If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.

Slides:



Advertisements
Similar presentations
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Advertisements

Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
U.S. Department of the Interior U.S. Geological Survey.
A Highway Corridor Planning Process for NEPA Compliance Using Quantm Goose Creek Canyon Bypass Case Study A Unique Approach to Corridor Planning.
Planning for Success: Applying Systems Engineering to ASCT Implementation TRANSPO 2012 October 29, 2012 Eddie Curtis, PE FHWA Office of Operations / Resource.
Video Remote Interpreting Services
Idaho Transportation Department Karen A. Strauss, P.E. Pavement Management Engineer.
January 31 st, 2012 North Coast Corridor A Better Environment for the Future.
1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.
Evaluating Decision Support Systems Projects. Who Evaluates Technical Managers  Chief Information Officer,  Corporate IT professionals,  Database administrators,
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session # 12.
Chapter 13 Site Plan Layout.
Trimble  Quantm  Haul Road Optimization Presenters Name.
MADALINA CROITORU Software Engineering week 1 Madalina Croitoru IUT Montpellier.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
SCC & Leica  Import total station survey, GPS, traverse, levelling and GIS data direct from all Leica instruments.  In built Grid Inquest for GPS reduction.
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
LS Engineering Associates Corporation LS Engineering Associates Corporation CORPORATE PORFILE Engineering Services ■ Bridge Inspection ■ Bridge Design.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
Consulting Trends and the Design Process. Fundamental activities conducted by consulting firms Winning work Doing work Managing work Managing business.
Construction Category Management Planning Version 1.1 (May 2015)
Economic Analysis: Applications to Work Zones March 25, 2004.
Atrium Fire Protection
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
TEA, Portland, Maine Travis Koestner Missouri Department of Transportation October 20, 2006 Alternate Paving Update $$ Cost Control at MoDOT $$
Adopting a Whole-of-Nation Approach to a Sustainable, Multi-GNSS Enabled National Positioning Infrastructure John Dawson and Gary Johnston.
Decision Making: Relevant Costs and Benefits
Bentley Civil - What Users Say “Track design for a stretch of 8 Km which used to take more than 6 months, was completed in less than 3 months with solutions.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Project.
The Web-based budgeting and planning solution from FRx Software Photo: DigitalVision Jim Boyer, Sr. Consultant
PowerSHAPE developments Sian Humphreys Business Development Manager Delcam plc.
1 Content 1.Summary of the Korea High Speed Railway Project 2.EIA System in Korea 3.Limits of Present EIA System 4.Tasks for the Betterment Content 1.Summary.
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Alternate Technical Concepts AASHTO Subcommittee on Design July 28, 2010 Columbia, S.C. KATHY HARVEY State Design Engineer Missouri Department of Transportation.
Fast-Answers.Com Limited Junction Capacity Software to Facilitate Efficient Design.
Mass Highway Department (MHD) Design Process Anticipate possible use of MHD funds Anticipate possible use of MHD funds New Design Guide for Project Development.
Chapter 16: Product Design and Manufacturing
© G. A. Motter, 2006, 2008 & 2009 Illustrated by Examples Quality Function Deployment and Selection Matrices Customer Driven Product Development.
Technical Specifications for Monitoring Ground Displacements at a National Highway Project K. Lakakis, P. Savvaidis and I. Ifadis Laboratory of Geodesy.
Risk Management on Tunnelling Projects Warwick University MSc course
The Next Generation ROI: Automated Workflow & Supply Chain Management Damian Scattergood.
Salt Lake City – Las Vegas High Speed Rail – Alignment Study Student Engineering Associates.
GIS & Quantm 2005 Statewide GIS Conference March 10, 2005.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Project.
SoftwareServant Pty Ltd 2009 SoftwareServant ® Using the Specification-Only Method.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION Spring 2016.
Roadway Data Extraction Technical Assistance Program (RDETAP) Robert Pollack October 25,
Software Requirements Specification. Requirements Specification: An Overview Basic goal: To understand the problem as perceived by the user. Activities.
TALKING FREIGHT SEMINAR: Truck Separated Lanes/Truck Tolling MARCH 16, 2005 DARRIN ROTH DIRECTOR OF HIGHWAY OPERATIONS AMERICAN TRUCKING ASSOCIATIONS.
WP 17.1 Civil Engineering Platform height / vs option Status on M. Manfredi on behalf of WP17.1 team.
1 Tunnel –v- Surface Routes A UK perspective from Alan Dyke Former MD Channel Tunnel Rail Link Project.
BRIDGES, TUNNELS AND UNDERPASSES
Bridges Reach analysis Fundamental tool for design
Stage II: Refinement of Idea
Classifications of Software Requirements
Unit 1: Fundamental Concepts
FOR LOCAL AGENCY FEDERAL AID PROJECTS
Pre-Contract Cost Control
Management System of Engineering Structures
Las Pilitas Quarry - Continued Hearing
FOR LOCAL AGENCY FEDERAL AID PROJECTS
Chapter 2 Parametric Modeling Fundamentals
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Presentation transcript:

If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia

Problem Constructing a new road or rail, or realigning an old is expensive, with costs very sensitive to the alignment. The least cost solution of following the natural surface, is often impossible as the alignment must satisfy geometric, environmental and social constraints.

Current Practice Largely intuitive, and the weakest link is the planner’s capacity to consider all the data and constraints. Contractors can usually reduce costs by 5 – 10% when a project goes out to tender for design and construct by adjusting the alignment. Contingency allowances also add substantially to bids.

Agency Attitudes Agencies know they are not extracting the greatest value from their data, but do not realize the extent of the shortfall. Government agencies have accepted this status quo because of the uncertainties involved.

Status Quo Agencies do not locate alignments as precisely as possible because the data quality does not justify the precision; whilst the quality of the alignments does not justify spending more on better data. When current practice cannot make the best use of existing data, it is hard to justify paying more for better data.

History The Quantm system is the product of CSIRO, the Australian Government Research Agency. The system was developed specifically to address the complex issues of route alignment planning. Quantm Ltd was established in early 2000 to commercialise the software.

Quantm The Quantm system is designed to locate alignments to within centimetres horizontally and vertically. It is a planning tool for route selection not a CAD system that is concerned with engineering design. The system can optimize horizontally and vertically whilst accommodating both broad based and localised issues.

Data Terrain Geometry Geology Unit costs Linear features Special zones

Construction Bridges Fill and Shallow Cuts –Culverts –Retaining walls Deep Cuts Tunnels

Structure of the Software

Modes of Operation Optimization - starting with fixed end points, bearings and grades, and searching the entire study area. Refinement - starting with an existing alignment and conducting a concentrated search in its vicinity.

Benefits Robust and Extensible Fast Flexible Reliable Scaleable

Performance Cost millions of alignments while searching for low cost solutions. 10km of road takes one or two minutes for each solution accepted, compared with a week for a CAD operator. Quantm clients have documented alignment construction cost savings of as much as 30%.

Toowoomba - Plan

Toowoomba - Profile

Implications for Data The magnitude and consistency of the cost reductions are beginning to change the way the road agencies view the quality, scope and timing of their data collection. Quality data can now provide an immediate payback by giving agencies lower cost routes and a better grasp of the contractor’s costs, thereby reducing substantially the allowance for contingencies.