High Frequency Test Methods for Laminate Materials (HF) Project

Slides:



Advertisements
Similar presentations
SMTA Wisconsin Chapter Meeting
Advertisements

Shelley Blasdel Begley
IPC Laminate Materials
What determines impedance ?
Commercial Building Project Portfolio
HT13 150C Dielectric Development New high temperature capacitor dielectric Accelerated life testing complete at 2,000 hours and 150C Outstanding peak current.
NLC - The Next Linear Collider Project Keith Jobe May 1999 Damping Ring Kicker Development.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
New Product Development (NPD) New product to grow market share or within overall strategic process of product life cycle Operations Management 8 Stages.
Transformers.
Electro-Chemical Migration Definition Stage Project Wallace Ables - Dell HDP User Group Member Meeting Host: Panasonic Bennington, Vermont September 25,
Polybenzoxazines : New Chemistry
David Seebacher, AEC’09, CERN, Switzerland Impedance of Coatings.
Electro-Chemical Migration Going to Implementation Stage Mike Bixenman HDP User Group Member Meeting Host: Flextronics Santa Clara, CA February 26, 2014.
Initiating and Planning Systems Development projects
Western Underground Committee Engineering & Substructures Fort Collins, Colorado 18 May 2011.
High Density Packaging User Group
Project Management Tools A Loose Guideline on how to use shovels and rakes at AIAA A presentation for New Hires October 6, 1999.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Chapter 4 The Project. 2 Learning Objectives Third phase starts after a contract is drawn up and ends when the project objective is accomplished; final.
Exercise. Try this A 100-Ω transmission line is connected to a load consisting of a 100-Ω resistor in series with a 10pF capacitor with 100Mhz signal.
Press Fit Rework Project Project Update HDPUG Meeting Kawasaki, Japan 10/12/14.
Click to edit Master subtitle style 4/25/12 Thermal Management By using PLPCB technology with HEAVY Copper in PCB Pratish Patel CEO, Electronic Interconnect.
New Project Proposal New Project Proposal High Frequency Performance in Flexible and Flexi-Rigid Printed Wiring Boards Project Supporters: Arlon-MED (Rogers),
SC Project Review of NCSX, April 8-10, 2008 NSCX Poloidal Field Coils Michael Kalish.
Pad Crater Project “Definition Stage” Joe Smetana Alcatel-Lucent Asia Meeting 5/18/2011.
IPC-D Documentation Classification This standard provides three classes for documentation requirements to reflect progressive increases in sophistication.
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
Chapter-23 Alternating Current Circuits. AC Circuits All the equipment in this operating room use alternating current circuits.
FCBGA Package Warpage ØII Definition Stage Project Kirk Van Dreel, Plexus HDP User Group Member Meeting Host: Engent Atlanta, Ga. September 9, 2015 © HDP.
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
1 Lecture #1: PD - Ch 1. Introduction Ref: Product Design and Development by Karl T. Ulrich and Steven D. Eppinger, McGRAW-Hill
SAC Aging III Idea Stage Project Richard J. Coyle HDP User Group Member Meeting Host: Engent Atlanta Ga, USA Sept 9, 2015 © HDP User Group International,
Process Control during Wafer Design and Production.
Slide 1Fig 33-CO, p Slide 2Fig 33-1, p the basic principle of the ac generator is a direct consequence of Faraday’s law of induction. When.
Future HDI Project – Definition Stage
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Lab 6: Forced Harmonic Motion  Driven harmonic oscillation Example: Atomic force microscope watch, circuit, …
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Perancangan Produk D0394 Perancangan Sistem Manufaktur Pertemuan I - II.
Lighting Systems Data and power systems. 1. Power: the network that supplies the power to run the equipment 2. Data : the network that sends instruction.
High Frequency Flex Project Definition Phase Project Lead: TBD Project Facilitator: John Davignon, HDPUG HDP User Group Member Meeting Santa Clara, CA.
IP a.c. devices © Oxford University Press 2011 a.c. devices.
G. De Michele BE-RF1. The study of EM properties at microwave (μw) frequencies is full of academic importance (materials property research) μw communications.
PWB Back Drilling Phase 2 March 10, 2016 Project Proposal - Idea Stage Project Leader: PC Wong Project Facilitator: John Davignon © 2016 HDP User Group.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Effects of Component Rework on Reliability rev01 Khaw Mei Ming - Keysight HDP User Group Project Meeting 4 th May 2016 © HDP User Group International,
IPC Special Tooling During the formal design review prior to layout, special tooling that can be generated by the design area in the form of.
Digital Speckle Correlation
HDPUG Project Proposal Determining a better CAF acceleration equation
Introducing pdri for mega projects As a Planning quality Control tool
ShenZhen SiSolver Technologies Co..Ltd
N9000 Materials Coppers July 2016.
Digital Image Correlation Idea Phase Project
Measurement-Simulation Correlation of High Frequency PCB Interconnects
Park/Nelco N Next Generation High Tg FR-4
6.1 Alternating current and power
Commercial Building Project Portfolio
Supply Chain Management
Single phase motors are very widely used in home, offices, workshops etc. as power delivered to most of the houses and offices is single phase. In addition.
EEE161 Lab Plan As of 11/13/2017.
What determines impedance ?
EEE161 Lab Plan As of 11/13/2017.
© 2016 HDP User Group International, Inc. All rights reserved
Phase Transition Example
Facility Location Part 1
PULSE Building Renovation
7e Applied EM by Ulaby and Ravaioli
Presentation transcript:

High Frequency Test Methods for Laminate Materials (HF) Project 10/17/10 High Frequency Test Methods for Laminate Materials (HF) Project HDPUG May 18, 2011 ©HDP User Group International, Inc. 1

10/17/10 Project Goals Phase I: Electrically test commonly used high frequency (below IPC 0.010 Df) laminate materials: * Including all commercial “halogen-free” laminate materials, not “new” materials (not in volume production) * Using all viable electrical test methods for speeds above 2 GHz. Phase II: Reliability testing including IST test coupons from common test vehicles made using the “halogen-free” laminate materials. Note: The term “halogen-free” used herein refers to bromine or brominated compounds not being used in the resin formulation. ©HDP User Group International, Inc. 2

10/17/10 Project Details 1) Determine the lower loss laminate materials to be tested. Ref. Slide #5: Draft list of set of these laminate materials to be tested. 2) Phase I testing to include several baseline non-halogen-free laminate(s). Examples: Isola 408HR and/or IS-415. 3) Standardize on available copper foil type with controlled, constant copper roughness and dielectric construction. 4) In a later phase potentially evaluate alternate constructions. 5) Testing a) Loss Tangent(Df)and Er (Dk) at 2 GHz, 10 GHz, up to 40-50 GHz where possible, all completely dried with 0X or 6X 260 C preconditioning. * Test Methods: SPP(IBM), SET2DIL(Intel), Bereskin Stripline, EBW, Stripline (IPC 2.5.5.5), Split Post Dielectric Resonator Cavity (IPC 2.5.5.13), Tri-plate Line Resonator (JPCA-TM001), CISCO. ©HDP User Group International, Inc. 3

Project Details, Cont. 5) Testing, Cont. b) IST Testing (Phase II) 10/17/10 Project Details, Cont. 5) Testing, Cont. b) IST Testing (Phase II) * Preconditioning 6X at 260 C * 500 Cycles, Peak Temp 150 C * Weibull Plot of failures * Crossection checks for delamination ©HDP User Group International, Inc. 4

10/17/10 Laminate Materials Draft list high frequency laminate materials includes the following halogen-free laminate materials; Df (0.007 to 0.015 @ 2 GHz): * EMC EM-828 * EMC EM-285 * EMC EM-370-D * Grace GA-HF-17 * Hitachi 679(HE) * Hitachi 679H * Hitachi 67(G,H) * Hitachi LZ-71G * ITEQ IT-170GRA * ITEQ IT-168G * Panasonic R-1566W * TUC TU-862HF ©HDP User Group International, Inc. 5

10/17/10 Project Milestones 1) Generation of standard test board design and construction stackup. 2) Suppliers commit to supply the laminate materials to be tested. 3) Labs/test sites committed for the before and after 6X at 260 C preconditioning. 4) Labs/test sites committed to perform the Loss Tangent(Df)and Er (Dk) at 2 GHz, 10 GHz, and up to 40-50 GHz where possible. * SPP(IBM) * SET2DIL(Intel) : * Bereskin Stripline(Isola) : * EBW, Stripline (IPC 2.5.5.5) : * Split Post Dielectric Resonator Cavity (IPC 2.5.5.13) : * Tri-plate Line Resonator (JPCA-TM001) : 5) Phase II labs/test sites committed. ©HDP User Group International, Inc. 6

Project Participants 10/17/10 ©HDP User Group International, Inc. 7 Members of this list: alun.morgan@isola-group.com <mailto:alun.morgan@isola-group.com> anderson@iteq.com.tw <mailto:anderson@iteq.com.tw> chris.katzko@meadvillegroup.com <mailto:chris.katzko@meadvillegroup.com> david.love@oracle.com <mailto:david.love@oracle.com> dsenk@cisco.com <mailto:dsenk@cisco.com> eric.scivier@viasystems.com <mailto:eric.scivier@viasystems.com> erkko.helminen@meadvillegroup.com <mailto:erkko.helminen@meadvillegroup.com> fischer@hitachi-chemical.com <mailto:fischer@hitachi-chemical.com> fish5er@hdpug.org <mailto:fish5er@hdpug.org> geying@syst.com.cn <mailto:geying@syst.com.cn> heidi.reynolds@oracle.com <mailto:heidi.reynolds@oracle.com> joseph.smetana@alcatel-lucent.com <mailto:joseph.smetana@alcatel-lucent.com> ken-ikeda@hitachi-chem.co.jp <mailto:ken-ikeda@hitachi-chem.co.jp> kikuchi.shun@jp.fujitsu.com <mailto:kikuchi.shun@jp.fujitsu.com> lhutchin@juniper.net <mailto:lhutchin@juniper.net> mahu@cisco.com <mailto:mahu@cisco.com> marika.immonen@meadvillegroup.com <mailto:marika.immonen@meadvillegroup.com> marsh57@hdpug.org <mailto:marsh57@hdpug.org> michael.freda@oracle.com <mailto:michael.freda@oracle.com> monique.mayr@isola-group.com <mailto:monique.mayr@isola-group.com> mweinhold@eipc.org <mailto:mweinhold@eipc.org> swilkins@juniper.net <mailto:swilkins@juniper.net> sylvia.ehrler@de.multek.com <mailto:sylvia.ehrler@de.multek.com> yangzq@syst.com.cn <mailto:yangzq@syst.com.cn> ©HDP User Group International, Inc. 7

10/17/10 Tentative Schedule Laminate manufacturers commit to providing test materials ’10, 09/01 10/01 2011 02/01 04/01 Work on test board design starts Test board design completed and laminate materials ordered Test boards shipped to labs for Dk, Df testing IST coupon testing completed 06/01 08/01 09/01 10/01 11/01 Laminate materials received at fabricator Dk, Df reports completed and IST testing starts Final reports completed ©HDP User Group International, Inc. 8