StarBase Intensity Interferometry Update D. Kieda, N. Matthews, N. Traeden, J. Skowronek University of Utah SII Workshop May 13, 2014 5/13/2014 Observatorie.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

Exploiting VERITAS Timing Information J. Holder a for the VERITAS Collaboration b a) School of Physics and Astronomy, University of Leeds, UK b) For full.
Trigger issues for KM3NeT the large scale underwater neutrino telescope the project objectives design aspects from the KM3NeT TDR trigger issues outlook.
Arecibo 40th Anniversary Workshop--R. L. Brown The Arecibo Astrometric/Timing Array Robert L. Brown.
Calibration for LHAASO_WFCTA Yong Zhang, LL Ma on behalf of the LHAASO collaboration 32 nd International Cosmic Ray Conference, Beijing 2011.
Use of floating surface detector stations for the calibration of a deep-sea neutrino telescope G. Bourlis, N. A. B. Gizani, A. Leisos, A. G. Tsirigotis,
3mm amplitude test by Cheng-Jiun Ma. Observation Source : Orion SiO Frequency: GHz 256 channels within 64MHz bandwidth Ant 3 & Ant 4 no Tsys correction.
Implement a 2x2 MIMO OFDM-based channel measurement system (no data yet) at 2.4 GHz Perform baseband processing and digital up and down conversion on Nallatech.
Radio `source’ Goals of telescope: maximize collection of energy (sensitivity or gain) isolate source emission from other sources… (directional gain… dynamic.
CTA Consortium meeting – DESY, Berlin/Zeuthen; May 2010
Radio Telescopes Large metal dish acts as a mirror for radio waves. Radio receiver at prime focus. Surface accuracy not so important, so easy to make.
Cosmic Ray Test Stand with Scintillating Cells for Digital Hadron Calorimeter As of 9am 05/19/2003.
A SINGLE FREQUENCY GPS SOFTWARE RECEIVER
Connectivity Lab University of California, Berkeley Location and Timing with C/A code in GPS Wanbin Tang Jan 24, 2007.
Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
Ionization Profile Monitor Front End (IFE) System Presenter: Kwame Bowie PPD/EED Phone: (630)
How The GPS System Works. How the GPS System Works 24 satellites + spares 6 orbital planes 55° inclination Each satellite orbits twice every 24 hours.
Zurich PhD seminar, August Arno Gadola A new camera concept for Cherenkov telescopes.
Special Issues on Neutrino Telescopy Apostolos G. Tsirigotis Hellenic Open University School of Science & Technology Particle and Astroparticle Physics.
Intensity Interferometry at Southern Connecticut State University WORKING TOWARD THE INTERFEROMETER IN A SUITCASE Elliott Horch, Southern Connecticut State.
A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.
1 DAQ Update. 2 DAQ Status DAQ was running successfully and stably in ’07 beam time Trigger bus scheme has proven to be very flexible – Added additional.
Gretina data flow and formats Chris Campbell LBL.
RADAR Detection of Extensive Air Showers Nils Scharf III. Physikalisches Institut A Bad Honnef Nils Scharf III. Physikalisches Institut A Bad.
FPGA-based Dedispersion for Fast Transient Search John Dickey 23 Nov 2005 Orange, NSW.
Special Issues on Neutrino Telescopy Apostolos G. Tsirigotis Hellenic Open University School of Science & Technology Particle and Astroparticle Physics.
High Bandwidth Data Acquisition and Network Streaming in VLBI Jan Wagner, Guifré Molera et al. TKK / Metsähovi Radio Observatory.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
Monitoring the Galactic Center with the Long Wavelength Array Greg Taylor (UNM) on behalf of the Long Wavelength Array Collaboration
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
The BEST-2 SKA pathfinder is composed by 32 receivers. The front ends are installed on the focal lines of 8 cylinders, offering a collecting area of about.
Casper 2010Marc Torres Part 2: Building blocks for the next generation.
Anadian ydrogen ntensity apping xperiment CHIMECHIME CHIMECHIME WiggleZ Dark Ages Stars 13.7Gy CMB Big Bang Reionization 1100 z∞ SDSS 7Gy CHIME.
Jamie Holder University of Leeds August 2005 Status and Performance of the First VERITAS Telescope.
radio lobe sound disk  t p ~ km  optical light cone The Vision *) see e.g. A. Ringwald,ARENA 2005 Build ~100 km 3 hybrid detector to: Confirm GZK cutoff.
NESTOR SIMULATION TOOLS AND METHODS Antonis Leisos Hellenic Open University Vlvnt Workhop.
The Correlators ( Spectrometers ) Mopra Induction - May 2005.
Programmable logic device Time-to-digital converters 5 Volt DC power To PC serial port Four analog PMT inputs Discriminator threshold adjust GPS input.
Wireless communication Emmanuel Gyebison. Transmission Signals must be converted into digital values, using a circuit called ADC (Analog to Digital Converter),
CODALEMA A Cosmic Ray Radio Detection Array ICRC 2007, 3-11 July Merida, Mexico CODALEMA A Cosmic Ray Radio Detection Array Didier Lebrun, LPSC Grenoble.
The Cosmic Ray Observatory Project in Nebraska Conference on Teacher Research Experiences University of Rhode Island April 2005 An education and.
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
Design for Wide FOV Cherenkov telescope upgrading THE 2 nd WORKSHOP OF IHEP Shoushan Zhang Institute of High Energy Physics.
The Auger Observatory for High-Energy Cosmic Rays G.Matthiae University of Roma II and INFN For the Pierre Auger Collaboration The physics case Pierre.
Suijian Xue ( 薛随建 ) National Astronomical Observatories, Chinese Academy of Sciences JEJU, Korea Regional Report Astronomical Activities Update.
Dave Kieda & Stephan LeBohec University of Utah Department of Physics and Astronomy John Davis University of Sydney, NSW Science Potential of High Altitude.
June 6, 2006 CALOR 2006 E. Hays University of Chicago / Argonne National Lab VERITAS Imaging Calorimetry at Very High Energies.
KM 3 Neutrino Telescope European deep-sea research infrastructure DANS – symposium Maarten de Jong.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Hardware Engineering Requirements Review June 5, 2002 LBNL David Nygren.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
ARGONNE NATIONAL LAB G. Drake Electronics for Next-Generation Telescopes Oct. 21, 2005 p. 1.
Single Dish Summer School, Green Bank 2007 Things to do with Single Dish: VLBI Tapasi Ghosh NAIC/Arecibo Observatory Outline: Interferometry Basic.
Dave Kieda* for the VERITAS Collaboration *University of Utah Department of Physics & Astronomy.
M.P. Rupen, Synthesis Imaging Summer School, 18 June Cross Correlators Michael P. Rupen NRAO/Socorro.
Forschungszentrum Karlsruhe Erice, 7th July th International School for Cosmic Rays Astrophysics Motivation Energy Reconstruction Air Fluorescence.
DAQ Selection Discussion DAQ Subgroup Phone Conference Christopher Crawford
Isabella Amore VLV T08, Toulon, France April 2008 International Workshop on a Very Large Volume Neutrino Telescope for the Mediterranean Sea Results.
April / 2010 UFOCapture 1 UFOCaptureV2 Time-Shift-Motion-Detect-Video-Recording software for complete records of un-expected events.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
The VERITAS Trigger System A. Weinstein 1 for the VERITAS Collaboration 2 CFD x 499 (1 per pixel ) Pattern Trigger Shower Delay ( 1 PDM channel per trigger.
A Measurement of the Ultra-High Energy Cosmic Ray Spectrum with the HiRes FADC Detector (HiRes-2) Andreas Zech (for the HiRes Collaboration) Rutgers University.
Analysis of LumiCal data from the 2010 testbeam
Status of the Merlin Readout System
Status of Fast Controller EPICS Supports for ITER Project
Example of DAQ Trigger issues for the SoLID experiment
VERITAS Upgrade Overview Jamie Holder (Delaware)
August 19th 2013 Alexandre Camsonne
BUCKEYE has internal shift register which controls calibration
Operation and Control of 42 GHz Gyrotron system in ECRH
Presentation transcript:

StarBase Intensity Interferometry Update D. Kieda, N. Matthews, N. Traeden, J. Skowronek University of Utah SII Workshop May 13, /13/2014 Observatorie CA HBT Workshop

5/13/2014 Observatorie CA HBT Workshop

5/13/2014 Observatorie CA HBT Workshop

5/13/2014 Observatorie CA HBT Workshop

5/13/2014 Observatorie CA HBT Workshop

Digitizer System NI Flex-Rio digitizer Digitizer (250 Mhz sampling) & Virtex5 FPGA Front end (4 channels, 14 bit resolution (Truncate to 8 bit)) Record to high speed 12 TB RAID system (750 Mbyte/sec) Able to stream continuously for >6 hours Periodic GPS Time Stamp of FADC clock to better < 4 nsec rms 5/13/2014 Observatorie CA HBT Workshop

5/13/2014 Observatorie CA HBT Workshop Record all Streaming data: GPS timestamp Post Processing (2, 3,..N Telescope Coorrelations) FFT Analysis Develop/Apply Digital Filters to increase S/N

Filtered PMT Spectrum 5/13/2014 Observatorie CA HBT Workshop

DAQ System 5/13/2014 Observatorie CA HBT Workshop PMT/APD Preamp/Fi ber Optic transmitter Pxie BusVirtex -5 FPGA 250 Mhz A/D Conv CPU Streaming RAID Controller 12 TB 750 MB/Sec RAID GPS Clock I Gbit/sec 100 Mbyte/sec Pxie Backplane (4 Gbit/sec) Virtex-5 FPGA has multiple Parallell-pipline FFT cores Real time data- Filtering/coorrelation?

5/13/2014 Observatorie CA HBT Workshop Tele 1 Tele 2 Digital Filter y2y2 x2x2 x*y Pipelined Data Analysis This may be the only way of keeping up with the large dataflow in real time….. Auto-correlation Cross-correlation

Digitizer/Software Correlation tests with PMTs/Preamps Simulated Single PMT Measured Single PMT AutoCorrelation AutoCorrelation 5/13/2014 Observatorie CA HBT Workshop

5/13/2014 Observatorie CA HBT Workshop 2 PMT Cross Correlation: Noise Pickup between adjacent PMTs -Radio Crosstalk generated by RF noise from PMTs firing -Encase in RF shielding/Use Fiber optics to sample light 4nsec

5/13/2014 Observatorie CA HBT Workshop 2 PMT Cross Correlation: Residual Correlation -Cosmic ray secondary particles striking both PMTs -Cosmic ray charged particles fluorescing in fiber optic cable

Digitizer/Software Correlation tests with PMTs/Preamps Simulated 2-PMT Cross-correlation Measured PMT Cross-Correlation background 2G events seeded correlation = 1e-3 correlation noise < 1E-4 We should be able to measure correlation with excellent accuracy! 5/13/2014 Observatorie CA HBT Workshop

SII Lab Measurement/Hole diameters (Laser/Rotating Disk) 5/13/2014 Observatorie CA HBT Workshop

5/13/2014 Observatorie CA HBT Workshop

5/13/2014 Observatorie CA HBT Workshop

5/13/2014 Observatorie CA HBT Workshop Telescope Tracking Control System: LabView Based Servo System Remnant of “Telescope Array 1999”

5/13/2014 Observatorie CA HBT Workshop Observed tracking Performance: Alpha Lyrae Tracking Error < 0.01°

5/13/2014 Observatorie CA HBT Workshop

5/13/2014 Observatorie CA HBT Workshop

5/13/2014 Observatorie CA HBT Workshop

5/13/2014 Observatorie CA HBT Workshop Star Observations (April 2014): αLeo (Regulus): V = ε Leo (Algenubi) V= Single Telescope Observations Study Telescope tracking Night Sky Noise Interference noise Needs some further investigation, pipelined filtering? Two Telescope Observations In Summer 2014 Test SII & Pipelined RT analysis NSB VSCEL cutoff Signal VSCEL Filter ??

Observation times with the StarBase telescopes StarBase: For T= 15 min ( V =1 ) T= 97 min (V = 2) StarBase Baseline: 23m Unresolved < 1 mas (400 nm) Examples: α Leo, β Tau or η Uma 5/13/2014 Observatorie CA HBT Workshop

5/13/2014 Observatorie CA HBT Workshop

5/13/2014 Observatorie CA HBT Workshop Future  Testing at StarBase Summer 2014: 2-telescope correlations  Testing at VERITAS (late 2014?)  CTA observatory Need to write Science Requirements, Level A/B requirements Technical Design review period ending (30 days) After TDR design gets frozen: Difficult to add after! High priority: Need to form working group!

5/13/2014 Observatorie CA HBT Workshop CTA Design Questions  Photo-detectors (SST, MST, LST, SCT)  Telescope-to-Telescope digitization synchronization (< 2 nsec)  Digitization/Storage requirements  Data processing requirements  Real Time Monitoring  Higher order correlations