CERTIFICATE 4 IN BUILDING BCGBC4004A. General Notes  Site clearing billed in m 2 & includes trees ≤0.5 m girth measured 0.5 m above ground  Tree removal.

Slides:



Advertisements
Similar presentations
The information in this presentation is for the
Advertisements

The Green Grass Grew All Around
Measurement for Civil Engineering works
LESOTHO HIGHLANDS WATER PROJECT PHASE 2
Customising Wick Trenches to Extreme Victorian Conditions Callum Morrison Benalla Rural City Council.
Mine Construction. Start of Barge Landing area. A trailer, excavator and generator. Early Barge Landing June 2007 with one trailer to start construction.
TRENCH OPERATIONS For safety is not a gadget but a state of mind. ~Eleanor Everet.
Chapter 3 Measuring Excavation and Sitework
CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012.
GROUND PREPARATION ‘CULTIVATION’. ‘CULTIVATION’ ‘.. Is the tilling of the soil and its vegetation or brash cover with implements to provide a favourable.
Estimating Site work. Major Components Erosion & Sediment Control Fencing Clearing and grubbing Excavation Backfill Grading Trucking.
MEASUREMENT Volume & Capacity.
Chapter 18 Foundations.
Chapter 2b Foundations Shallow & Deep Foundations.
how Do living things take in nutrients, breathe, and eliminate waste
How Are Igneous Rock Formed?. Igneous rocks are called fire rocks and are formed either underground or above ground.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
BOX JACKING. EXPLANATION It is the process in which a pre-cast R.C.C box or a rigid box is pushed into the soil with the help of hydraulic jacks It is.
Lecture 2 Introduction to Earthmoving
Preparing Foundations for Cylinders & ASME Tanks
Woody Plant Installations to Ensure Survival Lync Training (12 March 2013) Dr. William M. Fountain Extension Professor of Arboriculture UK College of Agriculture.
The Natural Pool To advance to the next slide, click your mouse button. To end the show, close the window.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500.
Using the Historic Environment Record to research castles What is the Historic Environment Record (HER)? Sometimes known as the sites and monuments record.
Area Volume Measures a given space Length and Width 2-D 3-D Length times width L x W Length times width time height L x W x H Measures the space of a flat.
Wates CBE Learning Build: Plant interactive.
4.2 Solving Inequalities Using Addition and Subtraction.
Land Clearing. Aims of cleaning land 1.Remove the obstacles 2.Remove the topsoil.
NITROGEN & PHOSPHORUS REMOVAL FROM GROUNDWATER LITTLE BOGUE, MS. CONSTRUCTED NOVEMBER 2009.
Warm-Up #1 11/30 1. Write down these 3 formulas:
By: Lindsey Mullins & Dallas Crouch
 Snap together cubes to create a solid rectangular figure.  How long is your figure?  How wide is your figure?  What is the height of your figure?
Excavation.
The simple act of planting a tree Arbor Day – First Friday in May Right tree for the right place –Distance to buildings –Height to overhead lines or street.
UC-12 L1 Flight Track over Ground Sites.
The Architect envisioned a house with the “ primal quality of a single room” that captured within it as much daylight as possible. The Alves Residence.
Source Page US:official&tbm=isch&tbnid=Mli6kxZ3HfiCRM:&imgrefurl=
Jackie works for an oil company. She needs to drill a well to an oil deposit. The deposit lies 2300 m below the bottom of a lake, which is 150 m deep.
BUILDING CONSTRUCTION
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Foundation types and uses
EduBrite Training for Group Admins. Dashboard Reports Groups Enrolled courses More items under this menu.
Duck Pond Landfill 3100 Blk. of National City Blvd. National City, CA AA-0017 Photos by Anthony TorresPage 1 of 3 June 26, 2013 The Volkswagen.
Путешествуй со мной и узнаешь, где я сегодня побывал.
Oceanic -- Continental Match-Up. Abyssal Plain Continental shelfOce\ basin Continental Shelf The edges of the continents slope down from the shore into.
Detailed planning for fish farm construction Once the site has been selected, then initiation of planning begins. There are two main related components.
EXAMPLE A 400 m2 (40 x 10 m) area is to be excavated, 1 m deep, with side slopes 2:1. As the width (10 m) is less than 30 times the depth (30 x 1 m), the.
Our changing landforms and oceans Standard 5.e.3
BOX JACKING.
Drawing Longitudinal & Cross Sections
EXCAVATION, LATERAL RESTRAINMENT FOR IT AND DEWATERING
Heat underground creates pressure which forces hot water upwards.
Page 1. Page 2 Page 3 Page 4 Page 5 Page 6 Page 7.
GeoMesh Blockchain Networking - Slide Presentation
SAB 3122 CONSTRUCTION TECHNOLOGY AND ESTIMATING Excavation
Building Construction I Sofia Sebastian 1
Calculating Slope.
Strip Foundations The foundation runs under all the loadbearing walls.
مفهوم الموازنة العامة المقدمة
Find the area of the part of the plane 8x + 2y + z = 7 that lies inside the cylinder {image}
February 1, 2018 Warm-up Find the surface area of a rectangular prism with a length of 5 meters, a width of 7 meters, and a height of 12 meters. Find.
Print Reading.
12.4 Point-Slope Form.
TAG Proposal “Forest vegetation as an indicator of natural gas leaks” Don Davis (PI) Lynda Farrell, Consultant.
Types of Plate Boundaries
Continental Landforms
STANDING WATER FOOTBRIDGE
Chapter 3 Section 2 Evaluating Algebraic Expressions Page 179.
North Carolina's Selective Vegetation Removal.
Presentation transcript:

CERTIFICATE 4 IN BUILDING BCGBC4004A

General Notes  Site clearing billed in m 2 & includes trees ≤0.5 m girth measured 0.5 m above ground  Tree removal billed starting at >0.5 m ≥1m girth and every 0.5 m girth thereafter  Surface excavation is billed in m³ with the area stated in m 2  Differing widths of trench excavation may be billed as one item starting at ≤ 1 m deep and 1 m increments thereafter  Pier holes are billed in m with the volume stated in m 3

Page 19&20

Page 16

Y=3.4 X=0.3 X=3.1 Y=3.4 OR X/Y x rise = /3.4 x rise =16.03 Page 17

Page 18

Page 22&23 A B