International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.

Slides:



Advertisements
Similar presentations
TRAINING FOR THE WEIGHTS AND MEASURES OFFICIAL COURSE CURRICULUM MODULE 1Introduction MODULE 2Laws & Regulations MODULE 3Enforcement Procedures MODULE.
Advertisements

Hydrogen Workshop for Fleet Operators. Module 3, “Vehicle Operations and Maintenance Facilities”
Sustainable Energy Systems Int’l H 2 Safety Conf, Pisa, Italy, 8-10 Sep IPHE projects focus on pre-competitive collaborative research, development.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
6/23/2015 Risk-Informed Process and Tools for Permitting Hydrogen Fueling Stations Jeffrey LaChance 1, Andrei Tchouvelev 2, and Jim Ohi 3 1 Sandia National.
Assessment of Integrated Hydrogen Energy Systems in UNIDO-ICHET Pilot Projects by Prof. Dr. John W. Sheffield United Nations Industrial Development Organization.
Iterative development and The Unified process
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO HAZID 2.
International Conference on Hydrogen Safety - Pisa September Slide#1 H Y D R O G E N I M P L E M E N T I N G A G R E E M E N T AN IMPLEMENTING.
Development and Quality Plans
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
RST processes Session 6 Presentation 3. A framework for RST processes Establishing an RST Membership Terms of reference Work programme (schedule, agenda,
Module 1, Part 1: Introduction and The VMP Slide 1 of 22 © WHO – EDM Validation Supplementary Training Modules on Good Manufacturing Practices.
MOVIDA – MOVing from Inspection to Domestic Advice by service companies MOVIDA – MOVing from Inspection to Domestic Advice by service companies Preparation.
IAEA International Atomic Energy Agency Human Resources Development for Nuclear Safety J. Bastos NSNI/RAS.
HIAD NETWORK OF EXCELLENCE HYSAFE - Safety of Hydrogen as an Energy Carrier Work Package 5 Hydrogen Incident and Accident Database - HIAD Espen Funnemark,
GEOSAF-Meeting F. Boissier, S. Voinis, S. Barlow Operational Safety- IGSC Expert Group on Operational Safety (EG-OS) DMR/DIR/ May 2014, Vienna.
Research Activities of HFCV Rule-making in Korea Sept. 24 ~ 26, th HFCV-SGS Meeting Ministry of Land, Transport and Maritime Affairs, Korea Transportation.
Report Tile Training & Management Assistance Branch UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Project Kick-Off Meeting for with Project Manager Name,
Hydrogen Workshop for Fleet Operators. Module 8, “Hydrogen Lifecycle Costs, Training & Useful Information”
INTEGRATING EHS INTO NEW PRODUCT DEVELOPMENT
S/W Project Management
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency 1 Module 13 GMP Workshop.
Visit us at E mail: Tele: www.globalmanagergroup.com.
November, 2000 Slide 1 Project Services Division RISK MANAGEMENT Project Services Division Presentation By: Adam Malkhassian November, 2000.
Software Quality Assurance Activities
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
VTT-STUK assessment method for safety evaluation of safety-critical computer based systems - application in BE-SECBS project.
WHAT IS SYSTEM SAFETY? The field of safety analysis in which systems are evaluated using a number of different techniques to improve safety. There are.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
AC Transit Hydrogen Energy Station / Oakland Fire Department Project AC Transit Hydrogen Energy Station / Oakland Fire Department Project You want to do.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Permitting Hydrogen and Fuel Cell Installations in Canada An Update Pierre Gauthier, H2E North America Air Liquide Sept nd International Conference.
SEVESO II transposition and implementation – possible approaches and lessons learned from MS/NMS SEVESO II transposition and implementation – possible.
Pre-Project Components
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Forest Carbon Partnership Facility Participants Committee Meeting (FCPF PC3) Montreux, Switzerland June 16-18, 2009 Application of World Bank Safeguard.
Your Logo Identification, Preparation and Dissemination of Hydrogen Safety Facts to Regulators and Public Safety Officials Presented by Christian Machens.
Creating the environment for business Streamlining industrial emissions legislation Caspar Corden (Entec) Andrew Farmer (IEEP) IPPC Review Advisory Group.
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
Low Power and Shutdown PSA IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
Alberto Pasquini – Deep Blue Safety Assessment in MFF ASAS TN2 3-5 April 2006, Rome MENU: COVER | SUMMARY | OVERVIEW | TASKS | ALLOCATIONSCOVER SUMMARY.
1 EASTERN MUNICIPAL WATER DISTRICT Risk Management and Insurance Program Doug Hefley Director of Safety, Risk and Emergency Management June.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Capacity-building from the perspective of the ECE Industrial Accidents Convention Virginia Fusé, UNECE secretariatIspra26/03/2015.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Stages of Research and Development
Yokohama National University
[Team Name] (e.g. ESH) Team Lead.
APEC 21st Century Renewable Energy Development Initiative
Flooding Walkdown Guidance
FORMAL SYSTEM DEVELOPMENT METHODOLOGIES
HSE Case: Risk Based Approach.
Quantitative Risk Assessment
Nick Bonvoisin Secretary to the Convention on the
RST processes Session 5 Presentation 2.
CHEMICAL ACCIDENTS Programme
Joint Research Centre The European Commission’s in-house science service.
Indian and Northern Affairs Canada
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
12 Safe Maintenance Rules
AICT5 – eProject Project Planning for ICT
PSS verification and validation
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Emergency & Crisis Management​ GROUP HSE RULE (CR-GR-HSE-701)
Presentation transcript:

International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety

Goals and Objectives To develop data and other information that will facilitate the accelerated adoption of hydrogen systems. Specific objectives:  To cooperatively conduct a testing program to validate the results of numerous models that have been developed and to use the data for further refinement of those tools for use in real-life scenarios, and  to document and convey the results and data in ways that support the development and implementation of codes and standards.

Justification  Much is known about the properties of hydrogen, but information about hydrogen’s safety in real systems during abnormal situations is lacking.  There is much experience relative to hydrogen’s use in industry and space where it is handled in a controlled manner by trained personnel, but there is much less experience in consumer systems.  As a result, hydrogen system and component design requirements are excessive, restrictive and new installations face difficulties with approvals, insurance, and public acceptance.

Safety Related Issues  Current models have not been sufficiently validated by empirical data. This limits their usefulness in design refinements and for insurance purposes.  These seems to be a significant difference in assessing safety based on physical data and actual test data.  Concerns over public acceptance and product liability cannot be resolved unless fully developed codes and standards exist.

Hydrogen Energy Station Back Up Power Unit Storage module Hydrogen Generation and compression module Generator Set Modules

Hydrogen Release into Generator Room: Fast Release Vertical After Leak Fast Leak Horizontal After Leak Fast Leak Constant flow rate: CFM ( m 3 /s) Leak orifice: ¼”, from a high-pressure line Ventilation systems: down Duration: 10 sec. leak

Codes & Standards Development  Based on Prototype Systems  Goal Oriented  Response to Accident or Identified Safety Concern  Quantitative Risk Analysis

Typical Quantitative Risk Assessment Methodology System Definition Hazard Identification (Qualitative) Risk Analysis (Failures Database) Hazard Analysis (Effects Modeling) Risk Calculations Safety/Risk CriteriaRisk Assessment Mitigation Measures Iterative Calculations Cost-Benefit Analysis Final Risk Assessment

Path to Commercialization

Expectations A cooperative program will provide safety information that will be available to all countries to assist in the commercial introduction of hydrogen systems by:  providing information on which to base Codes and Standards development;  facilitating the permitting of new installations by approving authorities; and  facilitating the availability of insurance coverage by providing information on which risk assessments can be completed.

Technical Approach  Preliminary Proposal – 26 experts contacted to solicit ideas and recommendations for task organization and activities  Project Definition Phase One or two workshops depending on interest in participation to develop structure, specific scope and range of activities Draft Annex Plan

Subtask Organization (1)  System component failures  Accidents  Human error  “Acts of God”  Terrorism Subtask 1: Testing program to evaluate the nature and consequences of safety-related events under a range of real-life scenarios, environments and mitigation measures

Activities Suggested by Experts  Destructive testing of hydrogen components and systems  Testing program to validate current codes and standards (e.g. electrical classification)  Testing program to develop data for design standards for hydrogen storage systems

Subtask Organization (2) Subtask 2: Development of targeted information packages for stakeholder groups  Permitting officials  Insurance providers  System developers  Equipment manufacturers  Early adopters of technology  Consumers and end-users

Suggested Activities  International Requirements for siting hydrogen technology installations (US, Canada, Japan, UK, Australia  Development of an Intelligent Virtual Fueling Station  Development of comprehensive information documents

A Few Examples  Hydrogen Generation and Refueling Facility, El Segundo, California  Hydrogen Fleet Demonstration Project, Palm Desert, California  Bus Fleet Demonstration, Chicago, Illinois  Underground Storage Facility, Detroit, Michigan

Schedule  All task activities will be guided by the Handbook of Policies and Procedures for the IEA Hydrogen Program.  Project Definition Phase (6 months) 1 st Experts Workshop (May 2004, Washington, DC) 2 nd Experts Meeting (if necessary)  Draft Annex Plan (Presented October 2004)  Task Initiation – Proposed 3-year term.