Work Breakdown Structures. Purpose The WBS shows different levels within the product hierarchy. For Government program managers levels 1-3 are of prime.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Work Breakdown Structures
Chapter 3 Managing the Information Systems Project
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
© 2008 by Prentice Hall 3-1 ITCS311 Systems Analysis and Design Dr. Taher Homeed Feb 2010 Department of Computer Science College of IT University of Bahrain.
Systems Analysis and Design 9th Edition
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
INFO 638Lecture #81 Software Project Management Cycle plan and build INFO 638 Glenn Booker.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems Work Breakdown Structures (WBS) Current: 14 January 2015.
Modern Systems Analysis and Design Third Edition
Chapter 3 Managing the Information Systems Project
ELC 347 DAY 7. Agenda Questions Assignment 3 Due Assignment #4 posted  Due next week Group Progress report due next week Exam 2 next week  Same format.
Systems Analysis & Design Sixth Edition Systems Analysis & Design Sixth Edition Toolkit Part 4.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Project Time Management
1 SOFTWARE PRODUCTION. 2 DEVELOPMENT Product Creation Means: Methods & Heuristics Measure of Success: Quality f(Fitness of Use) MANAGEMENT Efficient &
Computer Engineering 203 R Smith Project Scheduling 12/ Scheduling Now we know how much work there is to do, when can it be done? What kind of schedule.
LSU 10/09/2007Project Schedule1 The Project Schedule Project Management Unit #4.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
Project Management and Scheduling
The program work breakdown structure (WBS) establishes the essential
Work Breakdown Structure
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Toolkit 4.
Chapter 3 : Managing the Information Systems Project.
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Edward B. Farkas, Managing Director, Project Management Practice
1 Lecture 3.1: Project Planning: Work Breakdown Structure (WBS) [SEF Ch 9] Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Appendix A Project Management: Process, Techniques, and Tools.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 10 Project Cost Management.
Project Management: A Managerial Approach
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Work Breakdown Structure Use and Demo
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Office Management Tool - II Institute of Management Sciences Muhammad Shahzad Ali Lec 7: Introduction to MS - PROJECT L E C T U R E 7 INTRODUCTION TO MS.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Chapter 3 Managing the Information Systems Project
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Project Time Management
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Microsoft Project 2010 ® Tutorial 1: Planning a Project.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
1 11/2004 – N.Campanis for MPUG Western NY Chapter Working Session Nick Campanis Presented to MPUG – Western NY Chapter Working Session November 10, 2004.
WEEK 3 Project Planning.
Lecture 3 Part 1 Managing the Information Systems Project.
Survey Training Pack Session 17 – Budgeting and timelines for survey design and implementation.
Creating a Work Breakdown Structure with Microsoft Project.
Using MS-Project INFS MS-Project: 3 Major Parts 1. Project Planning 2. Project Execution & Tracking 3. Project Reporting.
Breakdown Work Structure Applying Management Tools to a Project.
Chapter 3 Managing the Information Systems Project
Project Management MGT 30725
Work Breakdown Structure
Work Breakdown Structures (WBS)
Defining the Activities
Project Management Process Groups
Modern Systems Analysis and Design Third Edition
Modern Systems Analysis and Design Third Edition
Presentation transcript:

Work Breakdown Structures

Purpose The WBS shows different levels within the product hierarchy. For Government program managers levels 1-3 are of prime importance Level One – Overall System Level Two – Major Element (Segment) Level Three – Subordinate Components (Prime Items)

Levels Level One – Overall System Level 1 is the entire defense materiel item; for example, an electronic system. An "electronic system“ might be a command and control system, a radar system, a communications system, an information system, a sensor system, a navigation or guidance system, or an electronic warfare system. Level 1 is usually directly identified as a program or a sub-element of a program.

Levels Level Two – Major Element (Segment) Level 2 elements are the major elements of the defense materiel item; for example, a fire control system or an automatic flight control system. These prime mission products include all hardware and software elements, aggregations of system level services (like system test and evaluation, or systems engineering and program management), and data.

Levels Level Three – Subordinate Components (Prime Items) Level 3 elements are elements subordinate to level 2 major elements. For example, a radar data processor, a signal processor, an antenna, a type of service (like development test and evaluation, contractor technical support, or training services), or a type of data (like technical publications) would be typical level 3 elements for an electronic system. Lower levels follow the same process.

Aircraft System Air Frame Engine Navigation L E V E L O N E L E V E L T W O L E V E L T H R E E Training Support Equipment Air Vehicle

Benefits Separates a defense materiel item into its component parts, making the relationships of the parts clear and the relationship of the tasks to be completed -- to each other and to the end product -- clear. Significantly affects planning and the assignment of management and technical responsibilities. Assists in tracking the status of engineering efforts, resource allocations, cost estimates, expenditures, and cost and technical performance. Helps ensure that contractors are not unnecessarily constrained in meeting item requirements.

Challenges The primary challenge is to develop a Work Breakdown Structure which defines the logical relationship between all the elements of the program and its natural extension with the contract. If the government considers elements of the program to be high cost or high risk, the system may be defined to a lower level of the WBS. This is reasonable as long as the product-oriented logical extension is maintained. A second challenge is to balance the program definition aspects of the WBS with its data-generating aspects. However, the primary purpose of the Work Breakdown Structure is to define the program's structure, and the need for data should not distort or hinder the program definition.

WBS Glossary Lists and defines WBS elements –Initially based on generic definitions –Refined as more information is acquired Definition –Resources –Reference to designs, drawings, technical documents –Point of Contact –Any other relevant information

Pitfalls Do not include non-essential elements Try to stick to products Do not use org chart as WBS Use accurate (not generic) names Include software if appropriate

WBS Summary The WBS serves as the coordinating document for the program. The WBS guides –Resource allocation –Resource expenditure –Work progress Keeps program status constantly visible in order to monitor changes

Gantt Charts An Intro

Gantt Chart Display in a single “picture,” the flow of tasks, predecessors and successors that describe the execution of the project. A visual representation of the sequencing and duration of activities on a given project

Gantt Chart Predecessor– a task that must be completed immediately before another Successor– a task that must wait for this task to be completed

Gantt Chart Advantages Easy to read Good overview Clear indication of status Able to track progress What-if analysis Can show many details –Budget –resources

Gantt Chart Time across top Activity represented by a bar –Filled/non-filled –Triangles up and down Lines for predecessors (some) Resource requirements

Time Estimates Historical Data Same project Historical Data Similar project Expert Opinion Known delays Unknown delays (margin) Resource availability Management support Simulation

Gantt Chart Tasks Identify tasks Identify dependencies Identify resources needed Estimate durations –Units of measure –Available margin Determine task 1 Draft chart Refine

Draft Chart Initial Task Entry-- no predecessor Lower tasks-- no predecessor Identify predecessor tasks that depend on shortest “np” tasks Repeat Draw dependency lines (only latest) Enter resource requirements

Gantt Chart Disadvantages Can get very large Tedious to update Precedence sometimes difficult to display Resources kind of added later Priorities not shown

Gantt Charts and Computers Lots of software –Microsoft Project Easier to create and update –Must check carefully Hard to show on one screen –Must scroll Precedence must be checked carefully