Diversion Systems in the WDB and NHD March, 2012 Source: Getty Images Karen Hanson, U.S. Geological Survey Kristiana Elite, U.S. Geological Survey Keith.

Slides:



Advertisements
Similar presentations
Introduction to Hydraulic Engineering – CEE3420
Advertisements

Water Sustainability: The History of Water Sustainability
Chapter 9 Water Resources.
Providing Geography for Topology; A Schematic View of the National Watershed Boundary Dataset (WBD) James E. Mitchell, Ph.D. IT GIS Manager Kurt L. Johnson.
Updating the National Hydrography Data for the Twin Cities with Local Subsurface Drainage Information NHD Stewardship Conference Lakewood, Colorado April.
Lost Creek Basin Aquifer Recharge and Storage Study Presented to: 2013 GSA Annual National Meeting October 27, 2013 Ralf Topper – Colorado Div. of Water.
Groundwater Management Districts Association
Governor Napolitano’s Listening Tour2004 Water Management Within Active Management Areas.
Preparing for the Rainy Season SFWMD Operations & Actions.
Water Use and Resources in Arizona – Part 1 Role Playing Project.
Unintended Consequences due to Salinity Management – Example from the Lower Colorado River Multi-State Salinity Coalition 2012 Annual Conference January.
California Recycled Water Plan California Recycled Water Plan A comprehensive approach to California’s long-term water supply By Gregory B. Ryan and Meagan.
Working with Irrigation Entities in Idaho Presented by Linda Davis Date March 2012.
What are some ways people use water? About 70% of the Earth’s surface is covered with water. Over 96% of all the water is salt water.
National Hydrography Data Use and Applications.
Engineering Hydrology (ECIV 4323)
Water in California: Self-induced Scarcity Waterscape International Group.
‘The world’s greatest plumbing system’ An example of how a river is managed to use its water as a resource.
United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.
Making the Linkage Between Water Management & Planning Rita P. Maguire, President and CEO ACMA 2006 Summer Conference July 27, Tucson, AZ.
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
The Water Plight of Phoenix Sean McMorris, Jimmy Svigos, Ki Hoon Kim, Griffin Leahy, Filaree Moore.
Use of GIS in Determination of the Probable Maximum Flood at Nuclear Plant Sites Presented by: Monica Anderson, GISP Tennessee Valley Authority Carrie.
10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt
Water Use and Management WHO – 1,000,000,000+ people lack access to fresh water 10,000,000+ people die annually from water- related diseases.
Hydrologic Cycle. Hydrologic Cycle Processes Surface Water Soil water Atmospheric water Groundwater Processes Precipitation Evaporation Surface Runoff.
Introduction to Water Law & the Central Arizona Project (CAP)
Coordination of Indiana GIS through dissemination of data and data products, education and outreach, adoption of standards, and building partnerships Using.
Presentation prepared by: Toni Crosby Antoinette Aguirre Mike Belanger Beata O’Brien.
August 20th, CONTENT 1. Introduction 2. Data and Characteristics 3. Flood analysis 1. MOUSE 2. SOBEK 3. ARC-SWAT 4. Conclusions and suggestions.
Water Resources G. Tyler Miller’s Living in the Environment 13 th Edition Chapter 14 G. Tyler Miller’s Living in the Environment 13 th Edition Chapter.
Where is fresh water found? What are some California water sources?
Introduction National Hydrography Dataset Plus (NHDPlus) Version 2.
GIS in Watershed Analysis. Why watershed Analysis with GIS? Concepts Important datasets Analysis Tools.
Introduction to the National Hydrography Dataset InterMountain GIS 2014 NHD Workshop April 7, 2014 Many slides and figures in this presentation were adapted.
Chapter 9 Water Resources. Usable Water is Rare  Agriculture- the largest use of water around the world. Agriculture, Industry and Household Needs.
Water Resources 101 Arizona’s Water: Supplies and Usage.
What drives California Water Issues? Water does not occur when and where needed Conflicts between Urban, Agricultural, Environmental needs Precipitation.
Outline 1.Introductions 2.What is the NHD? 3.Why is it important to Tribes?
Irrigation and the Colorado River. From the University of Georgia (
U.S. Department of the Interior U.S. Geological Survey Groundwater Study For Malad and Bear Rivers Drainages, Box Elder County Bear River Water Conservancy.
Analytic Vs Numeric Ground Water Models Ray R. Bennett, PE Colorado Division of Water Resources.
South Platte Decision Support System Colorado Water Conservation Board and Division of Water Resources.
U.S. Department of the Interior U.S. Geological Survey Processing ArcHydro Datasets with NHDPlus Version 2, Emphasizing StreamStats Data Development Webinar.
NHD Tools for the Evaluation of Watershed Condition and Management Performance Authors: William Cooter (presenter) Peter Ilieve. Tim Bondelid Mark Bruhn.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Collecting, Processing and Distributing of Water Statistics in the Republic of Belarus Zhanna Vasilevskaya, Belarus International Work Session on Water.
Water resources engineering Giannis Kleopa. What is a water resources engineering? Water resources engineering is the profession that is responsible for.
Governor Napolitano’s Listening Tour2004 Water Management Within Active Management Areas.
NHD/WBD Geodatabase Stewardship Conference April 16, 2009 Jeff Simley, USGS Karen Hanson, USGS Stephen Daw, USGS.
Reservoir Development Update Region K Meeting July 11, 2012 Karen Bondy, P.E. Manager of Resource Strategy 1.
California Water Briefing APRIL 2006 Department of Water Resources.
II. How do societies exploit their water resources? A. Hydraulic infrastructure – Wells (pumping underground water) – Dams (storing water) – Canals (transporting.
15.4 Human Influences on the Hydrologic Cycle Runoff and the infiltration rate are greatly influenced by human activity. A major concern in many urban.
Metropolitan Council Water Supply Planning in the Northwest Metro Water Availability Technical Focus Group : June 9, 2008 Lanya Ross Senior Environmental.
Modeling with WEAP University of Utah Hydroinformatics - Fall 2015.
HYDROLOGY AND WATER RESOURCES ENGINEERING PARUL INSTITUTE OF ENGINEERING & TECHNOLOGY. Semester:- 5 th Branch:- Civil Engineering.
Bdsfbdsfb NHDPlus for Corpus Christi Bay Term Project Report Nishesh Mehta Nishesh Mehta 21 st November st November 2006.
A Mass Balance Approach to Evaluate Salinity Sources in the Turlock Groundwater Sub-basin Presentation to Technical Advisory Committee, Central Valley.
Water Resources Engineering-I Outline
Where? The Colorado River
Tucson’s Water Supply.
Chapter 9 Water Resources.
HUMAN IMPACT FROM CLIMATE CHANGE
San Diego Water Resources
Hydrological Feature coding
Lifting Water, Falling Water: Energy Balance of the Colorado River
Update on WFD feature coding
Supply & Demand Approach— CAP:SAM
Spatial & Temporal Analysis of Groundwater Level Response to 2014 Environmental Pulse-Flow to the Colorado River Delta Stephanie Arnold.
Presentation transcript:

Diversion Systems in the WDB and NHD March, 2012 Source: Getty Images Karen Hanson, U.S. Geological Survey Kristiana Elite, U.S. Geological Survey Keith Larson, U.S. Natural Resources Conservation Service

Overview Diversions in NHD Modification field changes to WBD Purpose of NHD/WBD diversions project NHD/WBD Diversion comparison Central Arizona Project-pilot Acquiring diversion data

Overview Diversions in NHD Modification field changes to WBD Purpose of NHD/WBD diversions project Central Arizona Project-pilot Acquiring diversion data

Overview Diversions in NHD Modification field changes to WBD Purpose of NHD/WBD diversions project Central Arizona Project-pilot Acquiring diversion data

Overview Diversions in NHD Modification field changes to WBD Purpose of NHD/WBD diversions project Central Arizona Project-pilot WBD vs. NHD diversion comparison Acquiring diversion data

Overview Diversions in NHD Modification field changes to WBD Purpose of NHD/WBD diversions project Central Arizona Project-pilot Acquiring diversion data

What is a Diversion? Engineered structure Withdrawal conveyance Receiving damcanal, pipeline reservoir, treatment plant Water rights Wind River Diversion Dam. Source: Wikipedia

Composition of a Diversion Canals Underground Pipelines Dams Water Treatment Plants Reservoirs Pumping Station NHD

Points, Lines, and Polygons Canals Underground Pipelines Dams Water Treatment Plants Reservoirs Pumping Station NHD

Conveyance Features: Pipelines Source: Getty Images Underground Underwater Elevated At or near surface Aqueduct Siphon Penstock NHD

Withdrawing / Receiving Points Withdrawals Colorado River Aqueduct Colorado River Aqueduct Central Arizona Project Aqueduct (CAP) Central Arizona Project Aqueduct (CAP) Withdrawals Parker Dam NHD

Trans - Basin Diversions 4-digit (Subregion) 2-digit (Region) 8-digit (Subbasin) WBD

Modification Field - Change Reasons to change the way WBD Modifications were reported: Lines and polygon modifications both were carried on the polygon label. Line modifications should be on the lines! 27 options were available on poly….now 15 line, and 16 poly Many of the items reported were in duplication with what NHD carries Interpretation of Modification fields were inconsistent across the nation Redundant to track at both the 10- and 12-digit hydrologic unit WBD

Modification Field Options – Version 1.0 Standards WBD POLYGON MODIFICATION OPTIONS AD Aqueduct BC Barge Canal or Navigation Canal CD Channel Diversion DD Drainage Ditch DM Dam at Outlet GC General Canal/Ditch GF Ground-Water Flow GL Glacier ID Irrigation Ditch IF Ice Field IT Interbasin Transfer KA Karst LALava MA Mining Activity NC Noncontributing Area NM No Modifications OC Overflow Channel or Flume OFOverbank Flow OT Other PD Pipe Diversion PS Pumping Station RS Reservoir SC Stormwater Canal or Drainage Canal SD Stormwater Ditch SI Siphon TFTransportation Feature UA Urban Area

Modification Field Options – V 3.0 Standards WBD LINE MODIFICATION OPTIONS AW Artificial Waterway DMDam at Outlet LALava LELevee MA Mining Activity NM No Modifications OC Overflow Channel or Flume OFOverbank Flow PD Pipe Diversion PLPlaya PS Pumping Station SISiphon SLShoreline TFTransportation Feature UA Urban Area POLYGON MODIFICATION OPTIONS AW Artificial Waterway GFGroundwater Flow GLGlacier IFIce Field KAKarst LALava Field MA Mining Activity NC Noncontributing Area NM No Modifications OC Overflow Channel or Flume OFOverbank Flow PD Pipe Diversion RCReceiving RSReservoirPlaya UA Urban Area WDWithdrawal * WBD will carry a new flow table providing linkage between the RC Receiving and WD Withdrawal

RC Receiving A hydrologic unit that receives diverted water

WD Withdrawal A hydrologic unit from which water is diverted

Modifications Applied-Before WBD

Modifications Applied-After WBD AW,UA NM AW,UA UA AW LE TF LE AW,UA TF LE UA LE

Purpose Provide the nation a single and comprehensive understanding of how water is diverted in the U.S. Exploit already available knowledge in the WBD and NHD, but more fully develop and populate the structure that we have, and acquire the information that is still needed Delivery-A Web Service that offers the public easy access, and a more sophisticated system for the scientist A user can select on a “Receiving” or “Withdrawing” hydrologic unit and navigate up or downstream and see the connectivity, and relationship to the NHD Goal to implement this nationwide

Central Arizona Project (CAP) Phoenix Tucson Colorado River Central Arizona Project Aqueduct 336 miles 1.5 milllion acre/ft a year 336 miles 1.5 milllion acre/ft a year

Two Complementary Approaches NHD WBD Phoenix Tucson Colorado River

Two Complementary Approaches NHD WBD Conveyance Location Path and geometry of diversion Phoenix Tucson Colorado River

Two Complementary Approaches NHD WBD Conveyance Location Path of diversion Points of withdrawal / receiving Phoenix Tucson Colorado River

Two Complementary Approaches NHD Conveyance Location Path of diversion Points of withdrawal / receiving WBD Hydrologic Unit Phoenix Tucson Colorado River

Two Complementary Approaches NHD Conveyance Location Path of diversion Points of withdrawal / receiving WBD Hydrologic Unit Withdrawal / receiving units (flow table) Phoenix Tucson Colorado River

Phoenix Tucson Colorado River Two Complementary Approaches NHD Conveyance Location Path of diversion Points of withdrawal / receiving WBD WD RC Hydrologic Unit Withdrawal / receiving units (flow table) Modification fields NHD WBD

Inter-Basin Transfer Flow Table

CAP Overview

1 WD (at Colorado River) Many RC (along CAP Canal) WBD Coding Overview Coding in WBD has been simplified, and is also more useful in understanding where water is going

First option for collection of data = CAP (actual entity) Data provided from CAP => turnouts, recharge facilities, flumes, and much more Secondary option is the water consumers (i.e. municipalities, tribes, irrigation districts) Data Collection

CAP Receiving can be categorized into 4 types of water use CAP Turnouts Turnouts are most useful in determining RC from CAP

Agriculture

Municipal

Recharge

Tribal

Imagery – The third option

Diversions in NHD / WBD are Important! Colorado River Photo courtesy of Jonathan Waterman

Contact Information: Karen Hanson: Kristiana Elite: Keith Larson: Thank You