1 Regulatory Developments and Impacts Involving Electricity Storage in Texas Elizabeth Drews 31 st USAEE/IAEE North American Conference Austin TX, November.

Slides:



Advertisements
Similar presentations
Distributed Generation (DG)
Advertisements

NARUC The 21 st Century Grid 1 Energy Consumption Ancillary Services Traditional Power Generation Solar Generation Commercial and Industrial Transmission.
Federal Energy Regulatory Commission Large Generator Interconnection Order on Rehearing (Order No A) RM March 3, 2004.
Demand Response in the Reliability Pricing Model Chuck Whitlock.
1 TTP Texas Technology Partners Sierra Club Earth, Wind and Fire Energy Summit The Future of Energy Fuel Sources Texas Technology Partners
Electricity Restructuring Will Texas Be the Next California? Robert J. Michaels California State University, Fullerton and Econ One Research, Inc. I. A.
Citizens League Electrical Energy: Affordability and Competitive Pricing Working Team Electric Transmission.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
Federal Energy Regulatory Commission Proposed Rule on Small Generator Interconnection RM July 23, 2003.
Electric Utility Basics An overview of the electric industry in New England and the operation of consumer-owned utilities 1.
Advanced Technologies in the Texas Electric Market
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Applications and Benefits of Energy Storage Maui, Hawaii June 16, 2010 Garth P. Corey, Consultant Sandia National Laboratories Sandia is a multiprogram.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE Emerging Technology Working Group, September 17 th, 2015 Cyrus Reed, Lone Star Chapter, Sierra.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
The Texas Renewable Energy Program National Governors Association Scottsdale, Arizona April 29, 2004.
Current DG Framework for Competitive Areas of ERCOT DREAM TF September 28, 2015.
Small Renewable Generators Tony Marciano Public Utility Commission of Texas May 2, 2007 (512)
Political Factors Affecting the Renewables and Energy Efficiency Remarks of Ron Binz, Chairman Colorado Public Utilities Commission October 15, 2010 IPPAI.
September 5,  Mission - To provide Excellent Service to Our Distribution Members by creating opportunities, cultivating cooperation, and navigating.
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
Bulk Power Transmission System
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Florida’s Electric Capacity and Fuel Needs Presentation by: James Dean Florida Public Service Commission to the: House Utilities and Telecommunications.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Utah Geothermal Power Generation Workshop Regulatory Issues August 17, 2005 Presented by Becky Wilson Utility Economist Utah Public Service Commission.
DREAM November Meeting. Agenda Introduction and Expectations Path to becoming a Resource Node – ERCOT Registration process for non-modeled resources –
Promoting Distributed Generation Resources Through State Initiatives Ed Ethridge Public Utility Commission of Texas Distributed Resources in Restructured.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Hawaii Energy Storage Seminar: Utility Regulation Service
ERCOT MARKET EDUCATION Retail 101. Legal Disclaimers and Admonitions PROTOCOL DISCLAIMER This presentation provides a general overview of the Texas Nodal.
Overview of the Grid Clean Power Plan and Tribes October 15, 2015 webinar.
Distributed Generation Registration June 30, 2008.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
©2003 PJM North American Markets Status APEx Seoul, Korea October 29-31, 2006 Kenneth W. Laughlin.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
1 A Conversation about MISO Paul Spicer November 8, 2007.
ERCOT MARKET EDUCATION
Asia-Pacific Energy Regulatory Forum
The New Texas Wholesale/Retail Market
Energy Storage Settlements Consistent with PUCT Project & NPRR461
North American Markets Status
31st USAEE/IAEE North American Conference
The Need for Compensatory Standby Rates
Forecasting and Operations CAISO Case
Energy Storage System Drivers and Use Cases for Energy Storage Systems
Presentation transcript:

1 Regulatory Developments and Impacts Involving Electricity Storage in Texas Elizabeth Drews 31 st USAEE/IAEE North American Conference Austin TX, November 4-7, 2012

2 The usual disclaimers This is not legal advice or legal services This is no one’s opinion but mine, & might not stay mine This is a summary Laws & facts change

33 Why storage could especially benefit ERCOT ERCOT’s Electrical isolation from other grids > 11,000 MW wind (# 1 in US, # 6 in world, > 2,000 MW coastal) 12,277 MW by 2014 Growing demand Potential capacity shortfalls Nodal market design

4 Where would storage fit in ERCOT? Capacity, Demand, Reserves Report (May 2012)

5 Generation under study in ERCOT * * No firm commitment to build + Calculated at 8.7% of nameplate capacity Fuel type Cancelled studies (MW) Suspended studies (MW) Active studies (MW) Gas1,9392,8908,317 Nuclear5,900 Coal3,635 Wind ,0921,560 Solar Biomass Storage906 Other 7001,480 Total7,40021,74716,854 Peak demand 68,379 MW Wind record 8,368 MW (17.64% of 47,452 MW load) of which 7,381 non- coastal

6 Some IPP storage development in Texas Compressed Air Energy Storage Battery Apex: 275 MWAES: 40 MW Chamisa: 270 MW, expandable to 810 MW Xtreme/Duke: 36 MW, behind meter w/ wind ConocoPhillips: behind meter w/ wind or solar Source: filings in Public Utility Commission of Texas (PUCT) Projects 39764, 39917, 41026

77 Some uses of electricity storage Energy time-shift Peak shave Ancillary services Reliable power in outage Address voltage, frequency variations Transmission support ↓ transmission congestion Defer T&D upgrades Adapted from PUCT 2011 Scope of Competition Report

88 Generalized attributes of storage technologies CAESBattery Can inject for hours-daysCan inject ≤ hour Can respond to grid needs in minutes Can respond to grid needs in seconds Hundreds of MWTens of MW, modular $ hundreds of millions$ 1-10 million 2 years to build1 year to build Must be near cavern or similar, TX has Attributes/capabilities vary by project & technologies are evolving

99 Regulatory limits on uses of ERCOT storage In non-retail choice areas, utility, coop, muni can own G&T Can own storage that serves both functions In retail choice areas, utility owns T&D, power generation company owns generation Protects competition Keeps storage from supplying & being paid for all its uses

10 Storage as transmission PUCT Docket 35994, ETT Transmission/distribution utility owns 4 MW battery to help voltage & delay transmission in remote area, does not own or sell energy from the battery PUC: transmission asset, can put in rate base Operational since 2010

11 Storage as generation 2011 statute (SB 943) – Texas storage: Intended to sell energy or ancillary services at wholesale is generation May interconnect, obtain transmission service, sell electric energy & ancillary services at wholesale consistent w/ TX law re: power generation company or EWG Must register as power generation company

12 PUCT pricing rule on storage (2012, Project 39917) 3 main decisions Electricity purchases by storage for charging are wholesale, not retail (same as FERC) Such electricity purchases are settled nodally (at bus that connects the storage facility), not zonally like a load Retail transmission & ancillary service charges do not apply to such electricity purchases

13 ERCOT rule changes, integration issues ERCOT’s Emerging Technologies Working Group IDs & proposes changes to ERCOT requirements that preclude market participation of emerging technologies Has addressed # issues relating to storage Is developing a list of operations issues relating to storage

14 PUCT ERCOT pilot project rule (2012, Project 40150) Allows ERCOT pilot projects for storage/other ET ERCOT may temporarily exempt pilot participants from specific ERCOT requirements ERCOT board must approve pilot project; board decision appealable to PUCT Rule leaves many issues, e.g. cost allocation & post-pilot transition if any, to ERCOT pilot review process to resolve

15 Pilot projects at ERCOT ERCOT posts documents for each pilot project on its website ERCOT has been working on a pilot project for a Fast Responding Regulation Service (similar to FERC Order 755, “pay for performance”)