Cross-Border Infrastructure: A Toolkit Planning & Economic Analysis II Northern Economic Corridor: Case Study For Economic Analysis Session on Planning.

Slides:



Advertisements
Similar presentations
New Public Transit Alliance (NuPTA) RIPEC Study: Transportation at a Crossroads (2002) Growing Smart with Transit: A Report of the Transit 2020 Working.
Advertisements

The Economics Of Road Investment
Sector Planning & Policy Issues: The Energy Sector
Jong Inn Kim Principal Energy Specialist Energy, Transport, and Water Division, Asian Development Bank ROUNDTABLE APEC Energy Trade and Investment Cairns,
SOME QUESTIONS ABOUT EDUCATION AND TRAINING CONCERNING THE LABOUR MARKET IN VIETNAM Dr. Nguyen Ba Can Deputy General Director Department of Facilitates.
Cross-Border Infrastructure: A Toolkit Session 0: Program Overview Regional Integration In Asia: An Overview Session on Planning & Policy Rita Nangia Asian.
GMS Economic Corridor Development and Trade
Monitoring and Evaluation in the GMS Learning Program 7 – 18 May 2012, Mekong Institute, Khon Kaen, Thailand Randy S. Balaoro, CE, MM, PMP North-South.
Social Action Plan of the GMS North-South Economic Corridor Project.
Cross-Border Infrastructure: A Toolkit Mass Transit: Comparison of Bangkok & Kuala Lumpur Session on Private Sector Participation Yong Hee Kong PPP Resource.
Cross-Border Infrastructure: A Toolkit Cross Border Infrastructure: An Introduction Session on Planning & Policy Rita Nangia Asian Development Bank The.
Cross-Border Infrastructure: A Toolkit Logistics, Trade Costs, Infrastructure: Beyond Borders Session on Planning & Policy Rita Nangia Asian Development.
East West Economic Corridor: The Opening of the Third Lao-Thai Friendship Bridge Dr. Bounthavy Sysouphanthong Deputy Minister Ministry of Planning and.
The importance of economic growth
Copyright © 2009 Pearson Addison-Wesley. All rights reserved. Chapter 8 Human Capital: Education and Health in Economic Development.
How Economic Integration Can Promote Inclusive Growth Lao PDR's Experience 12 November 2014 Leeber Leebouapao(Ph.D) Director Genral National Economic Research.
The Urban Infrastructure Challenge in Canada: Focusing on Housing Affordability and Choice Presentation by CHBA – [Name] to The Municipal Council of [Name]
Opportunities and gaps in EU-ASEAN environment research Dr. Anil Kumar Associate Professor and Coordinator Food Agriculture and Bio Systems Cluster Asian.
Cross-Border Infrastructure: A Toolkit Universal Service Session on Regulation & Accountability Max Bradford Castalia The views expressed here are those.
The Role of Business Aviation in the European Economy Philip Thomas Oxford Economics 13 March 2013.
Financing Urban Public Infrastructure
National Policy on Health Impact Assessment, Lao PDR
Role and Components of Project Evaluation
Quantifying Disaster Risk and optimizing investment Sujit Mohanty UNISDR – Asia Pacific Protecting development gains: A path towards resilience.
INVESTMENT PROJECT PROPOSAL Construction of the railway line Marculesti-Soroca, and the bridge over the Nistru river Construction of the railway line Marculesti-Soroca,
Chapter 13SectionMain Menu Unemployment What are the different types of unemployment? How are unemployment rates determined? What is full employment?
Types of Unemployment Frictional Unemployment
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Project Monitoring and Evaluation in the GMS 7-18 May 2012, Mekong Institute, Khon Kaen Project Monitoring and Evaluation for Road Construction in Lao.
Chapter 12: Gross Domestic Product and Growth Section 1
Non-Formal Education Policy of the LAO PDR “Sharing for Learning-Experiences and Lessons from NFE for Lao PDR and Cambodia”, dvv international, Regional.
1 Mississippi River Bridge An Analysis of Alternatives Expert Panel Review Sharon Greene & Associates.
Masahiro Kawai Dean and CEO, Asian Development Bank Institute 15 September 2010, New Delhi Sustainable Growth and Enhancing Integration in Asia A Joint.
NS4053 Winter Term 2015 South African Convergence.
Module 13: Assessing affordability and impact on fiscal space ILO, 2013.
Disclaimer: The views expressed in this document are those of the author, and do not necessarily reflect the views and policies of the Asian Development.
Hong Kong Railway plus Property Funding Model Disclaimer: The views expressed in this document are those of the author, and do not necessarily reflect.
Regional Learning Session on Sustainable and Inclusive Marketing Arrangements Towards Increasing Farmers’ Market Power 9-11 May 2013 Manila Vedini Harishchandra.
February 07, 2012 National Institute of Statistics of Rwanda 1 NATIONAL INSTITUTE OF STATISTICS OF RWANDA EDPRS2, EICV3 & DHS4 Joint Launch Key Statistics.
1 The Global Financial and Economic Crisis UNDP’s RESPONSE Regional Conference on the Impact of the Global Economic and Financial Crisis to the Vulnerable.
Helping Achieve Seamless, Sustainable and Open Transport System in Asia Xianbin Yao Asian Development Bank 6th APEC Transportation Ministerial Meeting.
Generating Rural Employment in Africa to Fight Poverty Janvier D. Nkurunziza United Nations Economic Commission for Africa Sub-regional Office for Central.
Economic Significance of the Border: A Perspective at the Regional and National Levels for both Passenger and Freight Movements Bruno Penet HDR | Decision.
1 2 nd Expert Group Meeting Euro-Asian Transport Linkages 3-5 November 2004, Odessa Asian Highway Network providing Euro-Asian Highway Linkages M. B. Regmi.
Kiichiro Fukasaku Development Centre
Ayumi Konishi Director General, East Asia Department Asian Development Bank CCICED Annual General Meeting 2015 Forum G20 and Green Finance 11 November.
Introduction to the UK Economy. What are the key objectives of macroeconomic policy? Price Stability (CPI Inflation of 2%) Growth of Real GDP (National.
Bangladesh Poverty Assessment: Building on Progress Poverty Trends and Profile Dhaka, October 23 rd 2002.
Disclaimer: The views expressed in this document are those of the author, and do not necessarily reflect the views and policies of the Asian Development.
Kalanidhi Subbarao Human Development Network (Social Protection) The World Bank March 23, 2011.
Implementation of the international development goals by the Lao PDR I. National Development Strategy II.Progress in the implementation of National Development.
3 rd Euro-Asian Road Transport Conference Beijing, China, Sept Promoting international transport Conventions through sub-regional agreements:
Road Investment Decision Framework
Presented by: Phouvong Phaophongsavath (MPI) Justine Sylvester (VFI)
Enhancing employers’ involvement in Social Protection policy debates
Inclusive Growth: What does it mean, and how do we operationalize it?
Project Feasibility Analysis
Unemployment What are the different types of unemployment?
Unemployment What are the different types of unemployment?
Chisinau-Gurgiulesti Motorway, Construction of Comrat Bypass
Unemployment What are the different types of unemployment?
Unemployment What are the different types of unemployment?
Unemployment What are the different types of unemployment?
Unemployment What are the different types of unemployment?
Changing Viet Nam -New Phase of Development
Unemployment What are the different types of unemployment?
Prepared for the EASSD Transport Sector Retreat
Unemployment What are the different types of unemployment?
Unemployment What are the different types of unemployment?
© 2015 by McGraw-Hill Ryerson Ltd.
Presentation transcript:

Cross-Border Infrastructure: A Toolkit Planning & Economic Analysis II Northern Economic Corridor: Case Study For Economic Analysis Session on Planning & Policy Rita Nangia Asian Development Bank The views expressed here are those of the presenter and do not necessarily reflect the views or policies of the Asian Development Bank (ADB), or its Board of Directors, or the governments they represent.

Cross-Border Infrastructure: A Toolkit Session Description The session covers the following topics:  Case study with hands on exercise; and  Analyzing the distribution of costs and benefits of cross-border infrastructure across countries.

Cross-Border Infrastructure: A Toolkit Basic Information A 228 kilometer road project in Northern Lao PDR connecting Kunming to Chiang Rai Lao PDR’s determination to link its economy through road networks Overall road access in Lao PDR is limited only.03 km per square kilometer Market access for goods and access for service severely limited

Cross-Border Infrastructure: A Toolkit

Project Rationale Access was a major problem Table 1: Access to Roads (% of villages as of 2001) Provinces6+ km to main roadAccess in rainy season Access in dry season Louang Namtha Bokeo Lao PDR Source: National Statistics Centre, Lao PDR

Cross-Border Infrastructure: A Toolkit Project Rationale Access was a major problem Source: Draft Final Report for Preparing the Northern Economic Corridor for the Lao PDR (2002), ADB Table 2: Distance from Houayxay and Income of Villagers, 2002 Item/Village NamePa OiOu DomPak Hao Neua Mok Ka Chok Nam Ho Tai Distance from Houayxay (km) per capita income ($) per capita income ($)

Cross-Border Infrastructure: A Toolkit Project Rationale Poverty was a major problem Source: ADB staff estimates and National Statistics Centre, Lao PDR Table 3: Poverty Profile, 2001 ProvinceDistrictTotal Population PoorPoverty Incidence (%) Share of Region’s Poor (%) Poverty Gap Severity of Poverty Louang Namtha 123,23770, Namtha26,84111, Viangphoukha13,20011, Bokeo122,34245, Houayxay48,80214, Total Project Area 88,84338, Lao PDR5,087,5421,964,

Cross-Border Infrastructure: A Toolkit Project Rationale Poverty was a major problem  98% of the population belong to ethnic minorities  16 different ethnic groups  Girls and women most disadvantaged groups  Highest infant and child mortality rate  One out of four children die before age of 1 and three out of 20 fail to live to reach age of 5  Female literacy only 19% well below national average and below male literacy  Reverse literacy - learning and then losing literacy is common amongst women  More than 80% of population live on subsistence agriculture so high vulnerability to natural shocks  Limited social infrastructure

Cross-Border Infrastructure: A Toolkit Project Profile 228 kms sealed, two lane road, widening of existing bridges and building new ones Total cost $ 90 million with 1/3 financing from PRC and Thailand ADB to construct 74 kms, the rest distributed between Thailand (85 kms) and PRC (69 kms)

Cross-Border Infrastructure: A Toolkit Demand Forecasts Table 4: Average Daily Traffic by Vehicle Type, March 2002 Road Sections Boten- Natuay Natuay-LN*LN-VPKVPK**- Houayxay Houayxay- River 18-Wheelers Wheelers Lignite Wheelers Non-lignite Wheelers Bus (45-seater)85222 Bus (25-seater) Pick-up * LN = Louang Namtha ** VPK = Viangphoukha Source: Draft Final Report for Preparing the Northern Economic Corridor for the Lao PDR (2002), ADB

Cross-Border Infrastructure: A Toolkit Demand Forecasts Three types of traffic  Normal traffic (refers to the existing traffic using the Project Road, inclusive of passenger, commodity, and lignite traffic movements.)  Generated traffic (generated traffic refers to the traffic that will be developed in future as a function of the reduced production costs arising from lower transport costs in the subregion.) and  Land-bridge traffic (refers to the regional traffic, largely between Thailand and the Yunnan Province, PRC diverted from other transport modes and new traffic that will be facilitated due to better infrastructure linkages between these two growing economies.) Land-bridge traffic is a term used to distinguish induced from generated traffic and is meant to reflect how the Project Road will serve as a land- bridge between Yunnan Province, PRC, Lao PDR, and Thailand.

Cross-Border Infrastructure: A Toolkit Demand Forecasts a Growth for initial few years, thereafter it slows down to 7%. Source: Draft Final Report for Preparing the Northern Economic Corridor for the Lao PDR (2002), ADB Table 5: Annual Traffic Growth Projections Normal (%)Generated (%)Land-Bridge (%) 18-Wheelers10 10-Wheelers Lignite00 10-Wheelers Non-lignite10 10 a 6-Wheelers5510 a Bus (45-seater)10 10 a Bus (25-seater)7710 a Pick-up55

Cross-Border Infrastructure: A Toolkit Source: ADB staff estimates Project Costs

Cross-Border Infrastructure: A Toolkit Project Costs Table 7: Financing Plan ($ million) SourceForeign ExchangeLocal CurrencyTotal Costs% ADB PRC Government Thailand Government Lao PDR Government Total Source: ADB staff estimates

Cross-Border Infrastructure: A Toolkit Identification of Economic Costs & Benefits Investment costs to include  Road construction costs  Resettlement and environment  Social protection plan Exclude from capital costs  Taxes and transfer payments  Price contingency  Adjustment using standard conversion factor of 0.8 Benefits for the Lao PDR include  Savings in vehicle operating costs for local traffic  Toll revenue

Cross-Border Infrastructure: A Toolkit Economic Costs Project costs consist of construction costs and civil works, project management and supervision, consulting services including the implementation of resettlement, social and environment management plans, physical contingencies, cost of road user charge collection, and routine and periodic maintenance of the project road with and without project. Civil works cost were derived from the draft feasibility report for the project road.

Cross-Border Infrastructure: A Toolkit Economic Costs ( continued ) The financial costs were converted to economic costs by eliminating the effects of taxes and duties and by adjusting for the price of traded and non-traded cost components. A standard conversion factor of 0.8 was used to convert the prices of non-traded goods. Detailed operations and maintenance costs were estimated in economic terms for the without project and with project scenarios.

Cross-Border Infrastructure: A Toolkit Economic Benefits for Lao PDR From the improvement in vehicle operating costs for the local traffic The revenue it derives from higher regional traffic from the road charges. Benefits accruing to normal traffic were calculated as the difference between total user costs incurred by using the existing unpaved Project Road less total costs incurred with the improved Project Road. These differences in user costs accrue to the users of the road and maintenance costs were estimated in economic terms for the without project and with project scenarios.

Cross-Border Infrastructure: A Toolkit Economic Benefits for the Subregion For the land-bridge traffic, regional savings were estimated for the different types of vehicles for the freight depending on the alternative transport mode. Without the project, river traffic is growing even though the cost and time of using river are much higher. Alternative trip costs were estimated to derive savings accruing to freight operators in Thailand and the PRC. These savings, net of ferry costs and road charges provided the magnitude of savings for regional traffic.

Cross-Border Infrastructure: A Toolkit Economic Benefits for the Subregion ( continued ) For the passenger traffic, vehicle operating cost savings were used as a proxy for 'with" and "without" project cases. In addition, overall benefits also include savings in inventory costs as a result of savings in time. The trip on the Mekong River takes five 5 days at present. It is estimated that road use will result in savings of inventory costs, especially for high value goods at the rate of $2 per ton.

Cross-Border Infrastructure: A Toolkit Table 8: Economic Vehicle Operating Costs Vehicle TypesWithout Project (in KN 1,000 km) With Project (in KN 1,000 km) 18-Wheelers Wheelers Non-lignite Wheelers Bus (45-seater) Bus (25-seater) Pick-up Source: Draft Final Report for Preparing the Northern Economic Corridor for the Lao PDR (2002), ADB

Cross-Border Infrastructure: A Toolkit ADT – Average Daily Traffic EIRR – Economic Internal Rate of Return Source: ADB staff estimates

Cross-Border Infrastructure: A Toolkit ADT – Average Daily Traffic Source: ADB staff estimates

Cross-Border Infrastructure: A Toolkit Key Messages Cross-border infrastructure projects are any cooperation initiatives between two or more countries to strengthen physical connectivity. Economic analysis is an important tool to assess the impact of an infrastructure project on the economy. It is a particularly important tool for cross-border infrastructure because it helps to assess the distribution of costs and benefits between different countries. Sustainable outcomes of such projects require the fair distribution of costs and benefits between different countries.