CE 515 Railroad Engineering Line-haul Operations Source: Armstrong Ch 13 “Transportation exists to conquer space and time -”

Slides:



Advertisements
Similar presentations
Create a Detailed CTC Machine Model with JMRI/PanelPro
Advertisements

Railcar 101 The Basics of Railcars: Car Types, Components and Rules
0 Communication Needs for a 21 st Century Railroad May 17, 2007 IEEE Communications Society CQR International Workshop 2007.
Radio Etiquette Training
Card Order Basics. Card Order Basics What is It? –An advanced scheme for operating a model railroad –Allows for a realistic means of determining what.
GIS Data in Real-Time Transit Management Systems 2011 GIS in Public Transportation Conference St. Petersburg, FL, September 14, 2011.
CE 515 Railroad Engineering
Model Railroading Operations 101: Part 4 – Advanced Topics Seminar - Tom Crosthwait President, Mogollon & Southwestern RR & Fred Bock, MMR, Chief Dispatcher,
Operations on the BDMRR Dispatching for the Birmingham District Model RR.
STEP 1 ARRIVAL OF MERCHANDISE AND DOCUMENTATION The merchandise arrives at the broker's terminal on the U.S. side of the border. The commercial invoice.
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
Facility Authorization Basis at BNL Safety Photos of the Week Collider-Accelerator Department Take 5 for Safety.
Signal Basics. Signals: –Allow for safe operation of trains – protecting your train, other trains, and the equipment –Lets the railroad operate more efficiently.
Procedures Mrs. Hornsby’s Class.
Model RailRoad Manager Quick Start: Automated Traffic Generation.
Realistic Operations for Model Railroaders by R. B. Trombley, MMR PSR – NMRA Rev May, 2011.
TRAIN OPERATIONS IN THE GARDEN
1 Engineer Certification John Conklin – Program Manager, Locomotive Engineer Certification.
Clarendon, Texas May 28, 2002 Collision of Two Burlington Northern Santa Fe Freight Trains.
CRASH SCENE MANAGEMENT A partnership between the Oregon Department Of Transportation and the Oregon State Police.
Pedestrian rights and responsibility (a) Upon the immediate approach of an authorized emergency vehicle making use of an audible signal meeting.
CE 515x Train Acceleration, Deceleration, and Impact on Capacity Initial Instructions Work in teams of 2 - Get a new team mate (i.e., one who is not your.
Road Ranger Orientation. What is your Job or Scope of Services Move vehicles from travel lanes (disabled or involved in accidents). Unless injuries are.
What's inside a router? We have yet to consider the switching function of a router - the actual transfer of datagrams from a router's incoming links to.
Guidelines for Traffic Control at Surface Mines
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
CE 515 Railroad Engineering Armstrong Chapter 8: Railroad Operation – Moving From Here to There “Transportation exists to conquer space and time -”
ACACSO Car Service Rules 7 to 12 November 11, 2014.
CE 515 Railroad Engineering
Unit 6 Railroad Maintenance of Way Operations. Objectives List the common terminology associated with Railroad Maintenance of Way operations. Demonstrate.
Office of Railroad, Pipeline & Hazardous Materials Investigations Collision of Norfolk Southern Freight Train 192 With Standing Norfolk Southern Local.
CE 515 Railroad Engineering Unit-Train Operations Special Freight and Package Services Source: Armstrong Ch 14 & 16 “Transportation exists to conquer space.
CE 515 Railroad Engineering Communications & Signals Source: Armstrong Ch 7, AREMA Ch. 7 “Transportation exists to conquer space and time -”
CHAPTERS 1 and 2 o Advantages of Railroad Concept o Problems Early On o Economics Common Goal o Development of the Country o Common Goal CE 433.
Houston Trainwatch Working together to keep our city safe and moving Jack C. Hanagriff Houston Police Department Federal Railroad Administration Law Enforcement.
COPYRIGHT © AREMA : 1 of 21 Module 2: Train Operations.
Office of Railroad, Pipeline and Hazardous Materials Safety Performance of the UP Train Crew.
Stop Sign This is a traffic sign. This means to stop. It helps us be safe when driving.
A DAY IN THE LIFE OF A TRUCK DRIVER Or, How hard can it be?
Positive Train Control Labor Briefing Washington, DC December 10, 2008.
Unit 1 Introduction to the Railroad Industry. Objective Describe how a typical railroad company is organized and the function of each of its major departments.
Modeling the Interaction Between Railroad Freight Schedule Adherence and Asset Utilization Yan Dong* Joseph M. Sussman** Carl D. Martland** * Transport.
Transportation (CHAPTER 23). Over Half of Railroad Employees Run Trains—Over the Road, Yards/Terminals, and Local Crew Districts - Increased in Recent.
Land Transportation Systems
Operations Railroad Communica- tions Hazmat & Safety Personnel.
© 2012 Veritec Solutions Incorporated. All Rights Reserved. Potential Synergies from Positive Train Control Bruce Patty Vice President – Transportation.
Traffic Engineering Studies (Travel Time & Delay Studies)
Office of Railroad, Pipeline & Hazardous Materials Investigations Macdona, Texas Operations.
Sponsored by William W. Hay Railroad Engineering Seminar “ Canadian Rail Traffic Control Fundamentals ” Sean Robitaille Transportation Engineer CN Date.
Instructional Guide Transportation: Across the United States.
Director Rules and Field Support October 30, 2006.
Chapter 43 Emergency Vehicle Operations. © 2005 by Thomson Delmar Learning,a part of The Thomson Corporation. All Rights Reserved 2 Overview  Readiness.
CE 533 Introduction to Rail Transportation (4) Chapters 1 & 2 “Armstrong” Text.
Create a Detailed CTC Machine Model with JMRI/PanelPro Other Clinics in this series: Introduction to Layout Control with JMRI/PanelPro Repeated 4:00 PM,
THUNDERBIRD ACADEMY Building Tomorrow’s Leader Today.
August 2007 Team Riding Presentation Rider Education Division Team Riding Seminar.
1 PTC Update ACACSO May 2011 PTC Update ACACSO May 2011.
Learning from incidents: Ufton LC Near Miss ES LXA PICOP.
Authors Marshall Burgess, Everett Perry, and Kyle Weatherholt West Virginia Department of Transportation Progress of the Railroad Crossings Project at.
Negotiating Intersections Chapter 10. Intersections Tips for Identifying an Intersection o Street lights and signs. o Roadway markings, such as a stop.
1 BLUE SIGNAL PROTECTION Blue Signal Protection of Workmen This rule outlines the requirements for protecting railroad workmen who are inspecting,
MNM Fatal Powered Haulage Accident Powered Haulage Accident May 17, 2013 (New Mexico) May 17, 2013 (New Mexico) Underground Molybdenum Mine Underground.
Railroads and Industry After the union is restored, people decide to move west. –“westward expansion/manifest destiny” May 10, 1869 the west and east are.
CE2303 Railway Engineering
OVERVIEW: POSITIVE TRAIN CONTROL (ptc)
CE 533 Introduction to Rail Transportation (4)
Routing and Logistics Arc Routing 2018/11/19.
SAFE WORK INSTRUCTIONS
Transportation Innovation
SIGNS, SIGNALS, and MARKINGS
Presentation transcript:

CE 515 Railroad Engineering Line-haul Operations Source: Armstrong Ch 13 “Transportation exists to conquer space and time -”

Line-Haul Operations “To safely and efficiently conduct its line-haul operations a railroad must coordinate many otherwise independent activities across a rail network.” – Armstrong Ch. 13, pg 221 What does this mean?

Line-Haul Operations Communication Operational practices Safety Coordination

Line-Haul Operations We’ve already done this, so what?

Line-Haul Operations We’ve already done this, so what? Let’s see just how everything fits together.

Line-Haul Operations – We are going on a train trip, on our very own East- West Railroad from chapter 2. – Train: High-priority General Merchandise train H-CHINYC [What does this code mean?] – Where? Chicago to New York East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

Train schedule in database is activated to initiate operation The following happens: – “Crew Call System” identifies the crew to be called for duty – Locomotives are prepared by Dispatcher & Service Track Foreman. – Yardmaster and mechanical crews ready cars East & West RAILROAD Co. Line-Haul Operations Chicago New York Pick-up TWC ABS CTC

When ready, locomotives are connected to the “head end of the train.” Air brake system is charged and brake test performed. When ready and given the highball by Yardmaster and Dispatcher, train departs. Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

On the Steel Highway! When encounter “yard limits” along the way. – Main track controlled by track warrant or dispatcher authority – Is considered priority in yard limits, but must be prepared to stop within one-half of line of sight unless signal indicates otherwise Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

Most likely encountering CTC communications – Dispatcher has setup schedule so that the “Meets” and “Overtakes” are consistent with our priority level to other trains. – Can have priority change, if we are early, late, or cause early/late actions to other trains. [Even problems with the exceeding of Federal hours of service rules.] Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

As we are a general merchandise, might have to set out or pickup blocks of traffic requiring; – Head end crew movement on ground alongside of train – Additional brake tests, one for each time the train is broken up or added to – May result in delays or needed help from yard mechanical crew. Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

Enter upon ABS control, where ; – Must get dispatcher permission to enter the “current of traffic” – Once in, signal indication is first level of communication – IF moving on single train against signals, are moving “against the current of traffic”, a track warrant will dictate the movements and extra care must be exercised Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

If we happen to travel onto un-signalized territory, unlikely, but… Must operate in blocks on DTC or TWC Must obtain instructions and permission to travel within each and every block or “authority” Use of forms to document instructions Anything done in given “authority” must be documented and viewed carefully! Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

Beware! We might encounter a train defect. – If we encounter an automatic detection on hot bearings, dragging equipment, truck-curving performance, or wheel defects we must; – Result, delays and possible loss of priority! Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

Defects might be communicated from new system – AEI – Automated Equipment Identification, which reads computer chips that store information on cars, trailers, containers, locomotives, etc. – Railroad computers take any AEI notice, cross references to find out what train the offending item is on to report the defect to the crew. Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

We arrived! – Upon arrival, enter into destination yards to receiving yards – Crew or local hostlers will disconnect locomotives for servicing Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

Paperwork – Crew files reports including – If ending at home terminal, drive on home, – Otherwise lodging food and rest until next assignment back home. Line-Haul Operations East & West RAILROAD Co. Chicago New York Pick-up TWC ABS CTC

Review – Train operations to build the train – Communication systems to traverse the route – Train operations for en route changes – Actions for any defects or issues – End all operations with documentation Line-Haul Operations East & West RAILROAD Co.

Questions?