COMAR 26.11.36 Distributed Generation Conceptual Amendments June 2013.

Slides:



Advertisements
Similar presentations
BG&E’s PeakRewards SM Demand Response Program Successful Approaches for Engaging Customers August 20, 2014.
Advertisements

Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
RICE MACT and Oil Analysis
The Reciprocating Internal Combustion Engine (RICE) MACT Summary
Reciprocating Internal Combustion Engine (RICE 4Z) Rule Reciprocating Internal Combustion Engine (RICE 4Z) Rule Robin Barrows Supervisor, Allied Programs.
Emergency Engine Emissions Standards
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
The California Energy Crisis Continuing Update Lon W. House, Ph.D ACWA Energy Advisor.
PECO Smart Ideas Energy Efficiency Programs
New Emission Rules for IC Engines Presented by Scott Wallace Devon Gas Services, L.P.
New Federal Regulations for Internal Combustion Engines Doug Parce.
Indiana’s Clean Energy Credit Program (Energy Efficiency & Renewable Energy Set-aside) Roger Letterman Sr. Environmental Manager Office of Air Quality.
Managing Environmental Issues with Hospital Expansion Projects Tank, Generator, and Boiler Installations from an Environmental Permitting Perspective Chris.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
Electrical Billing and Rates MAE406 Energy Conservation in Industry Stephen Terry.
Solutions to California’s Energy Crisis: Real-Time Pricing by Frank Wolak Chairman, Market Surveillance Committee March 17, 2001.
ON IT 1 Con Edison Energy Efficiency Programs Sustaining our Future Rebecca Craft Director of Energy Efficiency.
Compliance Update NCMA 2015.
Blue Skies Delaware; Clean Air for Life Stationary Generators, Regulatory Requirements and Permitting State of Delaware DNREC - Air Quality Management.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
Power Utilities in the Telecom Business in the USA: Past Failures and Future Trends Mike Oldak Vice President & General Counsel Utilities Telecom Council.
Use of Emergency Engines for Emergency DR Is Good Policy June 24, 2013.
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
Proposed Revisions to Colorado Air Quality Control Commission Regulation No. 7 Garry Kaufman Air Pollution Control Division Air Pollution Control Division.
Demand Side Management The Natural Purview of Utilities The Customer Viewpoint Rates on the Rise in a Rough Economy - Responding to New Realities Marketing.
Maricopa County Air Quality Department 1001 North Central Ave. Phoenix, Arizona Maricopa County Air Quality Department Protecting and improving our.
Mustang Watchdog April 22, 2014
Overview of Distributed Generation Technologies June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Cogeneration at UC July 18, Welcome 3 Transformation of the Power Plant POWER PLANT CENTER OF CAMPUS CENTRAL UTILITY PLANT 2007.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
© 2013 McNees Wallace & Nurick LLC October 17, 2013 Robert A. Weishaar, Jr. ON SITE ENERGY – INTERPLAY WITH PJM DEMAND RESPONSE PROGRAMS Harrisburg, PA.
What’s Coming Down with Energy in California Lon W. House, Ph.D ACWA Fall Conference 2003 San Diego, CA.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Standby Generators & Demand Response What is Demand Response Why Demand Response Works PJM‘s DR Programs Financial Benefits Participation Requirements.
PERMITTING ELECTRIC GENERATING UNITS Jim Linville & Erik Hendrickson Air Permits Division.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Our Vision – Healthy Kansans living in safe and sustainable environments.
Net Metering Fall 2009 Customer Meetings. What is Net Metering?  Net metering allows the meter to “run backwards” and record generation in excess of.
Page 1 Schedule Experimental Energy Reduction (EER) updated 2005 Note: This program is available to qualified participants within the EntergyArkansas,
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Air Quality Benefits from Energy Conservation Measures Anna Garcia April 2004.
PRIVILEGED & CONFIDENTIAL Reciprocating Internal Combustion Engine (RICE) Regulatory Update American Public Power Association June 8, 2010.
OVERVIEW OF ISSUES DR AND AMI HELP SOLVE Dr. Eric Woychik Executive Consultant, Strategy Integration, LLC APSC Workshop on DR and AMI.
Summer 2004 and Beyond Lon W. House, Ph.D ACWA/Edison Joint Presentation June 24, 2004.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
Chicago Advanced Energy Demand Response & CSP Evolution Kellen Bollettino Comverge Inc. 10/23/14.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Update on Methane Regulations Affecting Landfills Pat Sullivan Senior Vice President SCS Engineers Nov. 10, 2015.
Governor’s Clean Energy GREEN TEAM Annual Statewide Air Quality Conference May 10, 2001.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
PPL Electric Utilities Act 129 Phase 3 Non-Residential Programs April 20, 2016.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
BGE Smart Grid Initiative Stakeholder Meeting September 17, 2009 Wayne Harbaugh, Vice President, Pricing and Regulatory Services.
State of Virginia Energy Managers 2016 Leigh Anne Ratlitf Account Management and Sales Integrated Demand Resources (iDR)
First in Service First in Value
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
Leveraging Energy Infrastructure to Drive Revenue
Simple but Complicated Air Quality Permitting for Generators
Demand resource emergency energy measurement and verification
Boiler Sheltered Initiative
Energy Conservation CERD /12/2017
City Council April 30, 2018 Item 13
NYS Department of Public Service
COMAR Distributed Generation Conceptual Amendments
Use of Emergency Engines for Emergency DR Is Good Policy June 24, 2013
Wholesale Electricity Costs
Presentation transcript:

COMAR Distributed Generation Conceptual Amendments June 2013

22 Background PJM electricity markets Research shows increased likelihood that emergency generators will be operating. Emergency Backup Generators can be very old and lack current technologies for emission controls Maryland Distributed Generation regulation was a good start, recognized emerging markets and allowed flexibility. We now have conclusive numbers that show more than 9 tons of NOx can be emitted in one event/day in Maryland.

33 Concerns The electricity markets deploy all eligible supply-side and demand-side resources without consideration of respective environmental performance. Demand Response (DR) programs provide financial incentives for the use of uncontrolled backup generators on the hottest summer days, when conditions would be most conducive to the formation of ground-level ozone. Most stationary generators are fired with diesel fuel and are uncontrolled. The combustion of diesel fuel releases significantly more NOx emissions per unit of power compared to the generation of electricity from well-controlled power plants.

44 Proposed MD DG Regulations Revise definition of “Emergency Generator” to exclude all DR programs –A “Load shaving unit” is a generator that operates for other than emergency –New – all PJM Economic AND Emergency DR is load shaving –“Peak Shaving” is running a generator to offset a utility bill demand charge, under PJM program or not. Peak shaving is load shaving PJM Emergency DR generators will have emission restrictions for NOx

55555 Proposed MD DG Amendments COMAR Permit required for engines 500 hp or above. And ADD all load shaving engines, 100 hp and above. COMAR All DR programs are load shaving and need non- emergency permit. {Emergency DR = load shaving} NOx rate 1.4 g/bhp-hr for existing load shaving (prior to 2015) NOx rate 0.5 g/bhp-hr for new load shaving (after 2015) Delete 10 hour allowance for storm avoidance or other non-emergency hours. Delete purchase of NOx allowances to offset emissions in

66 How to comply To meet strict NOx emission rates, NOx controls will likely need to be installed. Manufacturer Guarantee. Install new Tier 4 generator. EPA Certified. Permits will need to be obtained or revised. –MDE will require all generators in any DR Program or performing Peak Shaving to obtain a Permit to Contruct (PTC) –Load shaving units are permitted with 8760 hours –Multiple engines and other equipment on site can trigger Permit to Operate (PTO). Alternative, don’t run generator for DR event, instead reduce KW usage only, and still get paid.

77 Reasons for Proposed Amendments Why more strict now? Tighter federal ozone standard and Maryland 2008 Ozone Status Need for local NOx controls PJM DR expansion in the market may preclude cleaner generation Maryland CSP reports confirm generators are running To adopt the OTC Model Rule standards

PJM DR Growth Market Growth In the market DR was 6% (or 9,052 MW of the total 154,074 MW). In the market DR has been bid over 9% (or 14,833 MW of the total 164,561 MW). Emission Estimate 15GW in DR the overall PJM region in 2015, if 50% is supplied by back-up generators, then 490 tons of NOx can be emitted in one 6-hour event. (Maryland would be 36 tons)

99 Demand resources growing in New England and PJM Data from ISO New England and PJM website 15,000 MW in 2015

10 PJM Future PJM Market Analyst predicts number of Emergency DR events will increase from 1-4 per year to 5-9 per year based on market growth. PJM is evolving programs to ensure reliability. Complexity in the market and possible future programs with unlimited hours of availability have provoked the Department to review regulations.

11 Three Product Types available beginning in the 2014/2015 DY RequirementLimited DRExtended Summer DRAnnual DR AvailabilityAny weekday, other than NERC holidays, during June – Sept. period of DY Any day during June- October period and following May of DY Any day during DY (unless on an approved maintenance outage during Oct. - April) Maximum Number of Interruptions 10 interruptionsUnlimited Hours of Day Required to Respond (Hours in EPT) 12:00 PM – 8:00 PM10:00 AM – 10:00 PMJun – Oct. and following May: 10 AM – 10 PM Nov. – April: 6 AM- 9 PM Maximum Duration of Interruption 6 Hours10 Hours NotificationMust be able to reduce load when requested by PJM All Call system within 2 hours of notification, without additional approvals required Registration in eLRSMust register sites in Emergency Load Response Program in Load Response System (eLRS) Event ComplianceMust provide customer-specific compliance and verification information within 45 days after the end of month in which PJM-initiated LM event occurred. Test ComplianceIn absence of the PJM-initiated LM event, CSP must test load management resources and provide customer-specific compliance and verification information. Slide courtesy of PJM

12 Concerns Emergency generators bid into the PJM forward capacity market can displace other controlled technologies such as natural gas combustion turbines. Actual numbers of backup generators have been undocumented by RTO’s. (thus extensive emissions can be predicted) The Department supports DR load shedding or passive curtailment (ex.HVAC, lighting control).

13 COMAR Curtailment Service Provider Reporting 2011 & 2012 Answered the Question - Who is running a generator? Industrial facilities Hospitals Shopping centers Aggregated residential (through smart meter reductions) All types of business’ 30% of all facilities reported use of a generator.

14 CSP 2011 Data 12 CSP companies submitted a report 1100 Facilities in a DR program 470 generators, approximately ½ have identified a MD registration number. (The other ½ were marked as unknown or smaller than 500 hp) Many facilities had more than one generator Mean age of generators was 2002 Approx. 3% of 2011 contracts reported were for Economic DR therefore 97% are Emergency DR = Limited PJM program 14

15 MD Generators in DR Estimate 3,000 generators in the State 470 generators reported 30% of facilities reporting using a generator, therefore 70% of facilities used curtailment practices only However looking at reported MWh totals vs. participation in 7/22/11 Emergency DR event 45% used BUG and 55 % curtailment only PJM BGE zone reported approx. 900 MW reduction by Emergency DR at peak hour 15

16 Detailed Estimate 2011 Maryland data for 7/22/ generators reported 9 tons NOx emitted in 7-hour event based on generator age and assumed emission factors (range from 7.4 – 2 g/bhp-hr) Applied NOx control to 1.4 g/bhp-hr for generator over 450hp Reduced NOx emissions by 5 tons for the 7-hour event

17 Regional 2011 Data NESCAUM Report Aug On July 22, 2011, PJM 7-hour event backup diesel generator participation emission estimates –109 tons of NOx in the region –3 tons of PM in the region For the region, July 21 and July 22 also coincided with the highest ozone readings that month. For the New York City metropolitan area the highest ozone level recorded in 2011 occurred on July 22, 2011.

18 Federal Standards EPA final rulemaking Jan. 30, 2013 stationary ICE NSPS and NESHAP A stationary reciprocating internal combustion engine means any RICE, except combustion turbines, that converts heat energy into mechanical work and is not mobile. Federal NSPS – New and Modified 40 CFR 60 subpart JJJJ Stationary Spark Ignition ICE 40 CFR 60 subpart IIII Compression Ignition ICE Federal NESHAP – Existing and new 40 CFR 63 subpart ZZZZ – all engines at major and area source

19 Federal Standards Emergency engines have less strict emission requirements than non-emergency, both rules now allow 100 hours of participation in emergency demand respond while keeping emergency engine status. NSPS – Engines built after 2006 – Tiers with emission phase in. NESHAP – Existing and new engines – CO catalyst may be required for 500HP and above. May have Maryland more stringent load shaving status, with also an EPA non-emergency status.

20 OTC Model Rule 2011 – Emergency generators are part of Demand Response Program and would be considered non-emergency and would require emission limit for NOx, HC, CO and PM. Emergency generators can only run in “true emergency”, maintenance and testing. No other non-emergency run time. Emergency definition contains reference to 5% voltage or transmission deviation as an emergency.

21 OTC Model Rule 2011 All FuelNOxHCCOPM g/hp-hr Existing Engines New Engines – meet Tier 4 EPA rates New engines – using waste, landfill or digester gases to meet EPA rates

22 Other States DE & NJ – Generators in any DR program need to permit as non-emergency with required emission limits MA, NH & VA - Generators registered as emergency can be in “Emergency DR” only – equivalent of NERC EEA Level 2

23 Conceptual Amendments Want public attention to how they are offsetting power generation, and know that MDE is looking at smaller sources for local controls If a facility wants to run a generator in a DR program then they will need an efficient clean generator A facility can invest money gained from DR program into emission control Stick to using the emergency back-up generators for “True emergency”

24 Questions