Tree-trimming Standards and Practices City Council Work Session November 19, 2007.

Slides:



Advertisements
Similar presentations
Project Management An Electric Utility Perspective Michael Jackovich President and Owner Project Management Plus, Inc. May 18, 2009 Copyright 2009 Project.
Advertisements

June 22, 2005 NAESB Board of Directors Meeting, San Antonio, Texas 1 North American Energy Standards Board Meeting of the Members NAESB Board of Directors.
Department of Environmental Quality Environmental Management System Overview.
The Power Grid ELEC 403 The Citadel Mark McKinney.
AGENDA  Introduction & General Overview  Types of Audits  Types of Investigations  Audits  Investigations  Closing Remarks.
City Council Study Session October 16, 2014 ELLIOT ROAD TECHNOLOGY CORRIDOR LIGHT INDUSTRIAL PLANNED AREA DEVELOPMENT REZONING.
Reporting the Economics of Reliable Energy Ralph Fehr, P.E. Engineering Consultant Reliability of the U.S. Power Grid.
Vegetation Management
1 March 1, 2007 Report An Overview October 30, 2006 – Staff Workshop.
Electricity Transmission and Distribution. Transformer A device that transfers electricity from one circuit to another.
“Real Estate Principles for the New Economy”: Norman G. Miller and David M. Geltner Chapter 10 Land Use Controls and Property Taxes.
The most precious commodity in your organisation?
Ontario Overview Dave Short Senior Regulatory Analyst, Regulatory Affairs IESO’s ERO Workshop – June 28, 2006.
Averting Disaster - Grid Reliability Issues and Standards National Energy Restructuring Conference April 1, 2004 Washington, DC.
Clearing a Path for Reliability Tree Pruning. 1 Three Major Causes of Power Outages Trees, lightning and wildlife are the three major causes of power.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
TEMPLATE SLIDE – KEY FACTS (Name of Company) Year manufacturing facility/company was founded What you make/specialize in Who are your customers Jobs created.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
Consulting Utility Foresters Who we are and what we do June 2012 Heidi Knapp Transmission Consulting Utility Forester ISA Certified Arborist Arbormetrics.
Code Enforcement Update August 25, What is Code Enforcement? The process of preventing, inspecting and mitigating nuisances on public and private.
Introduction & Opening Remarks l Hurricanes of 2004 & 2005 highlight the need for a fresh look at these issues l We support this effort and will be active.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
January 2008 Texas Regional Entity Report. 2 Performance Highlights ●ERCOT’s Control Performance Standard (NERC CPS1) score for November – ●Scores.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Transmission Reliability Performance Metrics November 5, 2009 © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
Compliance Monitoring and Enforcement Audit Program Background Information.
FERC’s New Reliability Initiatives Kevin Kelly Director, Policy Analysis, OMTR Federal Energy Regulatory Commission NARUC Annual Meeting Nashville, TN.
1 Today’s Presentation Sarbanes Oxley and Financial Reporting An NSTAR Perspective.
SA Power Networks Strategic Vegetation Management Alexandra Lewis, Vegetation Strategy Lead LGA Roads and Works Conference – 28 August 2014.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Overview of WECC and Regulatory Structure
Public Meeting on ERCOT’s Proposed 2004 Budget September 3, 2003 Preliminary - Subject to ERCOT Board Approval.
Status Report for Critical Infrastructure Protection Advisory Group
Mandatory Electric Reliability Standards and Transmission Expansion Suedeen G. Kelly Commissioner Federal Energy Regulatory Commission The Canadian Institute.
© Property of ERCOT /06/20041 Overview of SPS in ERCOT February 5, 2004.
Protecting Communities Task Team Update Las Vegas January 14, 2009.
Medium-term TEC Trading ARODG Seminars Glasgow & London February 2007.
Transmission Congestion Management – IDC Granularity Option 3A Larry Kezele and Jeff Norman June 28, 2005 NERC/NAESB TLR Subcommittee.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Introduction This presentation is intended as an introduction to the audit process for employees of entities being audited by MACD. Please refer to the.
Transmission Customer Forum Operating Agreement Update Cheryl Johnson 9/21/06.
1 TDTWG Scope and Goals 2015 Wednesday January 8, 2014.
Compliance Monitoring and Enforcement Audit Program - The Audit Process.
Electric Utility Infrastructure Commission Staff Workshop January 23, 2006.
1 New Orleans, LA July 31, 2007 Randy Helmick Vice President, Transmission Business Entergy Transmission Planning Summit.
DISTRICT 11 HAMLINE MIDWAY MIXED-USE CORRIDORS 40-ACRE ZONING STUDY City of Saint Paul - Planning Commission December 5, 2014.
1 Texas Regional Entity Report November Performance Highlights  ERCOT’s Control Performance Standard (NERC CPS1) score for September –
CLEARLY WE KNOW HOW TO BURY LARGE STRUCTURES. DRILLING AND BURYNG ALONG THE SAME ROUTE AS THE “POLES” SHOWS IT CAN BE DONE !!
2009 Hurricane Season Preparations Florida Public Utilities Company May 6, 2009.
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
2015 Hurricane Season Preparedness Briefing Jorge Puentes Engineering Manager – Northeast and Northwest Divisions March 18, 2015.
2014 Hurricane Season Preparedness Briefing Jorge Puentes Technical Projects Manager – Northeast and Northwest Divisions March 26, 2014.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
1 Pepco Benchmarking Study. 2 Pepco Statistics Number of Customers:687,516 Customers Service Area:640 Square Miles 100% District of Columbia 61% Montgomery.
FERC’s Division of Reliability Federal Energy Regulatory Commission – Open Meeting Washington, DC October 6, 2004 Joseph H. McClelland Director, Division.
Cleaning Reforms Area Based Cleaning Model.
MOPC Meeting Oct , 2016 Little Rock, AR
NERC Reliability Standard EOP 001
Home Improvement Rebate Program
Ryan Cox, Mitigation Planning Supervisor, NC Risk Management
Academy of Electrical Contracting | Fred Sargent
Impacts and Actions Resulting from the August 14, 2003 Blackout
Alison Silverstein Contributor to DOE 2017.
2007 Hurricane Season Preparedness Briefing
Route 7 Setbacks and Buffer Standards
NERC Congestion Management
SCE’s 2019 Wildfire Mitigation Plan
Presentation transcript:

Tree-trimming Standards and Practices City Council Work Session November 19, 2007

Introduction Two General Categories - Transmission - Distribution Work Performed by Outside Contractor - ANSI A300 (Tree Care Operations – Tree, Shrub, and other Woody Plant Maintenance – Standard Practices) - Interpretation and Implementation of A300 - Line clearances to GP&L standards Line Clearances - Transmission Standard (GP&L OH-907) - Distribution Standard (GP&L OH-908)

Transmission Standards Overview Subject to NERC Standard FAC Lists ANSI A300 as industry “best practice” for vegetation management Transmission Vegetation Management Program (TVMP) per FAC Passed ERCOT/NERC audit this year Liable for ALL vegetation related outages Increased penalties under nodal market

GP&L Standard OH-907

Typical Transmission Standard Zones defined by the TVMP - Border zone requires documented plan - Wire zone requires immediate resolution

New Transmission Design New transmission design increases clearances

Transmission Standards Outlook Development along transmission corridors - Increase compliance effort - Increase in vegetation encroachments - Increase interaction with property owners Reduce this impact by providing information to property owners along transmission corridors. Improve corridor access to insure timely identification of potential encroachments.

Distribution Standards Overview Majority of annual trimming operations Not currently subject to regulatory audits Line clearances per GP&L OH-908 Contractor adheres to ANSI A300 for vegetation management Trimming format (V-out, side, notch, etc.) chosen to provide desired clearances without killing tree. Trunk location typically dictates trim format

GP&L Standard OH-908

Distribution Standards V-Out Format

Distribution Standards Side Format

Distribution Standards Notch Format

Distribution Standards Outlook NERC regulatory voltage will continue to be lowered – distribution may be subject to standards in the near future? Increased trimming in past 3-5 years – greatly reduced storm related outages System reliability directly affected by magnitude of trimming operation Enhance customer notification process Provide information on clearance requirements to property owners

QUESTIONS ? Balancing aesthetics & reliability!