In order to understand anything, you must not try to understand everything Aristotle.

Slides:



Advertisements
Similar presentations
What is the purpose of thinking?. Each hat represents a direction of thinking.
Advertisements

Airbus Production System
Thinking skills. Why are thinking skills important? “Individuals cannot ‘store’ sufficient knowledge in their memories for future use. Information is.
Quality Improvement Tools Kate Godfrey National Lead for Quality Improvement And Development.
Six Thinking Hats From the part to the whole From the different/unique to the common From analysis to synthesis.
Welcome to our Presentation
Lateral Thinking Thinking that is Outside the Box!
Decision Making 7 th grade Career Discovery Written by Barbara Mackessy.
Centre for Excellence and Outcomes in Children and Young People's Services Decision Making.
Six Thinking Hats. O This tool was created by Edward de Bono in his book '6 Thinking Hats'.6 Thinking Hats O Many successful people think from a very.
Creativity Creativity is the ability to find new solutions to a problem or new modes of expression; thus it brings into existence something new to the.
Overall Equipment Effectiveness (OEE) 1 OVERALL EQUIPMENT EFFECTIVENESS (OEE) Factory Pulse Logix Automation Systems Pvt. Ltd.
Overall Equipment Effectiveness (OEE)
Laura Dietrich: Maintenance Manger Antoinette Lockett: Plant Manger Waseem Manzoor: Quality Manger Xiaoyan Liu: Production Manger.
Productive Maintenance
Suggestion Schemes (contd…) Prepared by: Bhakti Joshi Date: February 21, 2013.
TOTAL PRODUCTIVE MAINTENANCE
Total Productive Maintenance Chit Khin TEC Introduction Good maintenance is fundamental to productive maintenance. TPM keep plant and equipment.
SIX THINKING HATS Based on the work by Edward de Bono.
Edward de Bono’s Six Thinking Hats An aid to decision making and problem solving. Illustrated by Vince Borg Education Leeds.
Dr. Edward De Bono The Six Thinking Hats The Six Thinking Hats Access to Breast Care for West Texas – ABC4WT Train the Trainer Seminar Saturday, October.
The Thinking Hats.
Total Productive Maintenance OVERVIEW. Target Audience : Senior Management Purpose of Module : To understand the need for TPM and the commitment required.
SIX THINKING HATS Based on the work by Edward de Bono.
Using Edward De Bono’s Six Thinking Hats to help decision-making and problem-solving.
thinking hats Six of Prepared by Eman A. Al Abdullah ©
Total Productive Maintenance (TPM)
Leadership Development Programme 2012 Module 4 Strategic Thinking and Decision Making.
Dr Edward De Bono’s Thinking Hats
De Bono’s Thinking Hats
Why are we using the 6 thinking hats? Edward de Bono’s 6 thinking hats are designed to encourage different approaches to thinking We often think in restricted.
Identifying Issues for Integration Lynne Hall. Goals of Session To identify what the purpose of the application will be To develop an initial idea of.
Page. 1 Partners for Creative Solutions, Inc. 36 Deerfield Rd, Shrewsbury, MA Total Productive Maintenance.
1 Maintenance Performance Measures Management needs information of maintenance performance for planning and controlling the maintenance process. The information.
THINKING HATS. THINKING There are different ways of thinking There is everyday thinking and deliberate thinking You can get better at thinking if you.
Six Thinking Hats Looking at a Decision From All Points of View 'Six Thinking Hats' is an important and powerful technique. It is used to look at decisions.
Six Thinking hats Why use it? –encourages full spectrum thinking –separates ego from performance –encourages innovation and creativity –Improves teamwork.
Total Productive Maintenance (TPM)
Thinking Hats Facilitation Guide - Slides Leader Led Activity © 2011 SkillSoft Ireland Limited.
Decision Making Good decision making is an essential skill for personal & career success, and effective leadership.
The ‘Information Seeking’ Hat Where are the facts? What information is available? What is relevant? What else would I like to know? When wearing the white.
QUESTIONING EDU 395: Module 4B: Creative Thinking Dr. Margaret Maughan c SUNY Plattsburgh.
The Six Thinking Hats Edward de Bono. Six Coloured Hats “Put on your thinking cap” “I am wearing my parent hat” Six hats to put on or take off: –White-Yellow.
Edward de Bono’s Six Thinking Hats An aid to decision making and problem solving.
The six thinking hats of Edward de Bono. Edward de Bono “Thinking is the ultimate human resource. Yet we can never be satisfied with our most important.
Introduction to OEE (Overall Equipment Effectiveness)
KANZEN INSTITUTE ASIA PACIFIC 1 What is OEE ? OEE Overall Equipment Effectiveness Why is a high OEE important for the department ? OEE Calculation How.
DT4 – Major Project Brainstorming Briefs. Design Pedagogy FORMAL ASPECTS INFORMAL ASPECTS ANALYSIS & SPECIFICATION INITIAL IDEAS CLARITY OF COMMUNICATION.
Presented by The Solutions Group Decision Making Tools.
Edward de Bono’s 6 Thinking Hats
Collaborative Leadership
Thinking in hats (Edward de Bono)
The Six Thinking Hats Supannika K Mobasser.
Lateral Thinking Lateral thinking is a term coined by Edward de Bono, for the solution of problems through an indirect and creative approach. Lateral thinking.
Edward DeBono’s Thinking Style Hats
De Bono’s Thinking Hats
Innovative Leadership
Training Module OEE 1.
Dr. S. Poornachandra Dean EIE & BME SNS College of Technology
Should they build a campsite and car park in Edale?
Total Productive Maintenance and Quick Changeover
Put On Your Thinking Hats To Consider change
The white hat thinker call for information known or needed
Total Productive Maintenance © Imants
TPM Definitions Goals and Benefits Components GEOP 4316.
PDT 319 Maintanance Management Total Productive Maintenance.
HISTORY OF MAINTENANCE
Critically Thinking about Farm to Early Care & Education as a Policy, Systems & Environmental Change Strategy Marsha Spence, PhD, MPH, RDN, LDN Department.
Edward de Bono’s Six Thinking Hats
LEAN Principles Total Productive Maintenance (TPM)
Presentation transcript:

In order to understand anything, you must not try to understand everything Aristotle

efficiency  1 universality

focus!

Total Productive Maintenance Our focus today, Total Productive Maintenance

With this thinking hat you focus on the data available. Look at the information you have, and see what you can learn from it. Look for gaps in your knowledge, and either try to fill them or take account of them. This is where you analyze past trends, and try to extrapolate from historical data. 'Wearing' the red hat, you look at problems using intuition, gut reaction, and emotion. "Putting on my red hat, I think this is a terrible proposal." Usually the feeling is genuine but the logic might not be too great for others to understand. Using black hat thinking, look at all the bad points of the decision. Look at it cautiously and defensively. Try to see why it might not work. This is important because it highlights the weak points in a plan. It allows you to eliminate them, alter them, or prepare contingency plans to counter them. Black Hat thinking helps to make your plans 'tougher' and more resilient. It can also help you to spot fatal flaws and risks before you embark on a course of action. The yellow hat helps you to think positively. It is the optimistic viewpoint that helps you to see all the benefits of the decision and the value in it. Yellow Hat thinking helps you to keep going when everything looks gloomy and difficult. The Green hat focuses on creativity: the possibilities, alternatives, and new ideas. It is a freewheeling way of thinking, in which there is little criticism of ideas. The Blue Hat is used to manage the thinking process. "Putting on my blue hat, I feel we should do some more green hat thinking at this point." Thinking Hats

Maintenance, Maintenance, Maintenance, Maintenance, Maintenance, Maintenance Breakdown Predictive Preventive

? ? Total Productive Maintenance Keeping the current plant and equipment at its highest productive level through cooperation of all areas of the organization

! ! Maintaining & improving equipment capacity Maintaining equipment for life Using support from all areas of operations Encourage input from all employees Using teams for continuous improvement

Downtime LOSSES VARIOUS LOSS AREAS

Planned Start-ups Shift Changes Coffee and Lunch Breaks Planned maintenance shutdowns Downtime

Unplanned Equipment breakdown Changeovers Lack of materials Downtime

Reduced Speed Idling and minor stoppages Slow downs LOSSES

Poor Quality Process nonconformities Scrap LOSSES

Calculating Downtime Losses Downtime Losses are measured by Equipment availability A= (T/P) x 100 A = Availability T = Operating Time (P-D) P = Planned Operating time D = Downtime

Calculating Reduced Speed Losses Reduced Speed losses measured by performance efficiency E = { ( C x N ) / T } x 100 E = Performance Efficiency C = Theoretical Cycle Time N = Processed Amount (Quantity) T = Operating Time (P-D)

Calculating Poor Quality Losses Poor Quality Losses measured by rate of quality products produced R = { ( N – Q ) / N } x 100 R = Rate of Quality Products N = Processed Amount (Quantity) Q = Nonconformities

Calculating Equipment Effectiveness Equipment Effectiveness is the products of previous metrics EE = A x E x R EE = Equipment Effectiveness

TARGET Equipment Effectiveness 85%

TARGET Equipment Effectiveness 85% Last week’s production numbers on manufacturing center JL58 were as follows: Scheduled operations = 10 hours/day; 5 days/week Manufacturing downtime due to meetings, Material outages, training, breaks and so forth = 410 minutes/week Maintenance downtime scheduled and equipment breakdown = 227 minutes/week Theoretical (Standard) Cycle time = 0.5 minutes/unit Production for the week = 4450 units Defective parts made = 15 units P = 10 hours/day x 5 days/week x 60 minutes/hour = 3000 minutes/week D = 410 minutes/week minutes/week = 637 minutes/week T = ( P – D ) = 3000 – 637 = 2363 minutes Please calculate A = ( T / P ) x 100(Equipment Availability) E = { (C x N) / T } x 100(Performance Efficiency) R = {( N – Q ) / N } x 100(Quality Products produced) EE = A x E x R(Equipment Efficiency) Hands-on with Calculations

HOW do we achieve 85% EE? Target Equipment Efficiency 85%

Break We however request Green Hats to start thinking about the problem, when we’ll return, we’ll discuss about the ideas given out by the Green Hats.

TARGET Equipment Effectiveness 85%

Total Productive Maintenance

Learn the new philosophy Promote the new philosophy Fund the training and train everyone Identify areas of the needed improvement Formulate performance goals Develop implementation plan Establish autonomous work groups Total Productive Maintenance Recipe

Life is the art of drawing sufficient conclusions from insufficient premises Samuel Butler