APPLICATION OF BOREHOLE RADAR TO POTHOLE IDENTIFICATION AND DELINEATION AHEAD OF THE WORKING FACE IN PLATINUM MINES 4 th International Platinum Conference:

Slides:



Advertisements
Similar presentations
Basic Ground Penetrating Radar Theory
Advertisements

High-resolution, short-range, in-mine geophysical techniques for the delineation of South African orebodies The CSIR Research and Innovation Conference.
Estimates of Arctic Wetland Extent Using Ground Penetrating Radar Stefan Schultheiss 1 ; Christoph E. Geiss 2 ; Phil Camill 5 ; Mark B. Edlund 4 ; Charles.
Geoserve Logging & Tomography
版权所有: CMC 1 Sonda-Jherrukh Coal Mine& Power Plant Project.
Large Scale Mapping of Groundwater Resources Using a Highly Integrated Set of Tools Verner H. Søndergaard Geological Survey of Denmark and Greenland, Denmark.
AMSZ AGM 2014 NYANGA 29 AUGUST 2014 WAYNE D. SILUNDE MINE SURVEYOR ( UNKI MINES) 1 IMPORTANT! THE ROLE OF THE MINE SURVEYOR IN PLATINUM ORE RESERVE DETERMINATION.
TRENCHING AND EXCAVATIONS
A view on mechanisation Declan Vogt “Day of Learning” on “Value Added Drilling and Blasting Practices”
A study of the stability mechanism within shallow mining operations that will impact on the sustainability of Platinum Mines The CSIR Research and Innovation.
4.7 Billion Rand Investment In South Africa Driefontein 9 Sub-vertical Shaft Depth Extension and Kloof Extension Area Decline Shaft System 7 September.
CanAlaska Ventures Ltd This slide show presentation contains certain "Forward-Looking Statements" within the meaning of Section 21E of the United States.
Safe and secure management of sealed radioactive sources in Ghana: status of the borehole disposal project G. Emi-Reynolds, E.T. Glover, M. Nyarku*, P.
BOREHOLE RADAR FOR EXPLORATION IN AUSTRALIA Dr Carina Kemp, Geophysicist “New Exploration Technologies” Symposium Kirribilli Club, Milsons Point, Friday,
ADVANCES IN DRILL RIG DEPLOYED RADARS Mr Tim Sindle, ARCO/CRC Mining Imaging Lab, The University of Sydney Dr Carina Kemp, Business Development Manager,
A Comparison of Numerical Methods and Analytical Methods in Determination of Tunnel Walls Displacement Behdeen Oraee-Mirzamani Imperial College London,
Conclusions & Recommendations
International Atomic Energy Agency Uranium Geology and Deposits, Exploration, Mining and Milling and Environmental Issues Seminar on Nuclear Science and.
Double-difference earthquake relocation of Charlevoix Seismicity, Eastern Canada implication for regional geological structures Meng Pang.
Options To Increase the Water Availability SSC Meeting on 30 April 2013, Bundu Lodge, Nelspruit.
Amrit Prakash Jonko 08MN23.  A method of mining whereby high value ore is mined in such a manner as to make the low-grade ore left in the mine incapable.
Introduction of technical paper Funding adaptation in developing countries: extending the share of proceeds used to assist in meeting the costs of adaptation;
Eagle Mountain – Woodfibre Gas Pipeline Project Geotechnical and geophysical tests James Lota, FortisBC September 25, 2014.
TSX-V: OCO Frankfurt: OR6
November, 2000 Slide 1 Project Services Division RISK MANAGEMENT Project Services Division Presentation By: Adam Malkhassian November, 2000.
 ABSTRACT  COMPANY PROFILE  PROJECT PROFILE  INTRODUCTION  PROJECT MANAGEMENT  MODEL USED  SCHEDULING  RISK MANAGEMENT  SYSTEM REQUIREMENT SPECIFICATION.
Evaluating the Effectiveness of the 1750 Tonne Shields at Moranbah North Mine Kelly Martin Mehmet Kizil Ismet Canbulat.
Technologies and Equipment to Control and Improve UNDERGROUND MINE SAFETY Lunagas Pty Limited Beijing, CHINA, Beijing, CHINA, April 2004 Les Lunarzewski.
Mineral Exploration Tel: (07) Fax: (07)
Rubin Pajoohan Fartak International Engineering co.
Mining. Mining Minerals are naturally occurring substances found in rocks, soils, or sediments. Minerals deposits that can be mined profitably are called.
Computer Emergency Notification System (CENS)
1Hannu Luodes Natural stone assessment with ground penetrating radar (GPR) The 15th Meeting of the Association of European Geological Societies.
NRCan Final Hearing Presentation Meliadine Gold Project Kate Cavallaro Senior Environmental Assessment Officer Environmental Assessment Division External.
Teaching the Geological Subsurface using 3D ModelsTeaching the Geological Subsurface using 3D Models Steve Thorpe & Emma Ward
Projects THE BASIL READ GROUP Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke. Dr Michael Roberts, TWP SAIMM Zimbabwe.
MULTIPLE LOW FREQUENCY (MLF) ANTENNA Authors: Almelu Mangamma V. Hebsur M.Tech (Remote Sensing) ‏ Department of Civil Engineering Indian Institute of Technology.
Week 9 ©2012 Dr B C Paul. Coal Trouble in the Board Room –Plans to ignore large amounts of met coal and drop mining your low sulfur coal and cut down.
Hazard Management Plans Moura Mine’s Highwall Mining Approach.
1 SROC Conference JISC Timetabling Study - Presentation of findings 7 th April 2009 Zeb Nash.
Introduction to SEPA The Scottish Environment Agency For CaSPr Waste Workshop Glasgow 19 October 2006 Claudette Hudes NetRegs Team Leader.
Mineral Exploration Tel: (07) Fax: (07)
Senior Design 2009 Projects Overview. General Format Week Day 1 – Outline Work to Be Accomplished During the Week Week Day 2 – Work Day / Special Lecture.
One Team One Vision With Pride The Association of Mine Surveyors of Zimbabwe AGM KARIBA The Association of Mine Surveyors of Zimbabwe AGM KARIBA.
Slim Borehole Scanner (SBS) An Update
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
GEOPHYSICAL APPLICATIONS FOR GENERAL EXPLORATION
Marine Knowledge space data€400 million per year in-situ data> €1 billion per year cost of ocean observation in EU.
COAL MINE PROJECT OPPORTUNITY NALAIKH MINE POWER GENERATION AND HEATING PROJECT TSAGAAN SHONKOR HOLDING COMPANY NALAIKH DISTRICT, MONGOLIA OVERVIEW OF.
1 INSPIRE Conference, Edinburgh 1 Themes Geology & Mineral Resources Short overview description Main achievements Open issues 2 themes: Geology & Mineral.
Botswana Integrated Water Resources Management – Water Efficiency (IWRM-WE) Project Michael Ramaano IWRM/WE Project Manager, Tel:
Introduction Training. Training contents Introduction What is LXRMTK? How can LXRMTK be used? Where can LXRMTK be used? Who can use LXRMTK? History of.
South East Strategic Regional Coastal Monitoring Programme – Annual Review Meeting, November 2009 Satellite Data for Coastal Monitoring Trevor Burton Fugro-BKS.
Importance of Methods’ Selection in the Geosciences Studies and Exploration Mustafa M Hariri Geosciences Department King Fahd University of Petroleum &
 All civil engineering projects like dams, reservoirs etc. constructed on earth crust and constructed by material obtained from the crust.  So it is.
GROUND PENETRATING RADAR
One Nottingham Lunchtime Learning Public Spending Cuts.
“A New Geo’s Survival Guide” Ashley John General Manager – United Kingdom Australia I India I Indonesia Mongolia I Mozambique I United Kingdom.
‘FLOCKTON BASIN’ BUILDING IMPACT AND LOSS ESTIMATES FOR THE MARCH 5TH 2014 CHRISTCHURCH FLOOD EVENT R. Paulik 1, G. Smart, J. Bind 1 National Institute.
ANT11 Presentation, October, 10-13, 2011 David Vardiman Project Engineer Geotechnical Design and Excavation 1 Sanford Lab at Homestake, Lead, SD 4850L.
Introduction Do air-filled caves cause high-resistivity anomalies? A six-case study from the Edwards Aquifer Recharge Area, San Antonio, TX Mustafa Saribudak.
Development of Mining Information System (MIS) in Egypt Dr. Sameh Saad El din Ahmed Mining and Metallurgical Engineering Department
1 Dam Geophysics- An Indispensable Tool for Dam Health Check & Dam Monitoring Presented by: Dr. Sanjay Rana, Director, PARSAN.
Strategic Information Systems Planning
HIGH WALL MINING PRATEEK SHARMA B.TECH MINING II YEAR
Developing a Canadian Gold Deposit
Mining.
Outburst Threshold Limits Current Research Outcomes
Watson B.P., Milev A.M., Roberts D.P. Presenter: B.P. Watson
Chapter PREDICTION AND ASSESSMENT OF RESOURCES
Presentation transcript:

APPLICATION OF BOREHOLE RADAR TO POTHOLE IDENTIFICATION AND DELINEATION AHEAD OF THE WORKING FACE IN PLATINUM MINES 4 th International Platinum Conference: Platinum In Transition ‘Boom or Bust’ 11 th – 14 th October 2010, Sun City, South Africa SPEAKER: Charles Golding, CEO, GEOMOLE AUTHORS: Carina Kemp, Senior Geophysicist, GEOMOLE Petro Du Pisani, Manager in-Mine Geophysics, ANGLO TECHNICAL SERVICES Mduduzi Shoke, Geophysicist, GEOMOLE

Outline  Introduction  Efficient  Instrumentation  Deployment Methods  Effective  Borehole Radar Survey Design  Results and Interpretation  Economic  Financial Implications  Conclusions

Introduction  Borehole Radar (BHR) provides highly detailed, continuous ore body and structural delineation information for accurate resource definition and mine planning.  Borehole Radar has been delineating ore bodies for mine planning for over 10 years.  Improvements in technology over the last 3 years enable borehole radar to be deployed on the drill allowing for quick and easy surveying underground.

Efficient: Equipment GeoMole BHR  10 – 124 MHz Bandwidth  Resolution: less than1m  Range: up to 50m or more (depending on rock type) Note: Borehole Radar will not work for all rock types but works very well in the Norites and Anorthosites in the Bushveld.  Probe diameter: 32 mm  Length 1.65 m  BHR Profiling at ~10 m/min  Omni directional antenna

t Efficient: Deployment The borehole radar system can be deployed by winch or on the drill rods similar to a gyro survey Data is acquired continuously as the rods are pulled and the radar ascends the drill hole Signal is sent radially outwards into the surrounding rock The radar images the rock surrounding the drill hole. The radar is not directional. Neighboring drill holes and knowledge of stratigraphy aids interpretation. Final interpretation is produced.

Efficient: Forming a radargram Radargram Radar deployment

Efficient: Borehole radar process Radar survey Geology info Directional survey Interpretation RadargramReport & Surface Database

Thin seam Platinum Mining

BHR for Platinum Mining  Mine Planning: Removing uncertainty - DON’T develop blindly  Geo-technical information prior to development - shaft and raise planning  Mapping the extent and location of dilution zones before mining – knowing what to avoid or investigate further  Extending the life of the mine – greater confidence in resource estimation

Why Borehole Radar?  Tactical Mining Tool Removing uncertainty - DON’T mine blindly  Providing a means to “view” the space that lies ahead of the working face - mapping the extent of structures and uncertainties ahead of mining  Mapping complex deposits  Mapping man-made structures, e.g. old workings  Illuminating sources of physical instability to allow the miner to either anticipate or even avoid hazards altogether  Safety - locating potentially hazardous zones

Reef thinning <50cm Potholes Thin seam Platinum Mining

Effective: Thin seam Platinum Mining

HOST ROCK BOREHOLES RAISE HAULAGE CROSS CUT Effective: BHR Survey Layout

HOST ROCK BOREHOLES RADAR SURFACE RAISE HAULAGE CROSS CUT Effective: BHR Surface Generation

Effective: Survey Layout

Effective: Borehole Design Borehole ± 10m ± 5m ± 25m ± 4m ± 5m ± 7m Anorthosite PxA Feldspathic Pyroxenite Triplets ~0.3m Leader Seam ~0.2m Main Seam (UG2) ~0.7m Pegmatoidal Feldspathic Pyroxenite ~0.6m Mela- to Leuconorite (BLESKOP MARKER) Pegmatoidal Feldspathic Pyroxenite ~0.9m Anorthosite ~0.9m Leuconorite 8mm Cr. Stringer Feldspathic Pyroxenite ~4m UG1 ~0.1 – 1m Anorthosite

Effective: All Five Radargrams

Effective: Section

Effective: Interpretation

Example

Example: Conclusion  Fortunately no significant disruptions, other than a 2.2m pull down from a reef roll, were detected ahead of mining with the borehole radar for this panel. This meant that mining could continue with confidence. However…………

DISTANCE FROM COLLAR (m) UG2 SHEARS & DROPS PULLING PxA ~2M RADIAL DISTANCE FROM BOREHOLE (m) UG1 Bleskop Marker UG2 PxA UG2 COLLAPSE INTO ~ 15m POTHOLE UG2 HANGING WALL PxA BREAK-AWAY

Economic: Financial Implications  Borehole radar survey results which were the subject of a different paper (Du Pisani 2008) detected a significant reef roll in a nearby panel. The paper showed that borehole radar surveys ahead of mining could have saved over US$1M in unnecessary development in panels that contain un-mineable reef.

Economic: Financial Implications ItemExtentTonnesCost Avoidable mining 4300m 2 14,400US$ 1.03m Avoidable development 338mUS$ 0.23m TotalUS$1.26m Financial impact summarised (after Du Pisani, 2008)

Economic: Financial Implications Impact of reduced dilution:  An average mine mines (say) 2 million tonnes per annum  Assume on-mine costs of approximately US$62.8 per tonne; 2 million tonnes will therefore cost US$125.7m  Geological losses ranges from 5% to 30%  Every 1% reduction in waste mined will save US$1.26m. 5% - US$6.29  This is only the on-mine cost saving. There are significant additional costs incurred in processing waste.

Economic: Financial Implications Impact of reduced dilution (continued):  A 50 hole a year Self-Drive BHR program will cost:  A 1% reduction in waste because of geological certainty will pay for BHR! Borehole radar costs$ 186,000 Drilling costs at R600 per metre for 50 x 200metre holes$ 857,000 Additional staff/consultants$ 100,000 Total borehole radar costs per annum$ 1,143,000

Advantages of using BHR in Platinum  Intelligent development  Reduced dilution  Additional ore  More confidence in resource estimation – continuous ore body maps  Safety improvement; AND  It is inexpensive and easy to use

Conclusions  Borehole radar technology has come of age and provides a demonstrably efficient, effective and economic means of mining smarter.  Supply side constraints facing the platinum industry will be mitigated by being more efficient, BHR can help.  Successful implementation requires:  mine management to see BHR as an operational tool; and  a strong partnership between the supplier and the end user.

Acknowledgements The authors thank:  Anglo Platinum for allowing these results to be published and for their vision and support of the implementation of geophysical programs.  all the Rustenburg geologists, borehole radar surveyors and drilling contractor Rosond who have made these borehole radar surveys possible.  the mine staff of Anglo Platinum for their professional enthusiasm which made this study both possible and enjoyable. The authors gratefully acknowledge the scientific and technical contributions of the borehole radar research teams at:  The University of Sydney  The University of Stellenbosch  CRCMining