Identifying and Evaluating Levee Improvement Alternatives – The City of West Sacramento Michael J. Vecchio, P.E. Watershed Planning and Design Sacramento,

Slides:



Advertisements
Similar presentations
18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
Advertisements

Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
Scoping Meeting Yuba Goldfields 200-Year Flood Protection Project Environmental Impact Report June 23, 2014.
BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
US Army Corps of Engineers BUILDING STRONG and Taking Care of People! Ecosystem Restoration Along the Los Angeles River: Creativity within Concrete Dan.
Permanent Protection System Opinion of Probable Cost May 2010 Courtesy USACE Photograph Courtesy USACE.
November 24, 2008 Agenda Purpose of Hearing Introductions Project Presentation Public Comment Period Southside Flood Control.
15 March 2012 WATERSHED Science & Engineering WEST Consultants.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7A APPLICATION NO
Levee Seepage: Concerns, Evaluations, and Solutions Pete Nix, P. E
June 23, 2011 Southwestern Illinois Council of Mayors.
IN-DELTA STORAGE PROGRAM STAKEHOLDERS COMMITTEE MEETING URS Corporation January 22, 2003 URS Corporation January 22, 2003.
Council Bluffs Value Engineering Workshop
May 14, 2014 RAMSHORN POND DAM REHABILITATION PUBLIC INFORMATION SESSION PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Proposed Replacement of the Herbert C. Bonner Bridge (Bridge No. 11) on NC 12 over Oregon Inlet TIP Project No. B-2500 Citizens Informational Workshops.
TRLIA Certification of Environmental Impact Report and Selection of Project for Feather River TRLIA Board Meeting: February 6, 2007 Briefer: Paul Brunner,
1 FEMA Flood Insurance Rate Map Update FEMA Public Meeting October 22, 2009.
International Boundary and Water Commission United States Section Engineering Services Division November 18, 2014 Levee Rehabilitation Projects Lower Rio.
October 17, 2011 League of Women Voters of Collinsville.
Flood Avoidance and Mitigation
Welcome Rob Rash CEO/Chief Engineer St
Hydraulic Screening and Analysis Needed for USACE Review
RIO VERDE AREA DRAINAGE MASTER PLAN
Mitigation and Community Sustainability Virginia Mitigation Summit, 2004.
Central Valley Flood Protection Board Meeting – Agenda Item No. 10A APPLICATION NOS and
1 Regional Report San Joaquin River Hydrologic Region.
Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.
Southside Flood Protection
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
NRCS Watershed Rehabilitation
California Geotechnical Levee Evaluation Program SAME/ASCE Midwest Levee Conference, June Mike Inamine California Department of Water Resources.
Local Adaptation Efforts Along the Massachusetts Coast Julia Knisel Coastal Shoreline & Floodplain Manager.
Three Rivers Levee Improvement Authority (TRLIA) Briefer: Mary Jane Griego, TRLIA Board Member Three Rivers Levee Improvement Authority March, 2007.
Alkali Creek Road Slope Stabilization and Stream Relocation The project scope changed after major rainfall caused slope failure jeopardizing safety and.
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
FEMA FLOOD INSURANCE STUDY UPDATES City Council Workshop July 7, 2008.
Responses to Levee Certification Requests 1.Closures 2.Maintenance Plans 3.U/S and D/S Levee Tie-ins.
Bijou Erosion Control Project Project Kickoff TAC Meeting May 4, 2007 City of South Lake Tahoe ENTRIX, Inc. California Tahoe Conservancy.
North Section 1 st Avenue to RR North Section NP to RR South Section 1 st Avenue to 4 th Street Levee South Section 1 st Avenue to 4 th Street Levee.
Overview Presentation for FMA 2007 NATOMAS INTERIOR LEVEE PROTECTION PLAN (NILPP)
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
DWR Maintenance Area Response to USACE Periodic Inspections Presented by: Noel Lerner, Chief, Flood Maintenance Office Mark List, Chief, Maintenance Support.
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
05C112011B Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master – Update Tracking.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
Yuba County Comprehensive Flood Protection Program
Oakcreek, Copperfield Court, and Coulee’s Crossing Area Flood Risk Management Project City of Fargo Oakcreek, Copperfield Court, and Coulee’s Crossing.
Presented to: Central Valley Flood Protection Board August 23, 2013 Sacramento Area Levee Accreditation Key Results from Encroachment Analysis.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
HDR | Presentation Update to Flood Project Working Group Shawn Gooch, P.E. City of Sparks February 27, 2008 North Truckee Drain Relocation Project.
2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)
U.S. Section International Boundary and Water Commission Rio Grande and Tijuana River Flood Control Projects Programmatic EIS.
1 Delta Risk Management Strategy Delta-Suisun Marsh Branch Department of Water Resources SCWC/SCWD MEETING JUNE 27, 2007.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
US Army Corps of Engineers BUILDING STRONG ® Miles City, Montana Section 205 Gwyn M. Jarrett - Project Manager Omaha District April 27, 2016.
BY ROY KROLL & COLIN KARK DIVISION of FLOOD MANAGEMENT FLOOD MAINTENANCE OFFICE.
City of Stockton Levee Flood Protection Status Report January 29, 2008 Agenda Item 4.03.
Presented By: Fran Borcalli, P.E. Program Manager
Henrico County Stream Assessment / Watershed Management Program
Water Quality Protection Zones
Study of Miles City Slough
FEMA FLOOD INSURANCE STUDY UPDATES
Sacramento Environmental Commission January 2019.
K Street, Sacramento – 1861/1862 Flood
Presentation transcript:

Identifying and Evaluating Levee Improvement Alternatives – The City of West Sacramento Michael J. Vecchio, P.E. Watershed Planning and Design Sacramento, CA PRESENTED AT: Association of State Flood Plain Manager’s Conference 20 May 2010

Purpose and Scope Analyze problems and opportunities associated with existing levee system and its upgrade Define levee system upgrade alternatives Evaluate alternatives with respect to technical adequacy, environmental and community impact, and construction costs Recommend upgrade alternatives for all currently deficient levee reaches

Levee Deficiencies Evaluated Geometry Freeboard Stability (static and rapid drawdown) Seepage (through- and underseepage) Erosion Seismic Vulnerability Vegetation*

Data Sources West Sacramento Levee System Problem Identification and Alternatives Analysis Volume 1: Geotechnical Problem Identification (Kleinfelder, 9/21/2007) Phase 1 Geotechnical Evaluation Report, West Sacramento (URS, 11/2007) West Sacramento Levee System: Problem Identification Report; Erosion Assessment and Treatment Alternatives (NHC, February, 2008) West Sacramento Levee Evaluation Project: Draft Problem Identification Report (HDR, 4/28/2008)

Planning Objectives Improve level of flood protection City Ordinance 07-11: 200-yr Flood Protection Certification under 44 CFR and Accredited by FEMA Flood protection objectives are primary Recreation and restoration objectives are secondary

Alternative Plans Single Deficiency Mitigation Measures Levee Deficiency Groups Combinations of Mitigation Measures Mitigation Alternatives Selection Criteria Mitigation Alternative Evaluation

Single Deficiency Mitigation Measures MeasureFreeboardThrough - SeepageUnderseepageSlope StabilityErosionExcess Vegetation In-Place Levee RaiseYesNo YesNo Adjacent Levee RaiseYes NoYes No FloodwallYesNo Cutoff WallNoYes No Jet GroutingNoYes No Sheet Pile WallsNoYes No Seepage BermNo YesNo Stability BermNoYesNoYesNo Relief WellsNo YesNo Slope FlatteningNoYesNoYesNo Interior DrainNoYesNoYesNo Setback LeveeYes NoYes Vegetation RemovalNo Yes

Deficiency Groups

Combinations of Mitigation Measures

Evaluating Alternatives System Continuity Community Impact Environmental Impact Operation and Maintenance Costs Construction Cost

Mitigation Alternative Evaluation Criteria: system continuity, community impact, environmental impact, operation and maintenance cost, construction cost Qualitative Evaluation – ‘negative’, ‘average’, ‘positive’ Scoring – Negative = -1 – Average = 0 – Positive = 1

Sacramento Bypass (1.2 miles) Deficiencies Corrective Measures Construction Cost Opinion Through- and Underseepage, Stability and Geometry Cutoff Wall, Slope Flattening $9.4 million

Deficiencies Corrective Measures Construction Cost Opinion Through- and Underseepage, Stability, Geometry, Freeboard Cutoff Wall, Slope Flattening, Levee Raise $77.7 million SACRAMENTO RIVER WEST NORTH (5.8 MILES)

Deficiencies Corrective Measures Construction Cost Opinion Freeboard, Geometry Floodwall$37.7 million PORT NORTH (4.9 MILES)

Deficiencies Corrective Measures Construction Cost Opinion Geometry, Stability, Through- and Underseepage Stability Berm, Cutoff Wall, Slope Flattening $51.5 million YOLO BYPASS (3.7 MILES)

Deficiencies Corrective Measures Construction Cost Opinion Through- and Underseepage, Erosion and Freeboard Cutoff Wall, Levee Raise, Rip Rap $144.8 million DEEP WATER SHIP CHANNEL WEST (18.9 MILES)

Deficiencies Corrective Measures Construction Cost Opinion Through- and Underseepage, Stability, Erosion and Geometry Cutoff Wall, Slope Flattening, Rip Rap $ 6.1 million DEEP WATER SHIP CHANNEL EAST (2.7 MILES)

Deficiencies Corrective Measures Construction Cost Opinion Underseepage, Freeboard and Geometry Cutoff Wall, Levee Raise, Slope Flattening, $9.1 million PORT SOUTH (3.6 MILES)

Deficiencies Corrective Measures Construction Cost Opinion Stability, Erosion, Underseepage, Freeboard and Geometry Cutoff Wall, Setback Levee, Levee Raise, Slope Flattening, $111.6 million SACRAMENTO RIVER WEST SOUTH ( 6.3 MILES)

Deficiencies Corrective Measures Construction Cost Opinion Stability, Erosion, Through- Underseepage, Freeboard and Geometry Cutoff Wall, Levee Raise, Slope Flattening, $11.7 million SOUTH CROSS (1.2 MILES)

WEST SACRAMENTO LEVEE SYSTEM IMPROVEMENT CONSTRUCTION COST OPINION REACH CONSTRUCTION COST OPINION (MILLIONS) Sacramento Bypass$9.4 Sacramento River West North$77.7 Port North$37.7 Yolo Bypass$51.5 Deep Water Ship Channel West$144.8 Deep Water Ship Channel East$6.1 Port South$9.1 Sacramento River West South$111.6 South Cross$11.7 TOTAL$459.6