Project Execution Planning for Building Information Modeling (BIM)

Slides:



Advertisements
Similar presentations
Module 2.4 Workforce Transition Planning and Tool March
Advertisements

BIM EXECUTION PLANNING PROCESS
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Project Scope Management
BIM Sarah Birchall and Jo Harris 25 th September 2014.
Welcome.. Guide Continue Welcome to the BIM Execution Planning Guide Tool. When prompted, please provide the appropriate information. If there are questions.
Chapter 5: Project Scope Management
Chapter 5: Project Scope Management
Model Procurement Documents for Architectural Services [NAME] [PLACE] [DATE]
BIM Overview. B uilding I nformation M odeling What does BIM Stand For?
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
The BIM Project Execution Planning Procedure
Project Execution Planning for Building Information Modeling Meeting #8 – April 24 th, 2009 A buildingSMART Alliance project sponsored by: The Charles.
Project Execution Planning for Building Information Modeling
Project Execution Planning for Building Information Modeling A buildingSMART Alliance project sponsored by: The Charles Pankow Foundation Construction.
1 Configuration Management 101 ITS Professional Capacity Building Program T3 Webinar February 21, 2008.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
Project Execution Planning for Building Information Modeling A buildingSMART Alliance project sponsored by: The Charles Pankow Foundation Construction.
What is Business Analysis Planning & Monitoring?
OSIAM4HE Proposed org structure Authored by the strategy and organization team.
Project Management Phases Class 6. Initiation & Planning – Agenda Overview of the project management phases Midterm paper details.
Construction Specifications
Project Execution Planning for Building Information Modeling (BIM) Project Execution Planning for Building Information Modeling (BIM) STEP-BY-STEP GUIDE.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Project Execution Planning for Building Information Modeling
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Best Practices By Gabriel Rodriguez
Understanding ISO 22000:2005 TCISys.com.
Construction Work Packaging
ISO 9001: 2000 Certified Audit Process What to do.
Chapter 5: Project Scope Management Information Technology Project Management.
SacProNet An Overview of Project Management Techniques.
Project Life Cycle.
Formats ACT 380.
Public Health Reporting Initiative Stage 3 Sprint: Implementation Guide Development Phone: x
Preliminary Project Descriptions/Outline Specifications
Project Execution Planning for Building Information Modeling Progress Meeting #2 – July 29 th, 2008 A buildingSMART Alliance project sponsored by: The.
Chapter 3 Strategic Information Systems Planning.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
PROJECT NAME EMPIRE BELT(S) Month Day, Year. 2 Agenda Lean Overview Introduction to the Project & Team The Process Next Steps.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
CISB113 Fundamentals of Information Systems IS Development.
Project Execution Planning for Building Information Modeling (BIM)
State of Georgia Release Management Training
ESSRT In-Process Review September 10, Agenda 1.Work Completed Till Date 2.Scope of future activities and deliverables 2.
Overview PRINCE Hogeschool Rotterdam. 2 Project definition  A project is a temporary organization that is created for the purpose of delivering.
The Project Concept Phase - Concept Report Requirements Presented by the Georgia Department of Transportation Roxana Ene – LCI Coordinator
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
Brittany Giel University of Florida Ph.D. Candidate Center for Advanced Construction Information Modeling January 8, 2013 Measuring Success - Metrics.
CDM Construction Design and Management
BIM & FM in Hong Kong Public Rental Housing Projects.
Prepared by: Adam Pugh May 10-12, 2016 FIMS/RE Annual Training.
Dana K “Deke” Smith FAIA Birgitta Foster Executive Director Assisting Director buildingSMART alliance 1.
Construction Work Packaging
Workforce Administration Scenario Overview
New project request process training
Project Execution Planning for Building Information Modeling
UW T2O = Transition to (Sustainable) Occupancies
BIM EXECUTION PLANNING PROCESS
Data Architecture World Class Operations - Impact Workshop.
EXTRA SLIDES.
BIM EXECUTION PLANNING PROCESS
CLINICAL INFORMATION SYSTEM
USNRC IRRS TRAINING Lecture18
Introduction DEFINATION :-
The emphasis of Construction Management and Preconstruction Services in the AEC industry Preconstruction Services Construction Management.
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
CIC BIM Competition Presentation Template & Content Guide
Presentation transcript:

Project Execution Planning for Building Information Modeling (BIM) STEP-BY-STEP GUIDE OVERVIEW

BIM Project Execution Planning Overview The Building Information Modeling (BIM) Project Execution Planning Procedure is a structured method consisting of four (4) steps to create a strategy for BIM implementation throughout a building’s lifecycle.

BIM Project Execution Planning Procedure Identify BIM Goals and Uses Use project and team characteristics to determine BIM Goals and Uses for the Project Design BIM Project Execution Process Develop a process specifically tailored to the project which includes tasks supported by BIM showing the information exchanges between processes Define Information Exchange Requirements Define the parties responsible, grouping requirements, and timeframe for each information exchange Develop BIM Project Execution Plan Develop a detailed plan and procedure for each use and the information flow between parties

Step 1: Identify BIM Goals and Uses Goal: Identify the appropriate BIM goals and Uses based on value added objectives (Lean Principles) When: 1st BIM Planning Meeting Responsible Parties: BIM Project Team (Owner, Architect, Engineers, Contractor(s), Facility Manager) Resources: BIM Goal and Use Selection Worksheet helps identify project BIM goals for each project phase BIM Ex Wiki provides information on each BIM Use helpful for the selection process

BIM Goal and Use Selection Template BIM Goals Worksheet Priority (1-5) Goal Description Potential BIM Uses 1 - Very Important Value added objectives   2 Increase Field Productivity Design Reviews, 3D /MEP Coordination 1 Increase effectiveness of Design Design Authoring, Design Reviews 3 Accurate 3D Record Model for FM Team Record Model, 3D Design/MEP Coordination Increase effectiveness of Sustainable Goals Engineering Analysis, LEED Evaluation BIM USE Selection Worksheet   Responsible Parties BIM Uses per Phase Desire to Implement (Y/N/Maybe) Lead Team Member Addt'l Team Members Experience Level (1-5) 5=High Process Map Available? Comments Operations Phase Record Model Y Contractor 3 N MEP Subs 2 Responsible for As-Built Model / Info FM 1 Provide input on information required Building System Analysis Building Maintenance Scheduling

BIM Uses – Identified through interview process

BIM Project Execution Planning Wiki

Step 2: Design BIM Project Execution Process Goals: Create an overview map of the BIM Project Execution Procedure Create Project Process Maps for each BIM Use identified in Step 1 When: 2nd Initial BIM Planning Meeting Responsible Parties: Lead Team Members responsible for creating each Project Process Maps Resources: Template Process Maps of each BIM Use are available for a starting point for team members

Two Levels of Process Maps Required A high level process map that outlines the various BIM uses in the different phases and information exchange that bind them. Level 2 The template process maps created can then be taken to develop project specific process map, tailored to the process at hand. Please click here for an example of each Map

Step 3: Define Information Exchange Requirements Goal: Define the information exchange requirements identified in Step 2: Define the information exchange Identify the responsible parties Define the grouping requirements Identify the timeframe for each exchange When: 2nd BIM Planning Meeting Resources: Information Exchange Requirements Worksheet identifies the vital information required to implement each BIM Use as described above

Model Elements Utilizing CSI UniFormat Information Exchange Requirements Template Information Exchange Requirements   D1: Design Model D2: Coordination Model Template Map: Design Coordination File Format Revit *.rvt Navisworks *.nwd Model Elements Utilizing CSI UniFormat Information Grouping Responsible Party A Substructure A10 Foundations A1010 Standard Foundations Building Level A/E B Element A1020 Special Foundations TC A1030 Slab on Grade A20 Basement Construction A2010 Basement Excavation A2020 Basement Walls Shell B10 Superstructure B1010 Floor Construction B1020 Roof Construction B20 Exterior Enclosure B2010 Exterior Walls B,E B2020 Exterior Windows B2030 Exterior Doors B30 Roofing B3010 Roof Coverings B3020 Roof Openings C Interiors C10 Interior Construction C1010 Partitions C1020 Interior Doors C1030 Fittings C20 Stairs C2010 Stair Construction A,E C2020 Stair Finishes E C30 Interior Finishes C3010 Wall Finishes C3020 Floor Finishes C3030 Ceiling Finishes

Step 4: BIM Execution Plan Development Goal: Develop a project specific BIM Execution Planning Document. When: Upon completion of 3rd BIM Planning Meeting Responsible Party: BIM Project Team Resources: BIM Project Execution Plan Document Template

BIM Project Execution Plan Categories Identify BIM Goals and Uses Design the BIM Project Execution Process Define Information Exchange Requirements Develop BIM Project Execution Plan Project Goals / BIM Objectives BIM Process Design BIM Scope Definitions Delivery Strategy / Contract Organizational Roles and Responsibilities Communication Procedures Technology Infrastructure Needs Model Quality Control Procedures Project Reference Information Project X BIM Execution Plan

Case Study Meeting Agenda Meeting 1 - BIM Goals and Use Identification Meeting Meeting 2 - BIM Process Design Meeting Meeting 3 - BIM Project Execution Plan Review Meeting

Discussion Comments on Procedure Request for Case Study Document Meeting Structure Timeline Distribution of Request for Case Studies Potential Case Studies