LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Systems Issues: Optical Design & Fabrication GSMT Working Group on Optical Design & Fabrication.

Slides:



Advertisements
Similar presentations
TMT.OPT.PRE DRF011 Thirty Meter Telescope Secondary and Tertiary Mirror Systems International Symposium on Photoelectronic Detection and Imaging.
Advertisements

M1 Assembly Ron Price August 25, M1 Assembly Functional Requirements 4 meter diameter clear aperture M1 surface figure quality 32 nm rms Operating.
RASC, Victoria, 1/08/06 The Future of Adaptive Optics Instrumentation David Andersen HIA.
Adaptive Optics1 John O’Byrne School of Physics University of Sydney.
1 Can we afford to build an extremely large groundbased diffraction limited optical/IR telescope? Jim Oschmann Francois Rigaut Mike Sheehan Larry Stepp.
1 Astronomical Observational Techniques and Instrumentation RIT Course Number Professor Don Figer Telescopes.
George Angeli 11 September, 2001 Current Concepts and Status of GSMT Control Systems.
The Extremely Large Telescope Design Study in the Framework Programme 6 April 2003.
Tutorial: Design, Fabrication, and Testing of Aspheric Surfaces
Adaptive Optics for Wavefront Correction of High Average Power Lasers Justin Mansell, Supriyo Sinha, Todd Rutherford, Eric Gustafson, Martin Fejer and.
Adaptive Optics and Optical Interferometry or How I Learned to Stop Worrying and Love the Atmosphere Brian Kern Observational Astronomy 10/25/00.
Telescope Design The W.M. Keck (I & II) Telescopes Jana Hunt & Kent Van ME250 Precision Machine Design April 8, 2003.
On-Orbit Adjustment Calculation for the Generation-X X-ray mirror Figure D. A. Schwartz, R. J. Brissenden, M. Elvis, G. Fabbiano, D. Jerius, M. Juda, P.
AURA New Initiatives Office. Larry Stepp and Brooke Gregory The GSMT Point Design.
DRAFT (12/18/00) AURA’s road map to future 30m - 100m groundbased observatories - entering the “ era of the Giants ” in partnership The New Initiatives.
Generation-X telescope: Measurement of On-Orbit Adjustment Data Dan Schwartz, R. J. Brissenden, M. Elvis, G. Fabbiano, T. Gaetz, D. Jerius, M. Juda, P.
Figuring large off-axis segments to the diffraction limit Hubert Martin Steward Observatory University of Arizona.
Some large-telescope design parameter considerations: Distributed pupil telescopes J.R.Kuhn Institute for Astronomy, UH How to “distribute the glass” in.
AURA New Initiatives Office IAU Joint Discussion 8 July 17, 2003 Larry Stepp Future Giant Telescope (FGT) Projects and Their Technological Challenges.
Agenda GSMT Controls Workshop, 11 September, :00 am GSMT Overview – Brooke Gregory, Larry Stepp 9:30 am Pointing Control for a Giant Segmented Mirror.
8 September Observational Astronomy TELESCOPES, Active and adaptive optics Kitchin pp
Optics and Telescopes Lecture 11. Why do we use telescopes? Human eyes are lenses! Human eyes are lenses! Using larger lenses… Using larger lenses… 
Spin-Float production of thin paraboloidal segments in glass Piero Salinari Istituto Nazionale di Astrofisica (INAF) Florence, Italy.
Future of Astronomy Astronomy 315 Professor Lee Carkner Lecture 23.
Optical Design of Giant Telescopes for Space Jim Burge, Erin Sabatke Optical Sciences Center Roger Angel, Neville Woolf Steward Observatory University.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
Telescope Technologies
Telescopes & recent observational techniques ASTR 3010 Lecture 4 Chapters 3 & 6.
NST PRIMARY MIRROR CELL: ANALYSIS AND SOLUTIONS BBSO, 02/11/2004 Leonid Didkovsky.
1 The LOFT group Who we are Where we came from Where we are going Large Optics Fabrication and Testing ?
Adaptive Optics Nicholas Devaney GTC project, Instituto de Astrofisica de Canarias 1. Principles 2. Multi-conjugate 3. Performance & challenges.
“Twinkle, Twinkle Little Star”: An Introduction to Adaptive Optics Mt. Hamilton Visitor’s Night July 28, 2001.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
Page 1 Adaptive Optics in the VLT and ELT era François Wildi Observatoire de Genève Credit for most slides : Claire Max (UC Santa Cruz) Optics for AO.
K-D-PR Fabrication and testing of KGMT FSM prototype Oct Ho-Soon Yang, Hak-Yong Kihm, Il-Kwon Moon, Jae-Bong Song, Yun-Woo Lee Korea.
LMS11/26/01NIO Workshop on Wind Modeling Welcome and Introduction Larry Stepp.
1 Progress on the 30m Giant Segmented Mirror Telescope AURA New Initiatives Office Leiden, 17 May 2001 Matt Mountain Jim Oschmann Knut Olsen.
Optical Sciences Center and Steward Observatory University of Arizona
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
Technology Development for ELTs Doug Simons GSMT SWG April 28, 2003.
George Angeli 26 November, 2001 What Do We Need to Know about Wind for GSMT?
Behind the Buzzwords The basic physics of adaptive optics Keck Observatory OA Meeting 29 January 2004 James W. Beletic.
Na Laser Guide Stars for CELT CfAO Workshop on Laser Guide Stars 99/12/07 Rich Dekany.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
Design and Development of the FSM (Fast steering Secondary Mirror)
Pre-focal wave front correction and field stabilization for the E-ELT
Prof. Charles A. DiMarzio Northeastern University Fall 2003 July 2003
Wide field telescope using spherical mirrors Jim Burge and Roger Angel University of Arizona Tucson, AZ Jim
Part 2: Phase structure function, spatial coherence and r 0.
Adaptive Optics in the VLT and ELT era Optics for AO
AURA New Initiatives Office Euro50 - GSMT - XLT MeetingLMS, 08/02/02 The Giant Segmented Mirror Telescope.
Lightweight mirror technology using a thin facesheet with active rigid support J. H. Burge, J. R. P. Angel, B. Cuerden, H. Martin, S. Miller University.
GMT’s Near IR Multiple Object Spectrograph - NIRMOS Daniel Fabricant Center for Astrophysics.
Theme 2 AO for Extremely Large Telescopes Center for Adaptive Optics.
J. H. Burgea,b, W. Davisona, H. M. Martina, C. Zhaob
Parc Kennedy - Bat A , Rue Gilles Roberval / F NIMES  +33 (0) /  +33 (0) / Web :
Page 1 Adaptive Optics in the VLT and ELT era François Wildi Observatoire de Genève Credit for most slides : Claire Max (UC Santa Cruz) Basics of AO.
July © Chuck DiMarzio, Northeastern University ECEG105/ECEU646 Optics for Engineers Course Notes Part 4: Apertures, Aberrations Prof.
Ultra High Precision X-ray Telescope Project (X-mas Project) S. Kitamoto, T. Kohmura, N. Yamamoto, H. Saito, H. Takano, H. Sekiguchi, K. Suga (Rikkyo Univ.)
Lecture 14 AO System Optimization
Pyramid sensors for AO and co-phasing
Observational Astronomy
Theme 2 AO for Extremely Large Telescopes
Fraunhofer Diffraction
Astronomical Observational Techniques and Instrumentation
Theme 2 AO for Extremely Large Telescopes
Optics Alan Title, HMI-LMSAL Lead,
Theme 2 AO for Extremely Large Telescopes
Temporal Error Minimization In Adaptive Optics Control Loop
Presentation transcript:

LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Systems Issues: Optical Design & Fabrication GSMT Working Group on Optical Design & Fabrication David Anderson Richard Buchroeder Earl Pearson Tom Sebring Larry Stepp -- Chair

LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Optical Design & Fabrication Any telescope larger than ~ 8 meters will have a segmented primary mirror. l For mirrors larger than ~ 8 meters, costs increase rapidly for: l blank fabrication l polishing l transportation l coating

LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Optical Design & Fabrication Three large segmented-mirror telescopes already exist: l Keck I l Keck II l Hobby Eberly Several others are in work or have been proposed: l Gran Telescopio Canarias (GTC) l Large Aperture Multi-Object Spectroscopic Telescope (LAMOST) l Mexican Infrared-Optical Telescope (TIM) l Southern African Large Telescope (SALT) These projects serve as the starting point for the design of any extremely large telescope

LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Optical Design & Fabrication Key Systems Issues Primary mirror segment size l Segment size will affect the telescope structural design l Cost dictates segments smaller than about 2.5 meters l Blank cost per square meter l Low-cost optical finishing technologies l planetary polishing l replicating l ion figuring l Transportation l Coating facilities

LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Optical Design & Fabrication Key Systems Issues Primary mirror segment size l However, smaller segments also have drawbacks: l Increased number of rigid points required on structure l Increased number of actuators -- cost & reliability concerns l Increased control system computational requirements l Increased edge sensing error propagation The optimum is likely to be in the range of 1-2 meters.

LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Optical Design & Fabrication Key Systems Issues Spherical or aspherical segments? l Low-cost finishing technologies favor spherical segments l planetary polishing l replication (cost driven by number of masters) l Fixed-mirror telescope designs often use spherical primaries l For steerable telescopes, the optical design can provide better performance with fewer elements with an aspherical primary The low-cost production and testing of aspherical segments is a key area for development.

LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Optical Design & Fabrication Paraboloidal Segments Focal Ratio Asphericity calculated for worst case (outer edge) segments Stress calculated for a 50mm thick segment (varies linearly with thickness) 30-meter telescope Segment Size (meters)

LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Optical Design & Fabrication Paraboloidal Segments Focal Ratio Asphericity calculated for worst case (outer edge) segments Stress calculated for a 50mm thick segment (varies linearly with thickness) 50-meter telescope Segment Size (meters) For Keck primary: C4 = 101  m C6 = 13  m

LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Optical Design & Fabrication Key Systems Issues Petals l All petals in each ring are identical l Harder to polish (not close to round shape) l Edge sensor positions vary from one segment to another Hexagons l Only six copies of each segment type l Closer to circular shape --easier to polish l Edge sensor positions are the same for each segment Choice of segment configuration: petals vs hexagons

LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Optical Design & Fabrication Key Systems Issues The optical design will be driven by the requirements of the science instruments l Focal ratio l Field of view (& physical size of focal plane) l Image quality l Curvature of field l Control of distortion l Control of stray light l Photometric stability l Location, size and number of instruments Strawman instrument designs are needed as early as possible to guide the optical design work.

LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Optical Design & Fabrication Key Systems Issues Other optical issues l Atmospheric Dispersion Compensation l Segmentation effects in the point spread function l Coalignment effects l Satellite images l Diffraction spikes l Emissivity l Boundaries between segments l Large number of optical surfaces l Contamination control

LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Optical Design & Fabrication Key Systems Issues Complementarity of active and adaptive optics l Both active and adaptive optical systems will be needed l Active optics (low bandwidth) l Primary mirror segment position control l Primary mirror segment figure correction l Position control for secondary and tertiary mirrors l Figure control for secondary and tertiary mirrors l Adaptive optics (high bandwidth) l Image stabilization (large tip-tilt mirror) l Atmospheric compensation l Correction of local seeing effects l Fast correction of mirror figure errors These two systems must complement each other.

LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Optical Design & Fabrication Key Systems Issues Integration of adaptive optics components l In the Telescope l Traditional AO applications have placed the adaptive components far down the system l In Gemini-ALTAIR the first deformable mirror is M6 l This helps keep the components small l Recent concepts propose adaptive M4, M3, M2 or even M1 l Require locations conjugate to different heights, including zero l In the Instruments l To achieve performance goals, individual instruments may need to incorporate: l wavefront sensors l tip-tilt mirrors l deformable mirrors

LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Optical Design & Fabrication Key Systems Issues Control of wind buffeting l The telescope may have structural resonances down to ~ 1 Hz l The active segment alignment system must have a relatively low bandwidth to avoid exciting structural resonances l Wind buffeting will cause relatively large structural deformations at frequencies the active optics system may not be able to control l The wind could excite resonances in the structure that have large dynamic amplification factors l Vortex shedding may introduce other oscillations l Wind buffeting can be reduced by a fully protective enclosure, but this involves tradeoffs in enclosure cost and local seeing effects Wind buffeting will increase the demands on the adaptive optics system.

LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Optical Design & Fabrication CY2000 Studies Develop strawman designs of key science instruments l Diffraction-limited narrow field of view l Diffraction-limited wider field of view l Seeing-limited wide field of view Studies can be performed at NOAO and at Universities

LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Optical Design & Fabrication CY2000 Studies Measure wind loading on an 8-meter telescope l Two coordinated studies are planned: l Wind pressure on Gemini primary mirror surface l Measure the spatial and temporal variation of wind pressure on the Gemini M1 as a function of wind direction, elevation angle and size of vent openings l Principal investigator Dr. Myung Cho of Univ. of Arizona l Response of the Gemini telescope structure to wind loading l Measure the dynamic response of the Gemini telescope structure to the wind pressures measured in the coordinated study l Principal investigator Dr. David Smith of Univ. of Mass. These studies will provide key information for design of the telescope structure and adaptive optics system.

LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Optical Design & Fabrication CY2000 Studies Develop technology for fabrication of aspheric segments on a planetary polisher l First phase, in CY2000, will be to prepare a paper study evaluating feasibility and defining the technical approach l This will be followed in CY2001 by prototype fabrication studies l Possible contractors include Brashear, Carl Zeiss, Eastman Kodak, Raytheon, REOSC, Tinsley and Zygo This is a key investigation that could lead to a five-fold reduction in the cost of polishing aspherical segments.

LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Optical Design & Fabrication CY2000 Studies Investigate parallel work by other projects l NOAO and Gemini staff will investigate work being done for other projects, including OWL, CELT and NGST. l Optical designs l Optical fabrication l Lightweight segment designs l Segment control systems l Actuator designs Where possible, we will coordinate our studies with other projects and we will investigate the possibility of cost- sharing arrangements.