Marketing Presentation Page 1 Pareto Securities’ 15th annual Oil & Offshore Conference September 10, 2009.

Slides:



Advertisements
Similar presentations
Energy Conservation Energy Management.
Advertisements

Addition to Current Radiation Facility Program Some features are under development and will be subject to review by competent authorities (FDA, Notified.
The first floating wind turbines Martin Jakubowski Technology Architect Blue H Technologies BV, The Netherlands Brindisi, Italia 23rd of May
1 Gunnar Münt The Risk Sharing Finance Facility New EIB financing opportunities 14 th December 2006, Brussels.
Addax … The Act … The Bill … & The Plan PETAN Panel Discussion Offshore Technology Conference Houston, Texas May 4, 2010.
Center for Strategic and International Studies – CCS event 31 st March 2008 Rachel Crisp Deputy Director, Cleaner Fossil Fuels Unit, Energy Group.
Maersk Contractors Petrobras Visit June Maersk Contractors Drilling Floating Production H 2 S Detection and Protection Liquefied Natural Gas (LNG)
Quarterly revision of the macroeconomic projections Quarterly revision of the macroeconomic projections Dimitar Bogov Governor January, 2013.
Grid Connections: Now and the Future Patrick Smart Head of Commercial and Regulatory 10 th November 2010.
Helix Energy Solutions Group, Inc. (HLX) NYSE Recommendation: BUY Price (10/3/14): $21.55.
Aker Exploration: Rig for oil Status and Outlook Bård Johansen, President & CEO.
© ABB-EWEC 2006 ATHENS /03/06 EWEC 2006 Athens The Challenges of Offshore Power System Construction Peter Jones Lars Stendius ABB.
Mosvold Jackup Ltd. Cost efficient jackup’s tailor-made to meet Middle Eastern demand Pareto Offshore Seminar September 2006.
Financial Overview October 22, Economic Update 2.Financing Strategies  Multi Sport Facility  EMS Headquarters  Brookdale Watermain  RINC Projects.
Projects is one of the sectors of the engineering department that is paid a great attention because it supports all other departments to achieve its requirements.
Wind & Storage Project Duqm| 19/05/2015| Page 1 RAPϞ/P/2A003/BRE/15/035 – Rev0 Wind to power the city of Duqm: the need and opportunities for storage for.
Loan Application Process Step-by-step process of establishing a loan ©2014 Comprehensive Finance, LLC.
ENTR 452 (Business Plan Slides, Chapter 7)
Ability Drilling ASA Pareto Conference 28 August 2007.
Lesson 8 Offshore Drilling
SURETY BONDS 101 The Basics of Bonding. Surety Bonds 4 A surety bond is an instrument under which one party guarantees to another that a third will perform.
Obtaining Surety Credit An Introduction to the Surety Process for Contractors and Subcontractors.
Top management jobs BP-Centro Finland Erno Karpoff
© Copyright High Performance Concepts, Inc. 12 Criteria for Software Vendor Selection July 14, 2014 prepared by: Brian Savoie Vice President HIGH.
“Uralmash Oil and Gas Equipment Holding” LLC
Deepwater drilling challenges Gm, Drilling – murphy malaysia
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
N-Class Harsh Environment Jack-up Drilling/Production
Surety Basics 2013 Construction Opportunities Conference
Songa Offshore ASA Presentation June 2006 Songa Offshore ASA Presentation June 2006.
The Four Key Financial Statements: The Income Statement
Offshore Natural Resource Extraction. Overview History History Exploration Exploration  Seismic surveys  Drill ships Platform models Platform models.
05 March 2009 PAGE 1 A.P. Møller - Mærsk A/S Annual Report March 2009 Conference call 1.30 pm CET Webcast available at PAGE 1.
Africa Rail 2009 Workshop 23 June 2009 Different Types of Financing for Mobile Equipment Greg McKenzie Head of Asset Finance, Investment Banking Division,
NPDO Non Profit Distributing Organisation Mikko Ramstedt, Project Adviser Financial Partnerships Unit.
Independent Oil Tools ASA Presentation to the general meeting May 24, 2005.
Diamond Offshore Drilling Inc. Han Yang Xuhao Yang Ryo Seob Kim Jionghan Dai Tyler Haida October 27, 2011 Analysts:
Oslo Rig Event 24 September 2009
Chapter 10 Swaps FIXED-INCOME SECURITIES. Outline Terminology Convention Quotation Uses of Swaps Pricing of Swaps Non Plain Vanilla Swaps.
Vp plc Preliminary Results Year Ended 31 March 2005.
Norwegian savings banks and Equity Certificates (EC) New legislation as of 1 July 2009 improves the position of the savings banks.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
COSL Reverse Roadshow “COSL941” COSL Reverse Roadshow “COSL941” 30 May 2006 CHINA OILFIELD SERVICES LIMITED.
Energy for the Future Belene Nuclear Power Plant Project Status.
LONG TERM FINANCE: SHARES, DEBENTURES AND TERM LOANS CHAPTER 20.
Collaboration | commercialisation | diversification | internationalisation Subsea UK Planned Events Shaping the Events for 06 and 07 Patrick O’Brien Director.
Wind Denmark Energy Annual Event 2015 Financing of companies within the wind industry from a bank perspective Torben André Petersen, Head of Branch Region.
CBP3 Sustainable Financing Solutions December 7, 2015.
Town of Genoa October 6, Agenda Why are we here? Background Capacity Analysis & Facilities Plan Preferred Alternative Board Direction Implementation.
Bengt Lie Hansen Senior Vice President, Hydro Oil & Energy The Giant Ormen Lange Field Development Hydro’s model for arctic offshore projects World Gas.
SBA Lending Division SBA Lending Division October 2015.
2011/12 Operating Framework Vanessa Harris 21 st December 2010.
Investor Presentation Oslo / London February
Using Export Credit Agencies in renewable energy projects Lars Kvamme Relationship Manager Latin American Desk DnB NOR Bank ASA Santiago, November 11,
DISCLOSURE APPENDIX AT THE BACK OF THIS REPORT CONTAINS IMPORTANT DISCLOSURES, ANALYST CERTIFICATIONS, AND THE STATUS OF NON-US ANALYSTS. US Disclosure:
Oil and Gas Training Lusaka April 2016.
html Global Ultra-Deep Water Market MicroMarket Monitor Forecasts.
Offshore Research AS 1 Offshore Markets Offshore Research AS 2 Business concept Data from several reliable sources are processed, interpreted.
Presentation Pareto seminar. Status Petrolia Drilling.
Pareto Oil & Offshore Conference 29. September 2007.
Fred. Olsen Energy ASA 3Q 2005 presentation 26 October 2005.
Bluewater Insurance ASA - a substantial and competent provider of risk protection 3 rd quarter of 2005.
Global Jackup Rig Market Report: 2016 Edition Phone No.: +1 (214) id:
Petrolia Drilling ASA 4th quarter Key events  SS Petrolia - Good performance through 4th. quarter and into 1st. Quarter 2007.Contract coverage.
PETROLIA DRILLING 1ST QUARTER PETROLIA – COMPANY STRUCTURE Petrolia Drilling ASA Venture Drilling AS PetroMena ASA PetroJack ASA PetroProd Ltd Petrolia.
World Offshore Maintenance, Modifications & Operations Market Forecast World Offshore Maintenance, Modifications & Operations Market Forecast.
Candidate Background Key ResponsibilitiesKey Behaviours Communication Managing Relationships Analysis & Problem Solving Collaboration Includes the right.
1MEDSERV Operations Ltd Medserv p.l.c. 15 April 2010.
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Stage VI & VII: Construction and Completion & Formal Opening
Presentation transcript:

Marketing Presentation Page 1 Pareto Securities’ 15th annual Oil & Offshore Conference September 10, 2009

Marketing Presentation Page 2 KFELS N-Class harsh environment jack-up drilling/production rigs

Marketing Presentation Page 3 Company Introduction Rig Concept and Design Market/Financials Summary 1 2 TABLE OF CONTENTS / AGENDA 3 4

Marketing Presentation Page 4  SKDP established September 2006 and located in Kristiansand, Norway  49% Owned by Skeie Technology AS, 5% by Keppel O & M and 46% by external investors  Commercial and technical services hired from Skeie Technology  Operational Management: Skeie Rig Management with support from Pier Offshore Management Services  Signed contract for design and construction of three KFELS Class N Jack-up Unit with delivery Q1-2010, Q and Q  OTC listed in Oslo COMPANY INTRODUCTION – Skeie Drilling & Production ASA (SKDP)

Marketing Presentation Page 5 COMPANY SET-UP Skeie Technology AS Skeie D&P ProdJack 1ProdJack 2ProdJack 3 Skeie Rig Management AS (ex Offshore Production Services AS) Norsupply AS Pier Offshore Management Services AS OSM Consultants AS Business Management Agreement Head Management Agreement Sub Management Agreement Supervision Agreement Sub Supervision Agreement

Marketing Presentation Page 6 CONSTRUCTION PROGRESS

Marketing Presentation Page 7 OPERATIONS PREPARATIONS Skeie Rig Management (wholly owned SKDP subsidiary) to operate the rigs with support from Pier Offshore. Key onshore and offshore management positions and section leaders already recruited Training and competency development programs under development QHSE management systems established Maintenance systems Logisitcs (spare parts)

Marketing Presentation Page 8 Company Introduction Rig Concept and Design Market/Financials Summary TABLE OF CONTENTS / AGENDA

Marketing Presentation Page 9 New N-Class Standard Jack-up – ”no” clearance between the legs w/jacking system and cantilever RIG CONCEPT AND DESIGN RIG CONCEPT AND DESIGN COMBINED DRILLING AND PRODUCTION OPERATIONS

Marketing Presentation Page 10  Drill Floor located on the substructure above the cantilever.  Cantilever capable of being skidded fore and aft with center line (primary Cantilever position) of rotary up to 75 ft (22.86m) aft of stern It can be relocated 26 (7,92m) ft to port (secondary Cantilever position)  The Drill Floor can be skidded 20 ft (6.1m) port and starboard of the Cantilever centerline both in primary position and in secondary position  Max operation envelop over a pre-installed Jacket/Wellhead Platform: 75 ft aft of Transom, 20 ft to starboard of hull centerline and 46 ft to port of hull centerline. RIG CONCEPT AND DESIGN RIG CONCEPT AND DESIGN SPECIFICATIONS FOR DRILLING OPERATIONS

Marketing Presentation Page 11 RIG CONCEPT AND DESIGN RIG CONCEPT AND DESIGN COMBINED DRILLING AND PRODUCTION OPERATIONS The Cantilever and Drill Floor can be repositioned 26ft (7.92M) to the Port side of the Vessel, to allow space for installation of a future production process module. Limits Area:12,918 sq ft (1,200M2) Height:52.5ft (16M)

Marketing Presentation Page 12 RIG CONCEPT AND DESIGN RIG CONCEPT AND DESIGN PRODUCTION CONCEPTS WITH STANDARD UNITS/EQUIPMENT

Marketing Presentation Page 13 RIG CONCEPT AND DESIGN RIG CONCEPT AND DESIGN ALTERNATIVE PRODUCTION

Marketing Presentation Page 14 Source: Company, ODS Petrodata TECHNICAL COMPARISON WITH PEERS AS DRILLING RIGS MSC CJ70-X150A 1) DNV , /336/ , ,793 15,723 4, tons/2x1150 HP 3 14,484 5, RIG DESIGNKeppel N-ClassMSC CJ70-X150AMSC CJ62-S120 Class DNV Operating water depth (ft) 400 (430) Drilling depts (ft) 35,00030,000 Hull size (ft) (LxBxD) 264/289/35291/336/38256/296/35 Leg length (ft) Cantilever outreach (ft) BOP (psi rating) 15,000 Mud Pumps 3 (space for 4)43 Liquid mud capacity (bbls) 6,6006,7935,400 Bulk mud capacity (bbls) 15,89215,72314,027 Drawworks (hp) 4,600 3,000 Top Drive tons/2x1150 HP750 tons/1150 HP750 tons/2x1150 HP Cranes 333 Main Power(hp) 13,05014,4846,880 Variable Deck Load (st) 4,5354,6003,693 Accomodation ) Enhanced version of the existing CJ-70 design with increased drilling depth, increased variable deck load and 1000 t top drive.

Marketing Presentation Page 15 Company Introduction Rig Concept and Design Market/Financials Summary 1 2 TABLE OF CONTENTS / AGENDA 3 4

Marketing Presentation Page 16 Skeie Drilling & Production (SKDP) Turnkey contract with the world’s leading jackup builder  Turnkey contracts signed with Keppel FELS for construction of 3 ultra harsh environment jackup rigs  Deliveries in March, August and December 2010  All in average delivered cost of ~USDm 477 per unit (total USDm 1.430)  All 3 units are fully financed with 11 % equity and 89% in debt (incl. convertible bonds)  Low construction risk at Keppel Fels - the world’s leading jackup builder  Favorable payment schedule: 50% at delivery for the first 2 units, 35% for the third unit

Marketing Presentation Page 17 Financial Highlights All rigs fully financed - Equity - Convertible bonds - Secured bonds (2. priority) - Senior secured loan facility (1. priority) Bond loans may be replaced once the rigs are secured contracts New rig of equal design up approx. 120 MUSD per rig (3x120=360 MUSD) Delivery time new rig equal design end 2011, beginning 2012

Marketing Presentation Page 18 Skeie Drilling & Production (SKDP) c ombined drilling/production units  The jackups are purposed built for the NCS and other harsh environment areas  Superior deck-load capacity  Deeper water capabilities  Significantly larger air-gap than a standard jackup (up to 62 meters)  Big drilling envelope – up to 64 wells without moving the rig  Dual mode value enhancing for oil companies.  Provides early cash flow from smaller fields  Increases oil recovery rates  A combined mode contract could bode for even longer contracts. Oil companies likely to pay for upgrade and downtime related to this  Two existing jack ups and one under construction of the CJ70 design with similar capabilities for drilling & production  Maersk Innovator and Maersk Inspirer  PetroProd has one under construction  The construction cost for the SKDP rigs is significantly lower than a new CJ70, > 100 MUSD  Operators prefer jackups for semis  Jackups give less risk for downtime caused by harsh weather  Blow Out Preventer (BOP) on deck compared to BOP on seabed for floaters, thus reduced operational risks  The North Sea part of the NCS is to a large extent shallow water

Marketing Presentation Page 19 Strong markets with several near term contract opportunities – Limited no. of rigs approved for NCS  Currently 6 jackups operating on the NCS.  Hereof 5 units operating as drilling rigs  Hereof 2 units matching the capabilities to the SKDP rigs: Maersk Inspirer, rebuilt for drilling & production and Maersk Innovator operating as drilling rig, but can be rebuilt for drilling & production  Extremely difficult for existing rigs to be approved for NCS  There is one CJ70 unit to be constructed for PetroProd suited for drilling & production

Marketing Presentation Page 20 Contract Status Jackups, Norway Rowan Gorilla VI: AOC declined. Rowan has re-submitted AOC application in April/May Mobilization from UK to be delayed BG: - Planned mobilization to Norway around Q1 2009, depending on well in progress in UK

Marketing Presentation Page 21

Marketing Presentation Page 22 Source: Pareto JU demand Norway: ConocoPhillips took Innovator and Gallant this week ….needs another rig for min 5Y according to the demand below Source: Pareto Research

Marketing Presentation Page 23 Oil production

Marketing Presentation Page 24

Marketing Presentation Page 25 Summary Contract signed with Skeie Energy for rig # 2 for minimum 3 years SKDP prequalified by major oil companies Several bids submitted for NCS operators. Together with a number of new prospects for SKDP maintains its optimism that alle three rigs will be on contract within the end of Extremely difficult and costly to enter NCS for existing rigs Identical newbuild N-Class rigs have a price increase of more than USDm 120 with delivery 4th quarter 2011 Full financing of all three rigs in place, 1st priority bank loans completed Equity issue ≈ 28 MUSD medio September 2008 (bond loan agreement) 100% underwrited by Skeie Technology and Keppel O & M

Marketing Presentation Page 26 Contact details: Skeie Drilling & Production ASA Tordenskjoldsgate Kristiansand Norway Telephone: Fax: