANT which uses that to generate a long term maintenance plan 3. Scheduling flight operations based on plane availability MAPLANT provides a "best effort" estimates for the number of available aircrafts over time. SNAP creates a schedule based on these estimated generation rates. 4. Scheduling flight operations based on plane availability and capabilities MAPLANT provides a "best effort“ estimates for the number aircrafts, their capabilities, other attributes, and negotiable and non-negotiable constraints associated with them. SNAP creates a schedule based on this. 5. Negotiation between MAPLANT and SNAP The two systems interact using a well-defined messaging protocol to facilitate negotiation between the flight schedule and maintenance schedule. The objective is to explore trade-offs between the two aspects to achieve global optimization w.r.t. some metric (e.g., generation rate, CRP, etc.)

Robert Neches & Pedro Szekely, USC ISI, © 2000 CAMERA, Insights and New Directions Services rendered by negotiation –Control systems –Decision support Dimensions of scaling to explore –Speed: tie to replanning during missions –Size: coordinating much larger organizations –Planning horizon: very long-range planning

Robert Neches & Pedro Szekely, USC ISI, © 2000 CAMERA, Rough Demo Scenario OPSMaintenance Guidance MAPLANT SNAP First Cut Plan Refined Ops Plan Approx. Maintenance Plan (A/C status) Refined Maintenance Plan

Robert Neches & Pedro Szekely, USC ISI, © 2000 CAMERA, Tasks and Timeline CAMERA: implement SNAP initial assessment milestones (esp. flight hour guidance) MICANT: scope initial MAPLANT coverage of maintenance issues(portions of T&R manual, Mission Essential Systems List) in order to determine scenario specifics Week of Dec 18: VTC to define interfaces (probably XML DTDs), flesh out schedule based on scenario specifics Jan: coordination meeting Feb: Status review: GO vs. DEFER decision on scheduling If decision is GO, then: –Issue invitations to major constituents for high-profile demo in April –Schedule March integration and first rehearsal meeting –April: provide major demonstration at MCAS Yuma and/or other venues