TNSP Outputs for Use in Economic Benchmarking AER Economic Benchmarking Workshop #2 14 March 2013 Denis Lawrence and John Kain.

Slides:



Advertisements
Similar presentations
NAESB Measurement and Verification Model Business Practice Retail Electric Demand Response 5/29/09 update.
Advertisements

Purpose overview of the form and use of the AER’s augex tool Not
Legal Framework, Investment Opportunities and Technical Innovation in the Electricity Sector Security of Supply through competitive markets: Design of.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Mountain Associates Reform of capital expenditure regulation Bruce Mountain Mountain Associates.
Amendment 3/5 Workshop.
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines General discussion of draft guidelines 2 September 2013.
Measuring TNSP Outputs for Economic Benchmarking AER Economic Benchmarking Workshop #5 2 May 2013 Denis Lawrence and John Kain.
US Department of Energy Smart Grid Computational Tool (SGCT) Overview Note: View presentation in Slide Show mode for best results
Energy regulation and quality of service Eric Groom FEU, World Bank 4 th Poverty Reduction Strategy Forum Athens, June
The Australian Energy Regulator Public Forum April 29 Expenditure incentive guidelines Presentation on key issues.
EIUG – Wheeling Methodologies
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Interactions with incentive frameworks.
Better Regulation Expenditure Forecast Assessment Guideline 12 February 2013.
RPI-X: Forecasting costs Regulation and Competition John Cubbin.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
Presented by: Fadhila MICHAEL C. NAUGHTON. Purpose  Develop and demonstrate a method for deriving and testing regulatory preferences within and across.
Resource Utilization Analysis Fuel Selection Steam Demands Combined Heat and Power.
The Australian Energy Regulator SA Electricity distribution determination 2015–2020 Consumer/stakeholder forum 3 September 2014.
NSP Inputs for Use in Economic Benchmarking AER Economic Benchmarking Workshop #3 20 March 2013 Denis Lawrence and John Kain.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER — Chris Pattas, General Manager - Networks ◦Consumer Challenge Panel — Hugh.
The Australian Energy Regulator Expenditure Forecast Assessment Guideline Category analysis Connections and Customer Driven Works.
Better Regulation workshop transmission outputs and environmental factors.
Viticulture– Electricity procurement Site / company name and logo here This is an AgriFood Skills Australia Ltd project developed in partnership with Energetics.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Smart Grid - Developments and Implementations Prof. Gady Golan – HIT, Israel Dr. Yuval Beck – HIT, Israel , Electricity 2012, Eilat.
VENCorp Revenue Proposal 1 July 2008 to 30 June 2014 Initial Public Forum Presentation.
Network Customer Meeting Access Metric Update November 16, 2006.
Reactive Power Federal Energy Regulatory Commission Open Meeting December 15, 2004.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Applications of Economic Benchmarking Techniques 6 June 2013.
Measuring NSP Inputs for Economic Benchmarking AER Economic Benchmarking Workshop #6 7 May 2013 Denis Lawrence and John Kain.
Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals December 2014.
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
Strategic Planning for DSM in a Community-owned Utility Presented by Shu-Sun Kwan & Ed Arguello Colorado Springs Utilities 2005 APPA Engineering & Operations.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦ AER – Chris Pattas, General Manager – Networks ◦ Consumer challenge panel – Ruth.
The strategy for improved electricity distribution maintenance 9 June 2008.
The Australian Energy Regulator Economic benchmarking TNSP outputs data.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Better Regulation workshop distribution outputs and environmental factors.
Regulatory road maps for the integration of an increasing amount of variable DG/RES-E Jeroen de Joode / Adriaan van der Welle / Frits van Oostvoorn Energy.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
The Australian Energy Regulator Expenditure Forecast Assessment Guideline Category analysis Connections and Customer Driven Works.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
TNSP Operating Environment Factors for Use in Economic Benchmarking AER Economic Benchmarking Workshop #2 14 March 2013 Denis Lawrence and John Kain.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
The Australian Energy Regulator Economic benchmarking DNSP outputs and environmental factors.
Getting Ready! Potential issues for consumers Queensland Distribution Network Regulatory Proposals Bev Hughson, Consumer Challenge Panel (CCP) 8 August.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Better regulation workshop Economic benchmarking inputs.
1 Basic Concepts on Power Supply Agreement (PSA) Francis Saturnino C. Juan Executive Director Energy Regulatory Commission.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
1 ACCC Workshop on the DRP Incentive Mechanisms and Benchmarking.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Proposed framework for charges for generators connected to the Distribution network Please note that the contents of this presentation are proposals at.
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
Economic Benchmarking vs Financial Incentives – an alternative to incentivising performance in the gas industry? Ashley Muldrew, Gas Speak 2015.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Identifying drivers of expenditure. Reasons for spending money 2 Effective regulation requires an understanding of why a business spends money Many different.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Quality Framework Proposal
California Product Offerings
System information provision
Asset Governance – Integrated Strategic Asset Management
Presentation transcript:

TNSP Outputs for Use in Economic Benchmarking AER Economic Benchmarking Workshop #2 14 March 2013 Denis Lawrence and John Kain

2 Economic benchmarking Compares the overall quantity of outputs produced to the overall quantity of inputs used and costs incurred across TNSPs and/or over time Holistic, tops-down measure Range of techniques used: total factor productivity (TFP), multilateral TFP, econometric cost functions, data envelopment analysis, stochastic frontier analysis Use in building blocks regulation:  Initial screening – accept revealed cost vs detailed analysis  Is base year expenditure efficient?  Efficiency improvement to be included in rates of change  Benchmarking reports

3 Data requirements Require data on the price and quantity (and hence value) of all outputs and inputs and on the quantities of operating environment variables (noting that output prices may be shadow prices where the output is not explicitly charged for) This then allows any of the key economic benchmarking methods to be implemented Given its tops-down nature, it is important to concentrate on a relatively small number of key outputs in economic benchmarking Desirable to have robust and consistent data Data backcasting may be possible and facilitate early use

4 Billed outputs are those items an NSP actually charges customers for NSP charging practices have sometimes evolved on an ease of implementation basis rather than on a fully network cost-reflective basis High proportion of charges often on energy throughput Dimensions that customers may value such as reliability, continuity or speedy restoration after any interruption are not explicitly charged for Functional outputs are all those services NSPs provide to customers which are valued by customers (of which billed outputs are a subset) ‘Secondary deliverables’ affecting current and future system security may also be relevant for TNSPs Billed vs functional outputs (1)

5 Under building blocks the revenue requirement is set based on the TNSP being expected to meet a range of performance standards and other deliverables required to meet the expenditure objectives Charges typically only imposed on a subset of performance dimensions considered in setting the revenue requirement In the case of building blocks, it will be important to measure output (and hence efficiency) in a way that is broadly consistent with the output dimensions implicit in the setting of NSP revenue requirements Points to functional rather than billed outputs specification but sensitivity analysis important Need criteria to choose functional outputs to include Billed vs functional outputs (2)

6 1) the output aligns with the NEL and NER objectives which are to: a)meet or manage the expected demand for prescribed transmission services b)comply with all applicable regulatory obligations or requirements associated with the provision of prescribed transmission services c)maintain the quality, reliability and security of supply of prescribed transmission services, and d)maintain the reliability, safety and security of the transmission system through the supply of prescribed transmission services 2) the output reflects services provided to customers, and 3) the output is significant Output selection criteria

7 The short list throughput (total or by broad user type or by location) number of entry and exit points measured maximum demand for those users charged on this basis system capacity (taking account of both transformer and line/cable capacity) market dispatch intervals with market impact of outages greater than $10/MWh loss of supply event frequency average outage duration, and circuit availability

8 Energy throughput  Little impact on costs  Proxy for load?  Road analogy Entry and exit point numbers  Proxy for fixed connection output components  Output or secondary deliverable? Demand-based outputs  Based on contracted or measured maximum demand  Data should be readily available  Scores well against selection criteria Billed outputs

9 System capacity  Captures capacity to deliver (road analogy)  Line capacity or line and transformer capacity?  Robust data readily available Peak demand  Important cost driver but customers see reliability at peak as relevant output  Volatility and incentive effects Circuit availability and reliability  Reliability important to customers  STPIS includes three broad types of indicators: service, market impact and network capability Other functional outputs (1)

10 Other functional outputs (2) Circuit availability and reliability (cont’d):  STPIS service category includes 4 components: average circuit outage rate, loss of supply event frequency, average outage duration and proper operation of equipment  Market impacts and some service indicators score well against selection criteria Broader obligations  Can include environmental, customer satisfaction and social obligations  Hard to measure  Materiality?  Ofgem secondary deliverables to manage future risk

11 Output weights Need weights to aggregate outputs into an aggregate output measure or to assess shadow weights estimated by the model Revenue weights or cost-reflective weights Forming output weights on a cost–reflective basis is likely to provide the most practical option going forward Cost function methods provide one way of doing this Information TNSPs use to demonstrate compliance with regulatory pricing principles and for internal planning purposes might provide another means of forming cost- reflective output weights Other methods may be required to allocate a value to reliability outputs

12 The short list throughput (total or by broad user type or by location) number of entry and exit points measured maximum demand for those users charged on this basis system capacity (taking account of both transformer and line/cable capacity) market dispatch intervals with market impact of outages greater than $10/MWh loss of supply event frequency average outage duration, and circuit availability