Www.senergyworld.com Grid Connections: Now and the Future Patrick Smart Head of Commercial and Regulatory 10 th November 2010.

Slides:



Advertisements
Similar presentations
Installation of a Static Var Compensator on to an 11kV network
Advertisements

Load Management System with Intermittent Power on the Grid Ruth Kemsley CEng MIMechE MIEE Econnect Ventures Ltd.
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
A Path breaking Technology for Network Maintenance and Optimization
Capacity to Customer (C 2 C) Update ENA 2012 Low Carbon Network Fund Conference 26 October 2012.
The new geography of power generation. Key players 1 Windfarm/nuclear operator – builds and operates new power station (e.g. EAOW or EDF). Sells.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Grid Issues Charles Davies Commercial Director, National Grid Company British Wind Energy Association April 2002.
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
Operating a Wind Farm in the Future Smart Grid: Lessons from developing and deploying a Smart Grid on Shetland Presented by:Mr. Simon Gill (University.
1 Cara Blockley Low Carbon Projects Manager Future Distribution Networks 15 October 2013.
1 Optimising grids Understanding capacity needs to make networks more efficient Mike Kay Networks Strategy and Technical Support Director 23 September.
WATERLOO ELECTRICAL AND COMPUTER ENGINEERING 60s: Power Engineering 1 WATERLOO ELECTRICAL AND COMPUTER ENGINEERING 60s Power Engineering Department of.
Energy Efficiency Commitment : A view from energy suppliers Russell Hamblin-Boone Head of Corporate Affairs.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
Renewable Targets and Policy Linda Pooley Head of Renewable Energy Technology and Investment Scottish Governmnet.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
1 A Review of Potential Gains from Reforms ECRA Workshop 6 November 2006 Dr Brian Wharmby Independent Consultant, former Technical Director of Ofgem
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
“Investment in Transmission” Economics of Electricity Markets – IDEI Toulouse, 2-3 June 2005 Jon Carlton – Director of Network Strategy.
Errol Close Decarbonisation Policy and Co-ordination IWFA May Conference.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
An Overview of Our Regulatory Proposal
Turkish Power System Overview March 2012
World Forum on Energy Regulation IV Athens, Greece October , 2009 "Reducing Regulatory and Technological Barriers to Demand Side Participation“
Smart Grid Forum - Update DCMF Meeting – 7 February 2013 Gareth Evans Head of Profession – Engineering Ofgem.
GB Electricity Market Reform: The implementation challenges ahead IAEE International Conference Stockholm, June 20 – Dorcas Batstone
Perpetual Energy Feb 2009 Rod Edwards Technical Director Perpetual Energy Ltd and Treasurer, Bro Dyfi Community Renewables Ltd.
Sommerville Power Engineering Ltd. Introduction & Overview Company Number , registered in England & Wales. SPE August 2015.
Better Regulation: Expenditure assessment and incentives 29 April 2013.
1/20 ea technology MicroCHeaP: Month 24 meeting Athens Work Package 4 presentation 21 September 2006 Presented by Yvonne Dickson Partners in power asset.
Capturing the value of innovation Introductory comments – 2012 LCN Fund Conference Hannah Nixon – Senior Partner, SG&G (Distribution)
Communicating a Smarter Future Keynote at Network th annual distribution network strategy conference 16 February 2012 Sandy Sheard Deputy Director.
Ensuring the delivery of secure low carbon energy David Green Chief Executive, UKBCSE.
ARODG - 2 An overview of transmission access arrangements Mark Copley & Colin Sausman 1 st and 2 nd February 2007.
DG Toronto Hydro’s Perspective Task Force on Distributed Generation Richard Lü VP, Environment, Health & Safety March 5, 2003.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
08/12/2015 Developing renewable energy cost effectively EUROPEAN COMMISSION Tom Howes European Commission.
The 2006 Energy Review Regional Stakeholder Seminar: Fuel Poverty and Energy Efficiency 31 January 2006 Carl McCamish Deputy Head of Energy Review Team.
Structure of Charges Year-end review for DCMF 22 November 2007.
ACCESS TO THE GRID Vaida Tamašauskaitė Power System Planning Division Power System Development Department Lietuvos energija AB Ryga, 3 July, 2006.
EEC3 – The Way Forward Presentation to NIA Annual Conference 12 December 2006 By Iris Rooney, Defra.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
Introduction & Overview Company Number , registered in England & Wales. December 2015.
S. GRENARD/ D. MELOVIC/ G. STRBAC UK Alpha 5 – Block 2.1 Barcelona May Effect of losses on design and regulation of distribution networks.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Review Group -140 Thoughts on additional information requirements.
National Grid - Key Challenges Beijing 24 October 2005 Alan Smart Optimisation & Risk Manager UK Transmission.
Demand Side Management Andy Pace 6 October | Energy Networks Association - DCMF.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
Connecting Low Carbon Generation Clive Goodman Primary System Design Engineer.
PARCA Demonstration Data Information Flow Diagram Footnote:- No set timescales – timescales will be agreed by the Project Team Phase 0 Phase 1 Phase 2.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
Accelerating Renewable Connections Stakeholder Workshop Scotsman Hotel, Edinburgh 30 th June 2015 Presented by Euan Norris Senior Project Manager, Future.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
1 Watson Peat Using Intelligence to INSPIRE Future Networks 12 th May 2016.
Smart Grid Paul Bircham Commercial Strategy & Support Director.
Presentation at REEEP Regulatory Forum, 28 September 2004
Exit Capacity User Commitment – Transmission Workstream update
An update on schemes where batteries can earn revenue
Global Electric Transmission and Distribution Equipment Market : Trends, Forecast, and Opportunity Analysis 1.
EU-IPA12/CS02 Development of the Renewable Energy Sector
EV charging – a grid perspective
UK typical power transmission and distribution costs
Typical power transmission and distribution costs
Electricity Distribution and Energy Decarbonisation
Presentation transcript:

Grid Connections: Now and the Future Patrick Smart Head of Commercial and Regulatory 10 th November 2010

Agenda Introduction to SEL Overview of Grid and Grid Process Technical challenges National Grid’s impact on renewables How to manage Grid risk The future of grid connections

Senergy Econnect Ltd Established as Econnect in 1995 Grid connection of all renewable generation technologies Hagshaw Hill, North Hoyle – Landmark projects for UK Renewables Electrical Engineering and Commercial and Regulatory Consulting Now part of Senergy Group, based in Newcastle

The GB Network

Overview of Electricity Industry 1 Transmission GB System Operator 3 transmission owners 14 Distribution Network Operators (7 companies) NGETL Scottish Power, Scottish Hydro-Electric

Distribution Network Areas

Securing Grid Capacity Accept a connection offer –…which generally requires a down payment (£70K to £200k for commercial onshore wind) –…and a commitment to progress construction So when do I initiate the grid process? Planning or grid first? Some information in the public domain – DNO Long Term Development Statements.

DNO Connection Process DNOs obliged to offer terms to connect to network Submit competent application (likely DNO up front fee in the near future) Offer within 3 months Open for acceptance for 30 days or 3 months. Can normally be extended but not guaranteed. Acceptance usually requires initial down payment – to cover detailed studies and design.

DNO Point of Connection Offers Non-contestable connection works only New Standards in effect from 1 October 2010 Obliged to offer budget estimates within set period (20 WDs for commercial projects) PoC Offers - DNO liable for compensation of £150 per day late!!!! (for applications received after 1 October 2010…..) All works offers – DNOs to include 4% margin on contestable works

Connection Offer Process Offers of terms for connection open for acceptance for 30 days or 3 months. Can normally be extended but this is not guaranteed. Acceptance usually requires initial down payment - £70K to £200k Obligation to agree construction programme

DNO Connection Offer Content Outline of connection solution Outline of DNO works, reinforcements and construction program Technical and communication requirements User’s obligation (design to ENA standards) Price (often indicative until contracts placed) Connection cost and risk project specific

Connection Offer Process – National Grid Transmission System Impact Dash for Wind in late 2004 / Massive shortfall of grid capacity relative to applications / agreements (note not necessarily consented wind) The “GB Queue” Much of the GB Queue connecting at distribution voltage

Connection Offer Process– National Grid

Managed through embedded bilateral agreements and the Statement of Works process “Large” generators must enter into a bilateral agreement (BELLA or BEGA) Small / medium generators may be referred to National Grid for a “Statement of Works”. National Grid responds with view on transmission system impact

Key Technical Considerations Three main network problems: Thermal capacity Fault levels Voltage rise Further technical considerations: Harmonics Voltage Flicker Design requirements (e.g. G59) If you cause technical problems, your connection will take longer to complete and be more expensive.

Transformers Overhead line Overheating leads to insulation failure Reverse power flow capability? Switchgear Overheating leads to insulation failure Cables Overheating leads to insulation failure Safety clearance Thermal Capacity

Fault Current G G Contribution of current to a fault on network can lead to an overstressing of existing switchgear and is a major limiting factor to the connection of embedded generation Primary Substation Distribution Feeder Fault Currents

Voltage Rise Voltage max min Substation Overhead line

Voltage Rise - Mitigation Voltage max min Substation GenAVC maximise generation Within limits

Connection Offer Process – Key Messages Assess grid early (publicly available information) Engage with the DNO and stay in touch Ask about National Grid impact Plan submission of connection application in light of process delays and obligation to commit c£100k Reflect outputs from assessment and DNO liaison in application

Future Grid Connections Transmission Generators Transmission Network Distribution Network Distribution Generators Consumers Network Owners Transmission Generators

Grid Connections in the Future Regulatory reform – RIIO (Revenue Incentives Innovation Outputs) Key principles –Focus on outputs and delivery (more from assets) –Longer term view (decarbonisation) –Reward for higher performance –Encourage innovation (prizes) “£32 billion” of investment required What does that mean for grid connections…?

Grid Connections in the Future Who knows….watch the RIIO space..BUT Opportunities for new technologies / techniques to raise long term efficiency Smart Grids (?) – from dynamic substation control to domestic load switching. Electrical efficiency of connecting close to significant points of demand. Extend on the principle of negative GDUoS for HV connections.

Patrick Smart Head of Commercial & Regulatory