Fifteen: Overview of Total Quality Tools

Slides:



Advertisements
Similar presentations
7 QC Tools.
Advertisements

Quality control tools
By: Dr. David L. Goetsch and Stanley Davis Based on the book
Copyright © 2010, 2007, 2004 Pearson Education, Inc. All Rights Reserved. Section 2-4 Statistical Graphics.
Basic Seven Tools of Quality
Copyright © 2010, 2007, 2004 Pearson Education, Inc. All Rights Reserved. Lecture Slides Elementary Statistics Eleventh Edition and the Triola.
Seven Quality Tools The Seven Tools
Slide 1 Spring, 2005 by Dr. Lianfen Qian Lecture 2 Describing and Visualizing Data 2-1 Overview 2-2 Frequency Distributions 2-3 Visualizing Data.
Slide Slide 1 Copyright © 2007 Pearson Education, Inc Publishing as Pearson Addison-Wesley. Lecture Slides Elementary Statistics Tenth Edition and the.
Copyright © 2010, 2007, 2004 Pearson Education, Inc. All Rights Reserved.Copyright © 2010 Pearson Education Section 2-3 Histograms.
Excel Charts – Basic Skills Creating Charts in Excel.
Chapter 8: Project Quality Management
Chapter 5. Methods and Philosophy of Statistical Process Control
Quality Control Chapter 8- Control Charts for Attributes
Agenda Review homework Lecture/discussion Week 10 assignment
Chapter 9- Control Charts for Attributes
Total Quality Management Tools
Copyright (c) 2009 John Wiley & Sons, Inc.
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
Chapter 2 Basic Tools for Improving Quality. 7 Basic Tools by Ishikawa Histogram Pareto chart Scatter plot Control chart Cheek sheet Cause-and-effect.
ISHIKAWA’S BASIC SEVEN TOOLS OF QUALITY
Chapter 18 Optimizing and Controlling Processes through Statistical Process Control.
Quality Control Tools A committee for developing QC tools affiliated with JUSE was set up in April Their aim was to develop QC techniques for.
Overview of Total Quality Tools
1 Software Quality Engineering CS410 Class 5 Seven Basic Quality Tools.
Graphical Analysis. Why Graph Data? Graphical methods Require very little training Easy to use Massive amounts of data can be presented more readily Can.
C ONTINUOUS Q UALITY I MPROVEMENT M ODEL The Deming cycle: Originally developed by Walter Shewart, but renamed in 1950s because Deming promoted it extensively.
Copyright © Cengage Learning. All rights reserved. 2 Descriptive Analysis and Presentation of Single-Variable Data.
To accompany Quantitative Analysis for Management, 9e by Render/Stair/Hanna 17-1 © 2006 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
Problem Solving.
BUILDING FROM THE BASICS GROUP B GROUP MEMBERS:ABIRA IMRAN HIRA ISHAQUE MARYAM YOUNUS SADIA QAYYUM SANA SHAKIL.
Seven Quality Tools The Seven Tools –Histograms, Pareto Charts, Cause and Effect Diagrams, Run Charts, Scatter Diagrams, Flow Charts, Control Charts.
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
Copyright © 2010, 2007, 2004 Pearson Education, Inc. All Rights Reserved. Elementary Statistics Eleventh Edition Chapter 2.
Slide Slide 1 Copyright © 2007 Pearson Education, Inc Publishing as Pearson Addison-Wesley. Lecture Slides Elementary Statistics Tenth Edition and the.
STATISTICS.
Copyright © 2010, 2007, 2004 Pearson Education, Inc. Section 2-2 Frequency Distributions.
Measure : SPC Dedy Sugiarto.
GrowingKnowing.com © Frequency distribution Given a 1000 rows of data, most people cannot see any useful information, just rows and rows of data.
Introduction to the Use of Classic Quality Tools Presented by Dr. Joan Burtner Certified Quality Engineer Associate Professor of Industrial Engineering.
SEVEN QUALITY CONTROL TOOLS (or) OLD SEVEN TOOLS.
Slide 1 Copyright © 2004 Pearson Education, Inc..
Managing Quality. Chapter4, Slide 2 ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Managing.
Total Quality Management. What is Quality? Quality is a relative concept. Quality is in the eye of the beholder Perfection Doing it right at the first.
Organize verbal information into a visual one, generally by writing down on separate pieces of paper AFFINITY DIAGRAM A sequenced plan.
Quality Improvement Tools CHAPTER SIX SUPPLEMENT McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Copyright © 2010, 2007, 2004 Pearson Education, Inc. All Rights Reserved. Section 4-2 Displaying Distributions with Graphs.
Seven Old Tools of Quality Management
Quality Control  Statistical Process Control (SPC)
1 Chapter 6 Quality Tools. 2 The Seven Basic Quality Tools. Flowcharts Check Sheets Histograms Pareto Analysis Scatter Diagrams Control Charts Cause-and-Effect.
The seven traditional tools of quality I - Pareto chart II – Flowchart III - Cause-and-Effect Diagrams IV - Check Sheets V- Histograms VI - Scatter Diagrams.
Data Collection & Analysis ETI 6134 Dr. Karla Moore.
THE 7 BASIC QUALITY TOOLS AS A PROBLEM SOLVING SYSTEM Kelly Roggenkamp.
Basic 7 Tools of Quality Presented by: Rajender Kumar, Asst. Prof.
Introduction to the Use of Classic Quality Tools Presented by Dr. Joan Burtner Certified Quality Engineer Associate Professor of Industrial Engineering.
Chapter 17 Process Improvement Using Control Charts Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Chapter 51Introduction to Statistical Quality Control, 7th Edition by Douglas C. Montgomery. Copyright (c) 2012 John Wiley & Sons, Inc.
QUALITY CONTROL CHAPTER 8.
Chapter 7 Process Control.
Total quality management
Fundamentals of Statistical Process Control
ISO 9000 Series A set of international standards on quality management and quality assurance developed to help companies effectively document the quality.
Quality Tools - 9/18/2018 Quality Tools -
CQE Handbook 3rd edition Ch. 27 Quality Control Tools
The Certified Quality Process Analyst Handbook 1st edition Chapter 9: Basic Quality Tools 2nd edition Chapter 3: Quality Tools Presented by Dr. Joan.
CQE Handbook 3rd edition Ch. 27 Quality Control Tools
The Certified Quality Process Analyst Handbook 1st edition Chapter 9: Basic Quality Tools 2nd edition Chapter 3: Quality Tools Presented by Dr. Joan.
Introduction to the Use of Classic Quality Tools
Quality Tools - 2/19/2019 Quality Tools -
Run Charts Slide 1 of 3 Run Charts Defined
Presentation transcript:

Fifteen: Overview of Total Quality Tools MAJOR TOPICS Total Quality Tools Defined The Pareto Chart Cause-and-Effect Diagrams Check Sheets Histograms Scatter Diagrams Run Charts and Control Charts Stratification Some Other Tools Introduced Management’s Role in Tool Deployment

Fifteen: Overview of Total Quality Tools Pareto charts are useful for separating the important from the trivial. They are named after Italian economist and sociologist Vilfredo Pareto. Pareto charts are important because they can help an organization decide where to focus limited resources. On a Pareto chart, data are arrayed along an X-axis and a Y-axis.

Pareto charts The Pareto principle suggests that most effects come from relatively few causes. In quantitative terms: 80% of the problems come from 20% of the causes (machines, raw materials, operators etc.); 80% of the wealth is owned by 20% of the people etc. Therefore effort aimed at the right 20% can solve 80% of the problems. Double (back to back) Pareto charts can be used to compare 'before and after' situations. General use, to decide where to apply initial effort for maximum effect.

Pareto charts There are six common steps to prepare a Pareto Diagram: Decide which data should be shown on your chart.  Decide on the time period for which you will collect the data.  Collect your data on a worksheet (e.g., from budgets, or from cost reports).  Construct your Pareto Diagram from the data you collected.  Arrange the data cells in descending order from the left of the graph.  Add the information to make your chart readable to other people.   

cause-and-effect diagram The cause-and-effect diagram was developed by the late Dr. Kaoru Ishikawa, a noted Japanese quality expert; others have thus called it the Ishikawa diagram. Its purpose is to help identify and isolate the causes of problems. It is the only one of the seven basic quality tools that is not based on statistics.

cause-and-effect diagram

cause-and-effect diagram

Histograms Histograms have to do with variability. Two kinds of data are commonly associated with processes: attributes data and variables data. An attribute is something that the output product of the process either has or does not have. Variables data are data that result when something is measured. A histogram is a measurement scale across one axis and a frequency of like measurements on the other.

Histograms Frequency Measurements

Histograms

Histograms In this abbreviated example, a bowler wants to improve her game.  Her scores, collected over a six-week period, look like this:          Week 1:  96, 130, 100          Week 2:  150, 135, 115          Week 3:  145, 148, 120          Week 4:  155, 110, 125          Week 6:  175, 135, 140  The cell widths will be 20 points.  These cells of scores have this distribution:            91 - 110 = 3          111 - 130 = 3          131 - 150 = 6          151 - 170 = 2          171 - 190 = 3 

Histograms

Histograms

Check Sheets The check sheet is a tool that facilitates collection of relevant data, displaying it in a visual form easily understood by the brain. Check sheets make it easy to collect data for specific purposes and to present it in a way that automatically converts it into useful information. A Check Sheet is a data recording form that has been designed to readily interpret results from the form itself. It needs to be designed for the specific data it is to gather. Used for the collection of quantitative or qualitative repetitive data. Adaptable to different data gathering situations. Minimal interpretation of results required. Easy and quick to use. No control for various forms of bias - exclusion, interaction, perception, operational, non-response, estimation. David Goetsch Quality Management, 5e Copyright ©2006 by Pearson Education, Inc. Upper Saddle River, New Jersey 07458 All rights reserved.

Check Sheets How to Construct: Clearly define the objective of the data collection. Determine other information about the source of the data that should be recorded, such as shift, date, or machine. Determine and define all categories of data to be collected. Determine the time period for data collection and who will collect the data. Determine how instructions will be given to those involved in data collection. Design a check sheet by listing categories to be counted. Pilot the check sheet to determine ease of use and reliability of results. Modify the check sheet based on results of the pilot.

Check Sheets Tips: Use Ishikawa diagrams or Brainstorming to determine categories to be used on the check sheet.   Construct an operational definition of each category to ensure data collected is consistent. Make check sheet as clear and easy to use as possible. Spend adequate time explaining the objective of the data collection to those involved in recording the data to ensure the data will be reliable. Data collected in this format facilitates easy Pareto analysis.

Scatter Diagrams The scatter diagram is arguably the simplest of the seven basic quality tools. It is used to determine the correlation between two variables. It can show a positive correlation, a negative correlation, or no correlation.

Scatter Diagrams

Scatter Diagrams

Scatter Diagrams

Scatter Diagrams

Flight delays at Midway A Services Example Flight delays at Midway Cause and Effect Diagrams Check Sheets Pareto Analysis

Problem: Delayed Flights No one is sure why, but plenty of opinions “Management by Fact” CI Tools we will use: Fishbone diagram Check sheets Pareto analysis

Cause and Effect Diagram ASKS: What are the possible causes? Root cause analysis — open and narrow phases

Generic C&E Diagram

Midway C&E diagram

Check Sheets (root cause analysis -- closed phase) Event: Day 1 Day 2 Late arrival II I Gate occupied Too few agents Accepting late passengers III (root cause analysis -- closed phase)

Pareto Analysis (sorted histogram) Late passengers 100 Late arrivals Late baggage to aircraft 85 70 Weather 65 Other (160)

Percent of each out of 480 total incidents ... Late passengers 21% Late arrivals 18% Late baggage to aircraft 15% Weather 14% Other 33%

Run Charts and Scatter Plots Measure Run Time Variable Y Scatter Variable X

Control Charts In the context of the seven total quality tools, run charts and control charts are typically thought of as being one tool together. The control chart is a more sophisticated version of the run chart. The run chart records the output results of a process over time. For this reason, the run chart is sometimes called a trend chart. The weakness of the run chart is that it does not tell whether the variation is the result of special causes or common causes. This weakness gave rise to the control chart.

Control Charts

Control Charts

Control Charts Data are plotted just as they are on a run chart, but a lower control limit, an upper control limit, and a process average are added. The plotted data stays between the upper control limit and lower control limit while varying about the center line or average only so long as the variation is the result of common causes such as statistical variation.

Control Charts In general, control charts are used to plot production values and variation over time. These charts can then be analyzed to determine if changes in production values or variation are due to the inherent variability of the process or a specific correctable cause. Control charts for variables are fairly straightforward and can be quite useful in material production and construction situations. Four popular control charts within the manufacturing industry are Control chart for variables.  Control chart for attributes.  Cumulative sum control chart.  Exponentially weighted moving average (EWMA) control chart. 

Control Charts Control chart for variables.  In variable sampling, measurements are monitored as continuous variables.  Because they retain and use actual measurement data, variable sampling plans retain more information per sample than do attribute sampling plans (Freeman and Grogan, 1998). This implies that compared to attribute sampling, it takes fewer samples to get the same information.  Because of this, most statistical acceptance plans use variable sampling. Control chart for attributes.  This chart is used when a number cannot easily represent the quality characteristic.  Therefore, each item is classified as "conforming" or "nonconforming" to the particular specification for the quality characteristic being examined.  These charts look similar to control charts for variables but are based on a binomial distribution instead of a normal distribution.  Two of the most common attribute control charts are for fraction nonconforming and defects.