Jefferson County PUD 1 Presented by: Gary Saleba, President EES Consulting, Inc. A registered professional engineering and management consulting firm with.

Slides:



Advertisements
Similar presentations
American Public Power Association Business and Financial Conference Time of Use PricingThe Fundamentals and Applications September 26, 2005 Portland, Oregon.
Advertisements

Time-of-Use and Critical Peak Pricing
City of Farmersville, Texas Water and Wastewater Rate Study February 2011.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
TVPPA Accounting & Finance Conference October 21, 2011 Cost of Service, Hydro Credit, Environmental Adder, and Fuel Cost Jim Sheffield 1.
2015 Session Update Budget impasse spawns special session (30 day) Solar incentive bill unable to move so far Republican carbon reduction bill not moving.
Electrical Billing and Rates MAE406 Energy Conservation in Industry Stephen Terry.
1 Managing Revenues in Regulated Industries Rate Design May 2008 Richard Soderman Director-Legislative Policy and Strategy.
Jefferson County PUD Preliminary Cost of Service and Rate Design Results December 9, 2014 Presented by: Gary Saleba, President EES Consulting, Inc. A registered.
ANALYZING YOUR ELECTRIC BILL Bob Walker Met-Ed November 7, 2007.
M ICHIGAN P UBLIC S ERVICE C OMMISSION Cost of Service Ratemaking Michigan Public Service Commission Department of Licensing and Regulatory Affairs.
RETAIL RATE REVISIONS August 1, 2015 Presented By:
TVA Generates Power and sends it down Transmission Lines to Newport Utilities Distribution Substations TVA Newport Utilities Substations Distributes the.
Pasadena Water and Power Electric Rates Workshop: Cost of Service Analysis and Rate Proposals.
LAKELAND ELECTRIC Pricing to Meet Net Meter Rules APPA 2009 Business & Finance Conference Sept 14, 2009 Jeff Sprague Manager Pricing & Rates.
1 Overview of Allocating Revenue Requirements Based on Shares of Marginal Costs May, 2012.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
Farmers Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Managing Retail Rate Changes Presented by Walter Haynes, Sr. Project Manager, Patterson & Dewar Engineers Central District Power Accountants Association.
Cost of Service Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Technical Conference on Net Metering Load Research Study November 5, 2014.
Elk Grove Water District Water Rate Update and Connection Fees Habib Isaac – Principal April 10, 2013.
California SONGS\OTC Plants Assumptions TEPPC – Data Work Group Call Tuesday, September 15, 2015.
Finance Committee Meeting Water Rate Study Update Habib Isaac – Principal Gregg Tobler – Task Manager August 13, 2012.
Long Beach Water Department Review of FY 12 Budget.
1 City of Port Angeles Strategic Planning Presentation June 7, 2011 Presented by: Gary Saleba, President EES Consulting, Inc. A registered professional.
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
Virginia Energy Purchasing Governmental Association (VEPGA) Primer On Rate Design Concepts & Practices And Explanation of VEPGA Rates & Schedules (What.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
APPA’s Financial Planning for Municipals Mark Beauchamp, CPA, CMA, MBA September 27, 2005 Business & Finance Workshop.
NSW Public Forum Essential Energy’s Regulatory Proposal 10 July 2014 Gary Humphreys, Chief Operating Officer.
Utah Office of Consumer Services EBA Rate Spread November 2nd, 2011.
NASUCA Annual Meeting Austin, Texas November 10, 2015 Scott J. Rubin, Attorney + Consultant 333 Oak Lane + Bloomsburg, PA Office: (570)
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
Commission Meeting November 18, 2015 WSSC Customer Use and Pricing.
FIRM TRANSPORTATION GAS SUPPLIER PRESENTATIONS GAS LOAD FORECAST.
Rate Policy Discussion Presentation to Review Panel November 1, 2013.
New Large Single Loads and Economic Development Considerations Draft Assessment.
Presented to the City of Dover, Delaware June 6, 2006 Revenue Requirements, Cost of Service and Rate Adjustments for the Electric Utility.
1 Before Ghana Public Utility Regulatory Commission Proposed Electricity Tariff Guidelines Workshop Ahmed Kaloko,Ph.D. Chief Economist Pennsylvania Public.
Program Overview Solar resource will be built by j uwi, (pronounced “you-vee”), a developer based out of Boulder, Colorado. Solar farm will be located.
Town of Lochbuie Water 2015 Water Rate Options Presented to the Town of Lochbuie Board of Trustees Raftelis Financial Consultants, Inc. December 16, 2014.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
1 City of Cocoa Michael Burton - President Andrew Burnham - Sr. Vice President Eric Grau - Project Consultant Presented by: Water, Sewer & Reclaimed Water.
FY 2016 Budget Discussion Prior to Proposed Budget Submittal July 23 rd,2015.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
May 31, 2016 WATER & SEWER RATE STUDY PRESENTATION 5/9/2016 City of Greenfield, California.
Smart Grid Tariff Changes
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
Current Water Rates $26.66 per month readiness to serve fee (billed on a quarterly basis at $80.00) 5.14 per 1,000 gallons of water used The City of Flushing.
Kaysville City, UT Electric Rate Study Results
City of Petersburg Water and Wastewater Rates
Water and Wastewater Rates
Narragansett Electric Rate Classes
Final Rate Study Findings
City of Sisters, OR 2017 Water & Sewer Rate Study
City of Petersburg Water and Sewer Rates April 26, 2011
May 2018 Proposed Electric Rate Increase - First Public Hearing
Water & Sewer Rate Study Presented by: Chris Gonzalez, Project Manager
City of Lebanon, Missouri Electric Department
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
2019 Water and Waste Water Rates
Island Energy Advisory Committee Board
Town of Wrentham DPW Water Department
Beartooth Electric Cooperative Rate Design Analysis
Presentation transcript:

Jefferson County PUD 1 Presented by: Gary Saleba, President EES Consulting, Inc. A registered professional engineering and management consulting firm with offices in Kirkland, WA and Portland, OR Commission Briefing on Cost of Service and Rate Design Issues September 10, 2014

Overview of this Presentation 2 Introductions and Session Objectives Overview of Rate Setting Process Revenue Requirements Assumptions Results Cost of Service Study Methodology Initial Results Rate Design Inherited from PSE Rates Should Follow Costs Recommended Changes

Overview of Rate Setting Process Step 1 - Aggregate Revenue Requirement (How much?) Step 2 - Perform Cost of Service Study (Who should pay?) Step 3 - Design Rates (How to collect?) Step 4 - Implement Rates 3

4 Based on 2015 Budget Load Forecast Based on BPA Forecast of Purchases Cash Basis Includes debt service and all capital improvements funded from rates Excludes City utility taxes from revenue and expenses Other revenues offset revenues to be collected from rates Used for Cost of Service/Rates Does not include funding from reserves, weather uncertainty, other factors that may impact the need for a rate change Issues Level and use of reserves Funding source for capital improvements Revenue Requirements Cost Category2015 Amount (million) Revenues at Present Rates$30.1 Purchased Power from BPA$14.8 Operating Expenses$7.1 Taxes$2.1 Debt Service$5.8 Capital Funded from Rates$3.9 Other Revenue-$0.6 Net Revenue Requirement for COSA$33.2

Revenue Requirements (cont’d) 5

Cost of Service Analysis Introduction 6 Based on 2015 Revenue Requirement Costs Distributed to Customer Classes based on Cost Causation Demand-related, Energy-related and Customer-related Requires Assumptions About Customer Usage for Each Class Revenues Calculated Based on Current Rate Components Expect Differences from PSE PSE has large service area with larger customers and different density Also underlying differences due to power supply source compared to PSE

Cost of Service Analysis Results 7 Residential/Farm Classes Residential paying about 90% of costs Not much difference in costs between residential and farm use Cost roughly 12.4 cents/kWh General Service Classes General service paying 120% to 160% of costs Costs roughly 7.5 cents/kWh – not much difference among current general service rate schedules Other Classes Irrigation and lighting hard to measure in a COSA Interruptible schools paying less than general service, but costs are higher PTP paying 99% of costs

Rate Design Issues Continue with PSE Rate Form or Go to PUD-Specific Design? Size of Customer Charge Blocking of Energy Charge Seasonality Number of Schedules Net Metering Street Lights Irrigation Rate Treatment Low Income/Elderly Rate Assistance 8

Rate Design Detail Schedule 7 – Residential Raise the customer charge to meet expected COSA results? Eliminate or reduce the differential between blocks so that it only reflects difference in BPA Tier 1 and 2 Reducing the Block 2 rate would require either an increase in Block 1 rate or customer charge Example: $16.77 plus 8.62 cents or $23.60 plus 7.98 cents Schedule 8 – Residential and Farm General Service No need for a separate rate? No reason to believe their costs are different than typical residential JeffersonClallam PUDPort Angeles Customer Charge$7.49$23.60$16.77 First 600 kWh cents/kWh6.90 cents/kWh6.74 cents/kWh Over 600 kWh cents/kWh $9.66 per month cents/kWh 9

Schedule 24 – General Service Raise the customer charge to meet expected COSA results? Rate differential should match BPA differential Example: $22.90 plus 8.8 cents or $26.13 plus 8.62 cents Schedule 25 – Medium General Service Rate has too many components Suggest eliminating the blocks – not consistent with cost causation Change demand charge to reflect all peak demand (not just over 50 kW) Make sure demand and energy components match COSA to get right price signals for load factor Not sure three GS rates are needed – combine with Rate 26 Rate Design Detail (cont’d) JeffersonClallam PUDPort Angeles Customer Charge$9.66$26.13$22.90 October – March cents/kWh6.90 cents/kWh6.77 cents/kWh Over 600 kWh cents/kWh JeffersonClallam PUDPort Angeles Customer Charge$51.77$54.29$45.74 Energy Rate April – September cents/kWh first 20, cents/kWh over 20,000 October – March cents/kWh first 20, cents/kWh first 20, cents/kWh4.55 cents/kWh Demand RateApril-September $6.01 per kW over 50 kW October-March $9.01 per kW over 50 kW $2.87$

Schedule 29 – Seasonal Irrigation & Drainage Pumping Service Rate has too many components Suggest eliminating the blocks – not consistent with cost causation Change demand charge to reflect all peak demand (not just over 50 kW) Make sure demand and energy components match COSA to get right price signals for load factor Rate Design Detail (cont’d) Schedule 29 – Seasonal Irrigation & Drainage Pumping Service $9.56 per month $4.35 per kW over 50 kW April-September $8.83 per kW over 50 kW October-March cents/kWh first 20,000 kWh April-September cents/kWh over 20,000 kWh April-September cents/kWh first 20,000 kWh October-March cents/kWh first 20,000 kWh October-March 11

Schedule 26 – Large General Service Combine with Rate 25 Schedule 31 – Primary General Service Combine with Rate 25/26 with primary meter discount? Rate Design Detail (cont’d) JeffersonClallam PUDPort Angeles Customer Charge$104.46$144.57$45.74 Energy Rate cents/kWh4.38 cents/kWh4.55 cents/kWh Demand RateApril-September $5.96 per kW over 50 kW October-March $8.94 per kW over 50 kW $4.47$3.89 JeffersonClallam PUDPort Angeles Customer Charge$339.51$144.57$ Energy Rate cents/kWh 4.38 cents/kWh Sept – May 4.57 cents/kWh June – August 2.79 cents/kWh Demand RateApril-September $5.76 per kW over 50 kW October-March $8.64 per kW over 50 kW $4.47 with unspecified contractual discount $

Schedule 43 – Interruptible Total Electric Schools Eliminate rate? No benefit for interruptible customers with BPA as provider Street Lights Rate for light Rate for pole What about specialty street lights? Rate Design Detail (cont’d) Schedule 43 – Interruptible Total Electric Schools $ per month $4.60 per kW Plus $3.89 per kW critical demand past 11 months cents/kWh all energy 13

Timing Change when new billing system is put in place Audit accounts and do customer bill analysis in mean time Work towards making sure customers are on the right rate and have the proper meter Rate Design Detail 14

Summary/Conclusion 15 Need to Finalize Budget and How to Pay for Capital/Reserve Fund Policy Basic COSA is Sufficient for Now Simplify Rates Along with New Billing System, Minor Adjustments Between Classes