Design Project Management Final Presentation Zachary Kirsch 15 November 2012.

Slides:



Advertisements
Similar presentations
1 Types of Bikes Allowed on TheBus Tandem, stretched out, or custom bikes and bikes with oversized wheels, three or more wheels, trailers, or those powered.
Advertisements

Retractable Tractor Trailer Boat Tail Tim Slattery 11/15/12.
Feasibility Study of Replacing an Industrial Hydraulic Lift System with an Electro-Mechanical Lift System Critical Design Review Thursday, 21 September.
Top of Car Load Assisting Bike Lift.  Summary & Objectives  Mission Statement  Key Product Design Specifications  Top Level Design Options  Final.
Filament Winding Machine. Project Name – Filament Winding Machine Project Number – P09226 Project Family – Competitive FSAE Autosports Systems Project.
College of Engineering ECE Curriculum Enhancements: Senior Design Experiences Professor David G. Meyer School of Electrical and Computer Engineering.
P11310: Parabolic Dish Autopoint Solution Project Family Team Leader: Trae Rogers (ME) Project Engineer: Pat Ryan (EE) Kyle Norlin (ME) Chris Reed (CE)
The Team Industrial Engineers Andrew Chorney (Project Manager) Tim Bukowski Jason Hess Mechanical Engineers Michael Goldberg (Lead Engineer) Martin Martinez.
MSD-I Project Review Modular Motion Tracking Sensors 1.
04013 Micro Turbine Senior Design Micro Turbine Senior Design PDR – May 20 th, 2004 Project
Nandini Vemuri (EE) Jason Jack (CE) Ryan Schmitt (CE) Jeff Howe (EE) John Corleto (CE) Emily Phillips (EE) Power Distribution Subsystem Wireless Communication.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
R I T Advisors: Dr. Wayne WalterMechanical Engineering Dept. Faculty Jeffrey WebbTeacher’s Assistant Team Members: Aman Verma EE - Electrical Craftsman.
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
MSD-II Project Review Modular Motion Tracking Sensors 1.
Airbag Automaton John Bailey Hattie Hiatt Chun Hau Low Jason Harwood Wayne Gallup Jason Canaday.
Capstone Design Course for NASA ESMD
 Rob Fish (Industrial Designer)  Zachary Kirsch (Mechanical Engineer, PM)  Martin Savage (Mechanical Engineer)  Olivia Scheibel (Mechanical Engineer)
Introduction To Engineering Bike Lab #1 - 1 Agenda Overview of the Bicycle Labs.
Sponsor/Customer: Dr. Ferat Sahin Multi Agent Bio-Robotics Lab Faculty Guide: Prof. George Slack Team Members: Matthew LeStrange – Electrical Engineering.
Prepared and Presented by Morgan DeLuca.  Rochester is pushing to become a more bike friendly city  There are issues arising with ‘last-mile’ transit.
Team Wrecked Week 9 Deliverables: Engineering Analysis.
Team 14: The Design and Construction of an Ackerman-Steered Robot Members: Kyle Quinn Julio Sosa Robert Steel.
Multidisciplinary Engineering Senior Design Hardinge Universal Turret Project Critical Design Review May 13, 2005 Project Sponsor: Hardinge.
1 Renewable Energy Designs Proposal Presentation December 1, 2003 Renewable Commuter Car
Brisbane City Council Trial of Bike Racks on Buses Nov 2003.
Transport.tamu.edu The mode of transportation I use to get to campus the majority of the time is: Drive alone3826 (49 %) Carpool526 (7 %) Ride Transit2277.
+ Enhancing Business Access by Bicycle A Bike Corral on 42 nd St & University Way November 8 th, 2011.
Save on Health Insurance Costs Bike industry leader Quality Bicycle Products saw 4.4% reduction in company healthcare costs over the last three years.
Unit 91 Week 7 Jon Gutierrez, Chris Sauer, Simon Radomski, Chat Huynh, Jeff Burton, & Robert Platt October 1, 2008 Final Presentation.
Empowered Storefront Presented by Chris Jaehnen. Overview Statement of the Problem Product Description User Profiles Summary of Deliverables Proof of.
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
Magnetically Levitated Propeller Bernie Garcia (ME, Team Leader), Joe Bernardini (ME, Scribe), Elijah Sensenig (EE, System Integrator), Zachary Louison.
Systems Level Demo P15010: Arc Wheelchair Swing. Maggie Bates BS/ME Industrial & Systems Engineering Owen Breese BS Mechanical Engineering Elizabeth Cutolo.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Team 14: The Design and Construction of an Ackerman-Steered Robot Members: Kyle Quinn Julio Sosa Robert Steel.
Design of a Nulling Yaw Probe for a Gas Turbine Engine Test Rig
ME 4182 Problem Statement, Design Partition, Project Plan, Task Assignments Team: GT Rack 2:00 pm September 7, 2005 Ryan Glenn Andrew Mrasek Japheth Nelson.
John Deere Team Weekly Status Report Week 3 Josh Ebeling Jamari Haynes James June Mike Reno Ben Spivey Gary Twedt.
1 - An AISI 1020 cold- rolled steel tube has an OD of 3.0 inch. The internal pressure in the tube is 6,840 psi. Determine the thickness of the tube using.
Stand Alone Group Members: Jaime Alvarez Austin Chamberlain Trey Smith Jung Hoon Kim.
SENSOR SELECTION CALIBRATION OVERVIEWOVERVIEW DESIGN ROADMAP ACKNOWLEDGEMENTSACKNOWLEDGEMENTS The project would not have been possible without the extensive.
Stationary Balance Training Bicycle - P08001 Team Members: Jennifer Zelasko - IE Carl Mangelsdorf - ME Jeff Tempest - ME James Nardo – ME Jonathan Bawas.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
INTRODUCTION About 13 people die every hour due to automobile accidents in India. About 36% of these accidents are due to negligence in lifting the side.
Joseph Ferrara Team Lead (ME) Joseph ChurchDesign Engineer (ME) Joshua Van Hook LabView Engineer (EE) Jamie Jackson Electronics (EE) Joelle Kirsch Project.
End of Line “Pass Through” Conveyor
Automatic Shifting Bicycle
The ambition To inspire one million more women to ride, race, coach, lead, instruct and be part of British Cycling by Our ambition is to improve.
Concept Level Project Plan P08008 – ArcWorks Process Improvement
Kart² Progress Presentation
FINAL REVIEW UAV AIRFRAME B
AUTOMATIC SHIFT CONTROLS FOR ATV SPONSOR: POLARIS INDUSTRIES
CycloPower Faculty Advisor Team Members Faryar Etesami
The “Yarn Bully” Transport Cart
LP fuel lines redesign on ISX15 engines Date- 6th Sep 2017
Bicycle Parking Systems
Kyle van Veen, Jake VandeKieft, Steven Tarske, and Trevor Nyeholt
Project Readiness Review P10029 – Air Muscle Artificial Limb
Stationary Balance Training Bicycle - P08001
P08024 AIR MUSCLE ARTIFICIAL LIMB
P09045: Membrane Characteristic Test Stand
Drive alone 3826 (49 %) Carpool 526 (7 %) Ride Transit 2277 (29 %)
P08427 LED Lighting Technologies for a Sustainable Lighting Solution in Developing Nations 5 December 2008 MSD I – Week 1.
FINAL PRESENTATION Kennesaw State University
Vibration Isolation System
P09043: Fluid Smart Lap-Band
LP fuel lines redesign on ISX12 engines Date- 6th Sep 2017
Presentation transcript:

Design Project Management Final Presentation Zachary Kirsch 15 November 2012

Project Motivation Industrial design student James Paulius Incorporating cycling and public transportation Need: To have additional accommodations for cyclists to store their bicycles while riding on public transportation buses

Project Description Design and implement a bicycle rack that can be mounted to the currently unused space on the rear of a commuter bus This rack can supplement the current rack mounted on the front of a bus This rack can be retrofitted onto currently running buses

Project Goals and Scope Proof of concept Rack deliverable (1) Arm unit Associated controls Mirror vision system Additional deliverable Mounting stand Testing All deliverables will be tested to demonstrate their proper functioning

Budget The budget request for completing this project will be $600

Desired Staffing Electrical Engineer (2) Communication Control panel Feedback systems Motor and power source sizing and selection Mechanical Engineer (2) Rack Mounting system Fatigue and stress analysis Material selection

Additional Support Faculty champion None Contacted Dr. W. Walter (ME) and Dr. F. Sahin (EE) Customer None Was informed that Mr. J. Schull would act as our customer He is unwilling to do so, but is willing to help establish a contact at RGRTA for this position

Feasibility Analysis Motor sizing Motor must be powerful enough to lift the arm with bicycle attached Suitable motor McMaster P/N 6470k72 1/17 hp. DC gearmotor Arm stress The stresses seen by the arm cannot exceed the arm material’s yield strength Suitable material McMaster P/N 8457k27 0.5” OD stainless steel tube

Summary Commuter Bus Vertical Rear Bike Rack MSD 1: MSD 2: Zachary Kirsch