Tranlation: EASL’s Average Daily Traffic Time or Traffic Pavement Condition Index 100 0 Pavement Performance Pavement Condition High Performance Intersections.

Slides:



Advertisements
Similar presentations
Pavement Rehabilitation Method
Advertisements

Construction and Testing of Construction Cycle 2 (CC2) Overlay Murphy Flynn FAA Airport Technology R&D Branch, AAR-410 William J. Hughes Technical Center,
Design and Construction Guidelines for Thermally Insulated Concrete Pavements Lev Khazanovich, UM John Harvey, UCD Joe Mahoney, UW September 12, 2007.
1 Preserving Municipality Roadways Federal = 3% State = 20% Local = 77% 94% of paved roads have an Asphalt surface FHWA Source: Stephen R. Mueller,
HMA Design (Surface) The surface course is the layer in contact with traffic loads and normally contains the highest quality materials. It provides characteristics.
Project TX Strategies to Improve and Preserve Flexible Pavement at Intersections UTEP - Soheil Nazarian - Imad Abdallah Project Duration September.
Michigan Department of Transportation Perpetual Pavement Rep. Rick Olson’s 2012 Best Practices Conference on Road and Bridge Maintenance Curtis Bleech.
Perpetual Pavements Concept and History Iowa Open House
Full-Depth Reclamation Using a Cement Slurry Spreader Attached to a Ready Mixed Concrete Truck W. Spencer Guthrie, Ph.D., Associate Professor Charles A.
No. 18 of 19 Geosynthetics in Asphalt Pavements by Prof. S.F. Brown FEng University of Nottingham The information presented in this document has been reviewed.
PPTG Thin Overlays Task Group (TOADS) Team Overlay Asphalt Debaters Presented by Basem Muallem (CT) - Tony Limas (Industry) April 19, 2005.
The Rehabilitation Solution for Alabama’s Concrete Pavements
Bituminous Street Recertification Initiatives. Initiative Items n Stone Matrix Asphalt (SMA) n Longitudinal Joint Spec and other methods for longitudinal.
Guide for Mechanistic-Empirical Design of New and Rehabilitation Pavement Structures By Matt Mason.
Pavement Analysis and Design
Presented by Matthew J. LaChance Pavement Solutions for State, County, and Municipal Infrastructures.
PRACTICAL AIRPORT PAVEMENT M&R MANAGEMENT Y. Hachiya & M. Kanno Service Center of Port Engineering Tokyo, JAPAN 1 FAA Airport Pavement Working Group Meeting.
Uniform Paving Platform A Contractor’s Perspective J. Brent Moore Regional Manager Branscome, Inc. - Richmond.
HMA Construction Program
1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State.
PAVEMENT CONDITION SURVEYS Lecture 4. Instructional Objectives n Need for condition surveys n Collection methodologies n Four basic types of condition.
Warm Mix for a Cold Climate Colorado DOT’s 2007 WMA Project.
PCC Overlays of HMA Pavements
Session 3-6 HMA Overlays.
Asphalt Quality Assurance Program
Pavement Maintenance II
Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.
Pavement Distresses Flexible Pavement
Extending Asphalt Pavement Life Using Thin Whitetopping Mustaque Hossain, Ph.D., P.E. Department of Civil Engineering Kansas State University.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Performance & Distress of Flexible Pavement Serviceability/Performance Concept.
Overview of the New Hot Mix Specifications Dale A. Rand, P.E. TxDOT Construction Division Flexible Pavements Branch TRB AFK10 Committee Meeting April 20-21,
Concrete Pavements The Right Tool for The Right Job.
Influence of Pavement Condition on Project Selection
PAVEMENT MAINTENANCE 1:
Research Findings from the NCAT Test Track APAI Winter Conference Indianapolis, December 14, 2010.
April 19, 2005 PPTG Meeting Education Efforts for the PPTG How to share our knowledge and experience with others.
February 1, Analysis of Test Slab Failure Data David R. Brill FAA Airport Technology R&D Branch, AAR-410 William J. Hughes Technical Center, Atlantic.
Technical Services By Nathan Haaland.  Increase in Construction Costs  Asphalt  $350 to $735 per ton  Labor  3.6% increase  Inflation  13% increase.
LTPP Lessons Learned: Delaware SPS-2 Wednesday April 9, 2014 SPS-2 Tech Day, Dover, DE Gabe Cimini Project Manager, LTPP North Atlantic Regional Support.
HBP Warranties – The Cost Benefit Evaluation Begins By: Jay Goldbaum, P.E. Colorado Department of Transportation Pavement Management and Design Program.
Project TX Strategies to Improve and Preserve Flexible Pavement at Intersections UTEP - Soheil Nazarian - Imad Abdallah - Carlos Solis Project Duration.
1 Hot-Mix Asphalt and Flexible Pavement Design: the MEPDG Kevin D. Hall, Ph.D., P.E. Professor and Head, Dept. of Civil Engineering University of Arkansas.
2003 Warranty Presentations Caltrans WARRANTED HMA PAVEMENTS PAVEMENTS.
Session 4 Preventive Maintenance Treatments. Learning Objectives 1.Identify typical preventive maintenance techniques used on HMA and PCC pavements 2.Identify.
Harold L. Von Quintus, P.E., ARA Jagannath Mallela, ARA
Continuously Reinforced Concrete Pavement
Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association.
Feng Hong, PE, PhD, TxDOT Darhao Chen, PE, PhD, TxDOT September 16~19, 2013, RPUG Meeting, San Antonio, TX USE GROUND PENETRATING RADAR TECHNOLOGY TO EVALUATE.
Using Reflective Crack Interlayer-
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
Russian Engineers Training March 2011
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
Construction and Performance Evaluation of Roller Compacted Concrete under Accelerated Pavement Testing TRB Paper No: Moinul Mahdi Zhong Wu, PhD.,
Thin Hot Mix Asphalt Overlays PennDOT Research Findings
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Phase I Experiment 4 Different pavement structures, 8 sections Compare
Research Implementation WHRP Flexible Group
Uniform Paving Platform A Contractor’s Perspective
Presenters: Sumon Roy1 and Badrul Ahsan1
HIGHWAY MAINTENANCE Failures in flexible pavement.
Surface Preparation before laying Hot Mix
Pavement condition index calculation
Update on the current APT Project in Texas
Pavement Design  A pavement consists of a number of layers of different materials 4 Pavement Design Methods –AASHTO Method –The Asphalt Institute Method.
Introduction to Pavement Design
Pavement Overlay Design
Presentation transcript:

Tranlation: EASL’s Average Daily Traffic

Time or Traffic Pavement Condition Index Pavement Performance Pavement Condition High Performance Intersections

Pavement Condition Reactive Maintenance Time or Traffic Pavement Condition Preventive Maintenance High Performance Intersections

Condition (PCI) Time Rehabilitation >$10.00/SY Reconstruction >$$$$ High Performance Intersections

The Challenge Slow moving or standing loads subject pavements to higher than normal stress conditions High-stress locations also include Climbing lanes Truck weigh stations Rest areas Other slow-speed areas High Performance Intersections

The Challenge Special attention to these areas can ensure that high-stress areas deliver the same outstanding performance as other asphalt pavements. High Performance Intersections

The Challenge Compounding factors: Increasing: –Traffic volumes –Percentage of trucks –Maximum loads –Tire pressures Super single tires Decreasing –Revenues It’s not just initial cost Full Service Life –Loss of experienced personnel Smaller staffs Work together ensure success High Performance Intersections

Have a Strategy Recognize: Intersections may need to be treated differently than posted-speed pavements. High Performance Intersections

Form a team of local experts –Owner/Agency –Industry –Academics Assess the problem Ensure structural adequacy Confirm the materials, mix design, & quality control Practice proper construction techniques High Performance Intersections 5-Point Strategy

Condition Assessment Identify type / extent of pavement distress –Visual survey –Sampling and testing –Trenching Determine cause(s) of distress –unstable mixture –base failure –consolidation by traffic High Performance Intersections

Trenching Reveals the type and vertical extent of deformed layers Define limits distress –GPR –Cores Replace all deformed layers High Performance Intersections

Permanent Deformation

Rutting in Subgrade or Base original profile Weak Subgrade Or Underlying Layer asphalt layer subgrade deformation High Performance Intersections Fatigue cracking

Plastic Flow original profile shear plane Weak Asphalt Layer High Performance Intersections

Rutting in Asphalt Layer original profile Wheel path consolidation Inadequate Compaction High Performance Intersections

Ensuring Structural Integrity Structural Capacity to meet traffic needs –Existing pavements Evaluate structural capacity of in-place material Remove/replace any weak or failed areas –New Pavement Structure must be able to support present and future loads Mechanistic Design Software –Asphalt Institute –AASTHO’s MEPDG High Performance Intersections

Selecting Materials High Performance Materials Evaluate local aggregates for economics Supplement with imported aggregates –Full replacement may be necessary Additional testing –Hamburg wheel –Field test strips High Performance Intersections

Construction Best Practices Avoid segregation –Physical –Thermal –Use Material Transfer Vehicle Longitudinal Joints –Best Practices Synthesis; AI coop agreement w/FHWA –Soon to be published, plus a 4hr seminar Achieve target density –Density gauges to set rolling patterns and confirm –Intelligent Compaction High Performance Intersections

WA DOT Study

Poor Construction Practices High Performance Intersections

Form a team of local experts Assess the problem Ensure structural adequacy Confirm the materials, mix design, & quality control Practice proper construction techniques High Performance Intersections 5-Point Strategy

Three Case Studies High Performance Intersections

PAVED WITH REGULAR MIX, AGE 2 YEAR City of Indianapolis

Replacement Project 2 years old

High Performance Intersections Replacement Project 12 years old

Case Study Maryland U.S. 40 & Rt. 213 Elkton, Maryland 1994

Rt ,900 ADT U. S ,200 ADT (12%)

Rutting on a yearly basis

Determine depth of rutting !

2-Lifts 25 mm SMA

1-Lift 19 mm SMA

10/98

July 2000 Removing pcc

July 2000 Replacing pcc w/ SMA

High Performance Intersections 18 years later Minor ¼ inch Ruts L/T Joint distress Reflective Cracking

Background IDOT mill one year & fill the ruts the following year 1998 Rehab established an Evaluation Team –“Tough Mix Team” High Performance Intersections

Excavation (not Exploration)

Evaluation Lower layers were plastic deformation Prior repairs left in place Last overlay was SMA –Consistent thickness –Deformed plastic mix. High Performance Intersections

Material Selection

High Performance Intersections

Williams & Margaret in Thornton, IL 14 years later

Build a team to work through the details

High Performance Intersections Asphalt Institute Asphalt Pavement Alliance

Thanks! Wayne Jones, PE Senior Regional Engineer