Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.

Slides:



Advertisements
Similar presentations
1 Demand-Side Management Influence on Reliability NERC Demand-Side Management Task Force (DSMTF) Rick Voytas, Chair November 2007 Presented To The U.S.
Advertisements

Preliminary Resource Adequacy Assessment for the 2017 Pacific Northwest Power Supply NW Resource Adequacy Forum Technical Committee Meeting August 16 th.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Genesys Model Enhancements October 4, 2011 NW Resource Adequacy Steering Committee Meeting Gwendolyn S Shearer.
Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
Reliability Risks and Lessons Learned In The Wake Of The Polar Vortex OPSI Annual Meeting October 14, 2014.
Generation Adequacy Task Force Results of the 2012 Loss of Load Study January 18, 2013.
BOSTON DENVER LONDON LOS ANGELES MENLO PARK MONTREAL NEW YORK SAN FRANCISCO WASHINGTON Effective Load Carrying Capability of Wind Generation: Initial Results.
NERC LTRA Update / CDR Capacity Counting Issues
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Resource Adequacy Technical Committee Meeting April 6, 2011.
Developing an Adequacy Metric Resource Adequacy Forum Technical Subcommittee Meeting October 16, 2009.
Power System Research, Inc. Review of the PNW Adequacy Standard Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
Loss of Load Probability (LOLP) Project October 16, 2009 Resource Adequacy Technical Committee Meeting.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
Illustrative FCRPS Examples Comparing Capacity Adequacy Calculations for Federal Hydro- Dominated System Mary Johannis PNW Resource Adequacy Technical.
Comparison of LOLP Practices Mary Johannis PNW Resource Adequacy Technical Committee Mtg January 23, 2009.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
May 31, Resource Adequacy Capacity Standard Resource Adequacy Forum Technical Committee May 31, 2006 Background Image: Bennett, Christian Science.
June 27, Pacific Northwest Resource Adequacy Assessment for 2010 and 2012 Resource Adequacy Forum Steering Committee Meeting Northwest Power Pool.
Resource Adequacy Technical Committee Meeting April 6, 2011.
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Mary Johannis PNW Resource Adequacy Technical Committee Mtg November.
Resource Adequacy Steering Committee Meeting October 4, 2011.
Guidance for Utility Adequacy Assessments Steering Committee Meeting January 29, 2010.
Relationship of Regional Resource Adequacy Standards to Utility Planning PNW Resource Adequacy Steering Committee Meeting June 27, 2007.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
EFFECTIVE LOAD CARRYING CAPABILITY FOR WIND-POWER.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
Winter Power Supply Adequacy/Reliability Analysis Power Committee Briefing October 17, 2001.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
Wind Power Capacity Assessment Mary Johannis, BPA, representing Northwest Resource Adequacy Forum Northwest Wind Integration Forum Technical Working Group.
1 PNW Regional Contingency Resources Resource Adequacy Technical Committee April 6 th, 2011.
2010 Work Plan Steering Committee January 29, 2010.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Moving toward a Final Resource Adequacy Standard Resource Adequacy Forum Steering Committee Meeting September 27, 2007.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
Summary of Astrapé Reserve Margin Impact Analysis for the PUCT Pete Warnken WMS February 4, 2015.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Steering Committee Meeting April 13, 2007.
Work Plan Resource Adequacy Forum Technical Committee July 29, 2009.
Capacity Metric & Hydro Capacity Assessment Decisions Mary Johannis PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Developing Synthetic Temperature-Correlated Wind Generation Data Steering Committee Meeting January 29, 2010.
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
Defining LOLP Resource Adequacy Forum Technical Subcommittee Meeting November 14, 2008.
Steering Committee Meeting March 9, Why talk about assumptions? Garbage in, garbage out! “Let’s go dumpster diving!” Results sensitive to key.
Modeling the Hydroelectric System in GENESYS Resource Adequacy Forum Technical Committee Meeting July 25, 2007.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Variable Energy Resource Capacity Contributions Consistent With Reserve Margin and Reliability Noha Abdel-Karim, Eugene Preston,
Generation Adequacy Task Force Update to WMS
Steering Committee Webinar March 25, 2016
Vetting the GENESYS Model
Resource Adequacy Assessment for 2015 Interim Results Resource Adequacy Forum Technical Committee Meeting July 28, 2010.
GENESYS Current Functionality
Technical Committee Meeting January 27, 2012
2021 Adequacy Assessment Status Report
Capacity Analysis in the Sixth Plan
Technical Committee Meeting March 18, 2016
Progress on Resource Adequacy Assessment for 2017
Resource Adequacy Steering Committee Meeting October 4, 2011
Simulated vs. Real Hourly Dispatch Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Presentation transcript:

Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010

January 29, 2010Resource Adequacy Steering Committee 2 Outline Model Validation –Benchmarking Process –Sample Historical vs. Simulated Dispatch Methodology Review –Current Adequacy Metric: LOLP –The Problem with LOLP –LOLP Subcommittee Suggestions –Next Steps

January 29, 2010Resource Adequacy Steering Committee 3 Model Validation HYDSIM vs. actual monthly generation GENESYS vs. HYDSIM hydro generation output Hydro peaking calibration – Trapezoidal Model/HOSS/Capacity Survey Check random variable distributions –Water, wind, forced outage, load/temperature Simulated thermal dispatch vs. historical dispatch Simulated hydro dispatch vs. historical dispatch Simulated dispatch vs. scheduler’s perspective

January 29, 2010Resource Adequacy Steering Committee 4

January 29, 2010Resource Adequacy Steering Committee 5 Sample Comparison of Historical vs. Simulated Hydro Dispatch Hourly hydro dispatch is highly dependent on hourly load shape Historical and Genesys hydro load following is consistent Illustrative only – based on old data and F&W constraints

Methodology Review Current Adequacy Metric: LOLP

January 29, 2010Resource Adequacy Steering Committee 7 Cold Hydro Limited GENESYS SimulationIllustrative Example Only

January 29, 2010Resource Adequacy Steering Committee 8 Curtailment Events (Peaking problems and energy shortages) Each event has a peak and duration.

January 29, 2010Resource Adequacy Steering Committee 9 What do we Count? Ideally, we count “significant” events (those that we want to avoid) Energy threshold (or contingency resource) is 1,200 MW for one day or 28,800 MW- hours from Dec-Mar Capacity threshold (or contingency resource) is 3,000 MW in any hour from Dec-Mar and from Jun-Sep

January 29, 2010Resource Adequacy Steering Committee 10 Curtailment Events (non-events not shown)

January 29, 2010Resource Adequacy Steering Committee 11 Loss of Load Probability Simulated 300 winters (December through March) Out of 300 winters, 15 had an average curtailment greater than 10 MW-seasons, which means that the Winter Loss of Load Probability (LOLP) = 15/300 = 5 percent

January 29, 2010Resource Adequacy Steering Committee 12 Energy LOLP (Sum of Curtailed Energy Dec-Mar)

The Problem with LOLP

January 29, 2010Resource Adequacy Steering Committee 14 Potential Problem with LOLP Same LOLP – Bigger Magnitude

January 29, 2010Resource Adequacy Steering Committee 15 Potential Problem with LOLP Lower LOLP – Bigger Magnitude

LOLP Subcommittee Report and Recommendations

January 29, 2010Resource Adequacy Steering Committee 17 LOLP Subcommittee Report Clearly define all reserve requirements –Operating reserves –Planning reserves –Wind integration reserves Determine which reserve curtailments count toward LOLP Add temperature-correlated wind as a random variable Decouple temperature and water condition Define a “contingency” resource for each month of the year instead of defining threshold events Record curtailment events across all months of the year Consider using other adequacy metrics Continue to assess climate change impacts

January 29, 2010Resource Adequacy Steering Committee 18 LOLP Review Status Reserves –Work being done by PNUCC committee Temperature-correlated wind –BPA working on a test data set Decouple temp and water –Done Contingency resource –Work needs to be assigned Annual metric –Not yet started Other metrics –BPA draft methodology –PSRI review Climate change –Ongoing

Next Steps

January 29, 2010Resource Adequacy Steering Committee 20 Possible Modifications to the Current Method Replace LOLP with an alternative metric Use LOLP in conjunction with an alternative adequacy metric Use LOLP in conjunction with the magnitude of the most severe event (or an average of the worst 10% of events)

January 29, 2010Resource Adequacy Steering Committee 21 Examples of Other Adequacy Metrics LOLE: loss of load expectation (%) –Number of hours with curtailment divided by the total number of hours simulated –Can be more intuitive, i.e. 99.5% reliable –Does not address magnitude EUE: expected unserved energy (MW-hr) –Average amount of unserved energy per year –Lacks specific information about severe events

January 29, 2010Resource Adequacy Steering Committee 22 Work Plan PSRI review complete by early 2010 Benchmark GENESYS by early 2010 Tech Committee propose new metric and threshold by April of 2010 Use new metric to assess 3 and 5 year adequacy by June 2010